襯砌隧洞 的英文怎麼說

中文拼音 [chènsuìdòng]
襯砌隧洞 英文
lined tunnel
  • : Ⅰ動詞1 (在裏面托上一層) line; place sth underneath 2 (陪襯; 襯托) set off Ⅱ名詞(襯在裏面的附...
  • : 砌Ⅰ動詞(用磚、石等壘) build by laying bricks or stones Ⅱ名詞(臺階) step
  • : Ⅰ名詞1. (隧道; 地道) tunnel; underground pass2. [書面語] (道路) road3. (郊外的地方) suburbsⅡ動詞[書面語] (旋轉) turn
  • : Ⅰ名詞(物體上穿通的或凹入較深的部分; 窟窿; 洞穴) hole; cavity Ⅱ形容詞(深遠; 透徹) profound; thorough; clear
  1. In addition, this paper carry out successfully the support design practice in the preceding excavation of 4km long exploratory tunnel. according to the thesis research results, the following conclusion can be drawn. if the grouting rock can possess sound anti - seepage capability and the liner structure can hold higher hydraulic permeability relatively, and if the adjoining rock can be made as primary load - bearing structure by construction measure, the stability of country rock and the safety of liner structure will be guaranteed

    計算結果表明,如果能使錦屏工程引水灌漿圈圍巖具有較好的防滲性能,將高外水壓力控制在灌漿圈以外,再配合透水性相對較好的支護結構以及排水措施,使灌漿圈圍巖成為主要承載結構,並使結構和灌漿圈共同承載,是可以保證圍巖的穩定和支護結構安全的。
  2. Fist of all, on the basis of the research of agone boffins, this author investigates the interaction mechanism of bolts and rock, and introduces the elastic ? lastic analytical resolution which is consist of the liner structure, the equivalent reinforced wall rock and the original wall rock in the simple loading from the equivalent well - proportioned view ; this solution is very important meaning for the engineering design. on the basis of coulomb friction model, the author introduces the finite element equation of the contact problem in order to provide the academic foundation for the application of msc. marc. finally, combining the engineering practice of the non - linear analysis of shield tunnel through yellow river of the south - north water transfer and using the model of friction, the author researched the evolution law of stress and displacement field in the structure of grouted rock bolts, and analyzed the effect to the stress and deformation of surrounding rock mass due to anchor supports

    首先,在前人研究成果的基礎上,對錨桿與圍巖的相互作用機理進行研究,利用全長錨固錨桿的中性點理論,從等效均化的角度來考慮錨桿對圍巖的加固作用,並推導了在簡單荷載作用下,含有、等效加固后的圍巖、原始圍巖三者的彈塑性解析解,對工程設計有著重要的參考意義;在數值模擬方面,以考慮錨固圍巖滿足規則化庫侖摩擦模型為基礎,利用虛功原理推導了接觸問題的有限元方程的計算格式,為開發運用大型商用有限元軟體msc . marc提供了理論根據,也形成了本文的理論基礎:最後,論文以南水北調東線穿黃穩定性分析項目為工程實例,利用本文所述的接觸問題的摩擦模型理論,對錨桿支護結構的應力場、位移場的變化規律進行了研究,分析了加錨支護對圍巖應力、變形的影響。
  3. If the character of wall rock is finer, it is smaller for suffered force and distortion of tunnel pipe liner structure, contrarily it is bigger

    性態好的圍巖,的受力和變形較小,反之則較大。
  4. In order to detect the bottom thickness, cavity, leak and deformation of steel meshes in secondary lining of concrete in tunnel construction, the authors evaluate the wave character and the detected result in the second lining of the tunnel using surveying radar technology and conclude the wave character in the tunnel lining which has mass defect and tested the accuracy and reliability of this technique

    摘要為檢明道混凝土二次中的底界厚度、空、漏水、鋼筋網變形等質量問題,利用探地雷達技術,通過對檢測方法及工程檢測實驗的研究,進行道二次中雷達波形特徵參數及檢測結果評價,總結了質量問題的雷達波形特徵,驗證檢測方法的精度和可靠性。
  5. Evaluation of the effect of collapse in top area of a double - arched tunnel on its the secondary lining

    雙連拱頂坍方對二次穩定影響評價
  6. Structural analysis for the liner and surrounding rocks of diversion tunnel in jinping waterpower station

    錦屏二級水電站深埋引水及圍巖結構分析
  7. The geological conditions are very complicated in hejiazhai tunnel which is located in guizhou shuibo railway, this tunnel is named " mashed tunnel " with the most difficult geological conditions such as the high dense gas and developed karst and gushing water assembled together, the geological hazards like the gushing water and sand, the collapse of tunnel, surface subsidence and slide, cracking of tunnel lining were often happened during construction period

    摘要貴州水柏鐵路何家寨道,工程地質條件極其復雜,集「高瓦斯、強巖溶、大涌水」為一體,施工期間曾發生多次涌水涌砂、內坍方、地表塌陷與滑坡、支護開裂變形等地質災害,堪稱水柏鐵路施工難度最大的「爛子」 。
  8. As support and liner against cross section rock, spraying - concrete has enormous influence on the tunneling progress and the safety of the tbm tunnel ' s tunneling machine

    作為斷面巖石支撐和的重要手段之一的噴射混凝土支護對tbm掘進機掘進進度和安全影響極大。
  9. The common methods of realization of visualization in scientific calculation are suggested in this paper, and the calculation example in engineering indicates that the visualization system of hydraulic tunnel section lining design is practical and steady

    本文論述了實現科學計算可視化的一般方法,並通過計算工程實例,證明了水工斷面計算可視化系統的實用性和穩定性。
  10. Based on review of hydraulic tunnel developments both domestic and abroad, the advance of computer aided design of the tunnel section lining is summarized, the visualization system of hydraulic tunnel section lining design is researched

    本文根據水工建設的發展需要,在分析和總結了目前水工斷面計算機輔助設計發展狀況的基礎上,研究了水工斷面計算的可視化系統。
  11. The theory and its calculated methods of tunnel section design is researched in this paper, including the foundation and methods of the choice of profile and line types, and value and distribution of load, and the common calculated methods of lining structure

    研究了水工斷面設計的理論及其計算方法,包括斷面選型和型式選擇的依據和方法,荷載的取值和分佈,結構常用計算方法的研究。
  12. The results of the studies show that the size, length, and scope of tunnel lining crack can be identify by infrared thermography images

    經實地檢測高雄市西子灣道和高雄縣大關山道,發現之孔與裂縫部位,其紅外線熱影像溫度差異變化大於沒有孔裂縫之
  13. In - site studies are carried out at the kaohsiung hiziwan tunnel and the daguan mountain tunnel to evaluate the quality of tunnel lining

    研究結果顯示之裂縫、空等瑕疵,透過紅外線探測與比對色階,可判斷出其位置、大小與范圍。
  14. Study on loads test of shield tunnel segment reinforced by double linings

    盾構雙層接頭荷載試驗研究
  15. In order to calculate the high external water pressure, the rock seepage field and external water pressure coefficient should be treated in detail. concentrated on the questions of high external water pressure and flow of the deep - lying tunnel, the basic theory and method calculating external water pressure are systematically studied, the high external water pressure of jinping cascade 2 hydropower station is analyzed and studied in detail

    本文在總結前人研究成果的基礎上,圍繞深埋的突涌水和高外水壓力問題,系統地研究了深埋水荷載和外水壓力的作用機理及計算方法等理論,並對錦屏二級水電站深埋引水的外水壓力問題進行了詳細的分析和研究。
  16. Complicated hydrologic and geographic conditions, and the large scale of the xiaolangdi hydraulic project on the yellow river are introduced briefly. three desilting tunnels are designed to meet the requirements of flood control, sediment discharge and runoff regulation. according to the performance requirements of desilting tunnels, the tunnel lining down - stream of the grouting curtain is designed to be post - tensional prestressed lining. on the basis of investigation and research, experiements and analysis, the unbonded prestressing system is used. it is the largest unbonded prestressed tunnel lining project in the world, and the first one in china

    簡介黃河小浪底水利樞紐復雜的水文、地質條件以及龐大的工程規模.該樞紐設計有3條排沙,擔負著泄洪、排沙、調節徑流和保證進水口不被泥沙淤堵的任務.根據排沙的水庫運用要求,灌漿帷幕下游排沙身段設計為混凝土后張預應力.通過大量的調研、試驗、分析論證,在施工前確定該預應力方案選用無粘結預應力系統,成為目前世界上規模最大的無粘結預應力工程,在國內尚屬首例
  17. During tunnel construction, both the excavation and lining are on the critic path of the line - period of the construction

    摘要在工程施工中,開挖與均處在關鍵線路上,佔用直線工期。
  18. If lining combine with surrounding rock closely, it can be calculated together with rock pressure with coupling model

    外水壓力是和有壓中內水壓力相對而言的,作用對象為
  19. ( 2 ) the method of finite element discrete and optimal parameter back analysis is adopted. ( 3 ) concentrated on the question of high external water pressure of the deep - lying tunnel, the basic theory and method calculating external water pressure are systematically studied. ( 4 ) based on jinping cascade 2 hydropower station, numerical simulation rain infiltration of seepage field under different drainage pattern and grouting pattern are studied, also, the high external water pressure is analyzed and studied and some seepage control measures are put forward

    ( 2 )採用有限元離散?優化法進行參數的反演分析; ( 3 )針對深埋的高外水壓力問題,進一步分析和研究了水荷載及外水壓力的作用機理和計算方法; ( 4 )以錦屏二級水電站深埋長引水作為本文的主要研究對象,採用考慮降雨入滲滲流場分析的方法對排水方案和灌漿封堵方案不同情況下的滲流場的水頭分佈進行了數值模擬,並對其外水壓力進行了分析和研究,提出了滲流控制的具體措施。
  20. This paper discusses elimination of disturbance, detection of air - raid shelter, check up of road surface and lining quality of channel and detection of karst cave

    文章針對消除干擾的方法、關于防空探測、關于公路路面檢測和質量檢測、地下巖溶探測等內容進行了探討。