要求承載力 的英文怎麼說

中文拼音 [yāoqiúchéngzǎi]
要求承載力 英文
required bearing capacity
  • : 要動詞1. (求) demand; ask2. (強迫; 威脅) force; coerceⅡ名詞(姓氏) a surname
  • : Ⅰ動詞1 (請求; 要求) ask; beg; request; entreat; beseech : 求人幫忙 ask sb a favour; ask a favou...
  • : Ⅰ動詞1 (托著; 接著) bear; hold; carry 2 (承擔) undertake; contract (to do a job) 3 (客套話...
  • : 載Ⅰ名詞(年) year : 一年半載 six to twelve months; six months to a year; 三年五載 three to five ...
  • : Ⅰ名1 (力量; 能力) power; strength; ability; capacity 2 [物理學] (改變物體運動狀態的作用) forc...
  • 要求 : ask; demand; require; claim; requisition
  1. Simultaneously, combine with his own work experience, the author gets an advanced detail and general design steps. and then illustrates an actual engineering which is designed with the article ’ s recommendatory method and steps. by combining with the test results, it is proved that the ground treatment result obtains the design requirement and the commendatory method is right, which is able to provide reference value to the engineering

    本文首先對加筋土的研究現狀做了詳細的介紹和分析,在此基礎之上,對加筋土地基設計方法做了一定的研究,對地基設計方法做了對比分析,選擇極限分析法作為本文的推薦方法,並結合作者自身的工作經驗,提出了加筋土地基詳細和全面的設計步驟,然後用一個加筋土地基實際工程為例,採用本文推薦的設計方法和步驟進行設計,並通過現場試驗結果,證明該地基處理達到設計,也證明了推薦方法計算的準確性,這對廣大工程師在實際工程操作中有較高的參考價值。
  2. The corbel ' s dimension should be ascertained as the manipulative condition of diagonal section. the amount of longitudinal reinforcement be ascertained on the basis of the flexure model, is obtained according to static for balance condition, the calculative expression of the load is obtained. and in terms of the design method in ultimate state the maximum load

    我國規范對于牛腿的設計規定,牛腿尺寸的確定以斜截面抗裂作為控制條件,縱筋用量的確定以彎壓破壞模型為基礎,根據靜平衡條件得到的計算公式,按照極限狀態設計方法計算得到,箍筋用量則按照構造確定。
  3. Meanwhile, by using delaminating combination finite element method and macro finite element analysis methods, the paper present two kinds of analysis programs. based on the aforementioned analysis program, the failure form, distribution of plastic hinge, load - carrying capacity, displacement and ductility characteristics are investigated to reveal the failure mechanism and the failure proceeding under seismic effects. the results are in good agreement with the test results, indicating the precision of the aforementioned two programs is satisfiable to the practical engineering design

    分別採用分層組合式有限元和宏觀有限元分析方法,編寫了2種鋼筋混凝土中高帶邊框柱剪墻結構的彈塑性有限元分析程序,同時利用上述2種分析程序,研究了模型結構的破壞形態、塑性鉸的分佈、、位移及延性性能等特性,探討了這類結構在地震作用下的破壞全過程與破壞機理,得到其主特性和抗震性能的一般規律,所得結果與試驗值吻合較好,表明上述2種程序分析結果的精度均可滿足實際工程的設計,因此可用於這類結構的抗震性能分析與設計。
  4. Due to exceedingly flat arched vault of the flat tunnel with outsized span and renewed stress allocation in surrounding rock after excavation, which would inevitably induce some excessively large load on the base of arch, therefore, larger load - bearing capability in the is " foundation is a must. on the other hand, smooth face explosion must be applied to excavation of the arch base to further ensure the integrity and continuity of country rock around tunnel

    特大跨超淺埋隧道拱部結構過于扁平,開挖后發生二次應分佈,拱腳處的應過大,有較大的地基,拱腳開挖時必須採用光面爆破,保證圍巖的完整性和不受擾動,開挖后及時封閉,防止該處積水軟化圍巖。
  5. It also has important reference value for the similar construction. by the safety and seismic evaluation of this aqueduct bridge, it has shown that ( 1 ) besides the structure of this aqueduct bridge was basically unharmed without some flake of concrete cover and revealing stirrup, its intensity basically reached the need of primary design. ( 2 ) from the side of carrying capacity, rib arch could satisfy the needs under the action of wind and earthquake, but some individual frame crossbeams and most rib arch tie beams could n ' t satisfy the need

    通過對東滑峪渡槽進行安全性能和抗震性能評估后表明: ( 1 )渡槽除肋拱頂面有保護層剝落、箍筋外露,結構基本完好,其強度基本達到西安理工大學工程碩士專業學位論文原設計的強度; ( 2 )從方面看,在風荷、地震作用下,肋拱基本滿足,個別排架橫梁不滿足,肋拱連系梁普遍不滿足;計入水平橫槽向地震作用的工況為設計控制工況。
  6. An important step in structure design is the calculation of the ultimate flexural strength of external prestressed concrete beams, which needs to calculate the ultimate stress increment of external tendons first

    結構設計的一個重環節就是極限計算,而計算體外預應混凝土梁的極限就必須得梁在破壞時的體外筋應增量。
  7. The number of modes should be selected according to the participant coefficient of mode when calculating the internal force by the response spectrum method ; ( 4 ) the roof plate of large base which connect the towers together should be thick enough but not exceeding the proper scope that the towers and the large base can vibrate together, ( 5 ) in structures with large base and muti - towers, with increasing of the capacity of the large base, the inter - story shear force will increase while the inter - story displacement will decrease as to fulfill the ductility request to avoid the large base becoming weak story, but meanwhile, the upper story will turn into weak story, thus the coefficient r s should be within 2. 0 ~ 3. 0

    採用振型分解反應譜法計算結構內時應根據振型參與系數選擇振型避免漏選;大底盤多塔樓結構連接各塔樓的裙房屋面剛度應做得大些,以保證底部裙房與上部塔樓共同振動,但也不能過剛;大底盤多塔樓結構底盤的加強將使底盤層剪增大、層間變形減小,但易於滿足延性,在一定程度上可避免底盤成為薄弱層。但底部加強會導致薄弱層的上移,因此採取提高底盤的措施的效果是有限度的,系數s宜取為2 . 0 3 . 0之間。
  8. The construction execution of prestressing work has many advantages such as : dry - work, rapidity, no organic adhesion agent, small space to be taken, the high efficiency of strengthening, so this way can be applied in the structures which request to improve bearing capacity largely and take small space after strengthening as well as other structures which will work in long time and in high temperature

    預應加固過程是干作業,施工速度快,不使用有機粘結劑,加固后佔用空間小,加固效率高,適用於大幅度提高及加固后佔用空間小的混凝土結構,也適用於施工速度快,加固后使用年限長,工作環境溫度高的結構。
  9. In foundation treatments of buildings or structures in sandy region, the sand compacted by down - seepage water technique is adoptable to enforce the compactness and bearing capacity of sand and soil cushion to meet the design requirements

    在砂土地區進行建(構)築物的地基處理時,採用水墜砂技術可使砂土墊層的密實度和達到設計
  10. The research shows that : 1 ) the ductility of the hsc bending members constructed is much greater than 5 ; 2 ) increasing the vertical links and distribution steel can increase the deflection under ultimate moment ; 3 ) with appropriate compressive bars, vertical links and distribution steel the increase of moment after yield and the decrease of moment under ultimate moment can be ignored, so the ductility of the hsc bending member is much larger ; 3 ) the width / depth ratio of hsc bending member has no obvious effect on the ultimate compressive strain of concrete ; 4 ) the method used here to calculate the deflection is applicable ; 5 ) the location of crack coincides with the location of vertical links and distribution steel ; 6 ) the bending property of the hsc structure under the blast load can meet the demand of protective engineering

    研究表明:本文研究的梁、板構件的延性比遠大於5 ;增加箍筋(鉤筋、分佈筋)含量,可以提高壓區混凝土剝落時的撓度;在適當的受壓筋、箍筋(鉤筋、分佈筋)含量下,可以忽略壓區混凝土剝落瞬間的下降,從而大大提高構件的延性;受彎構件的寬高比對壓區混凝土極限應變的影響不明顯;受彎構件的裂縫間距受箍筋(鉤筋、分佈筋)的布置影響;文中所用的和變形計算方法是可行的。化爆試驗表明,高強混凝土構件的動抗彎性能能夠滿足防護結構的
  11. To evaluate load bearing capacity of slab with slightly curved bottom, and provide scientific basis for strengthening and remaking and designing the slab, this paper discuss the method of calculating load bearing capacity of slab with slightly curved bottom according to the ministry of communications " scientific research project, that is technique research of detection, evaluation and strengthening and its spread

    為了對其做出較正確評價,並能為加固改造、設計提供科學依據,根據交通部《公路舊橋檢測評定和加固技術研究及推廣應用》科研項目的,本文對微彎板的確定方法進行研究。
  12. According to the empirica1 design methqds, we can safe1y say that the method proposed can satisfy the 1imit state of load bearing capacity as we11 as that of the serviceabi1ity l imit state

    根據鋼筋混凝土桿系結構設計經驗,可以認為該法同時滿足了結構極限狀態和正常使用極限狀態的
  13. With the reconstruction of old road, the upgrade of road scale, the accretion of traffic quantity and the manifold of heavy vehicle in my country recently, our desire is higher and higher about the transit capacity of the old bridges. it is more impendent to confirm practice status and supporting load of these bridges on the calzada

    近年來隨著我國路網改造、舊路改建和公路等級的提升,交通量的日漸增大,重型車輛的日漸增多,對原有的公路舊橋的通行能愈來愈高,確定此類公路橋梁的實際使用狀況和實際就顯得尤為迫切。
  14. ( 3 ) it is known that load effect is not consistent with the section resistance incommon section continuous composite beam. a kind of composite beam with itsrational section size is suggested, which is consist of the t shape concrete beam andsteel girder. this kind of composite beam not only has enough carrying capacity, almost has same positive and negative resistance moment, but can decrease theamount of the steel

    ( 3 )分析可知連續組合梁的跨中、支座截面處荷作用效應及截面抗規律不匹配,本文提出了採用t形混凝土梁和工字鋼代替一般的混凝土板和工字鋼的組合梁截面形式,並給出了截面尺寸比例,能使正負截面抵抗矩接近,符合組合梁受特徵,減少了材料用量,滿足和剛度等
  15. Finally, a set of equations is proposed to predict the ultimate strength of such connections, the results of which accord with that of both tests and fea

    在此基礎上,對矩形鋼管混凝土t 、 y型節點的構造進行了探討,提出了可供工程應用的矩形鋼管混凝土t 、 y型節點極限計算公式。
  16. According to the results of the tests and finite element program, the paper put forward the structure need of the cement - soil mixing pile with concrete core, gives the calculating formula of pile ' s bearing capacity

    根據室內外試驗和有限元分析的結果,提出水泥土組合樁的構造和水泥土組合樁豎向計算公式。
  17. The calculation results using the formula in code for design of concrete structures ( gb50010 - 2002 ) can fulfill requires of design

    按照現行規范《混凝土結構設計規范》 ( gb50010 - 2002 )驗算,均可滿足
  18. According to the demand of 《 code for seismic design of building 》 ( gb50011 - 2001 ), furthermore, based on the experimental study of two 1 / 15 reduced - scale shear wall models under low frequency cyclic and reversed lateral loads, the interacting behavior of the r. c frame column and the shear wall is studied, the failure mechanism and energy dissipation mechanism of moderate and tall shear wall with r. c frame column are compared, the seismic behavior is evaluated by the comparison of strength, stiffness, ductility, restoring force characteristics as well as energy consumption ability. it was showed by the experimental results that the earthquake resistant energy dissipation ability of the shear wall with frame column is satisfactory

    因此,為了探討這類剪墻結構的抗震性能,本文以我國現行《建築抗震設計規范》 ( gb50011 - 2001 )的為基礎,通過1 15的縮尺比,將一縱向框架一剪墻原型結構中的剪墻結構模擬為一個試驗模型並對其進行了偽靜試驗,研究了墻板與邊框柱的共同工作性能,分析了帶邊框柱中高剪墻的受特點、破壞及耗能機理,並從、剛度、變形、延性及恢復特性等方面綜合評價了其抗震性能,得出了一些有益的設計理念和方法。
  19. So the methods of design and computing about limit condition of bearing capacity is still adopted in present criterion. under the precondition of meeting the demand of construction ' s using function, the main content that is researched in this article is how to make the scheme of mixed soil - cement piles composite ground on the safe side economical and reasonable, according to the rule of the design for deformation control the article, which is based on formers " theory and practice, combining with the example of engineering, utilizing the tool of matlab. 5. 0, using optimizing by plural modality method, makes a primary discussion on the design parameter of the scheme for mixed soil - cement piles composite ground, according to the rule of the design for settlement controlment method

    在現行規范中仍然採用的是極限狀態設計計算方法。在滿足建築物使用功能的前提下,如何按照變形控制設計的原則,使得水泥土攪拌樁復合地基方案更加安全可靠、經濟合理,是本文研究的主內容。本文在總結前人的理論和實踐成果的基礎上,結合工程實例,利用matlab . 5 . 0工具,採用復形調優法,按沉降控制設計原則,對水泥土攪拌樁復合地基方案設計參數的優化進行了初步的探討,得出了一些有益的結論,對工程實踐具有一定的指導意義。
  20. Light adjustable base plates for scaffolds ; structural requirements, assessment of load - bearing capacity and inspection

    腳手架的輕型可調節底板.結構的評估和
分享友人