計價模式 的英文怎麼說

中文拼音 [jiàshì]
計價模式 英文
valuation models
  • : Ⅰ動詞1 (計算) count; compute; calculate; number 2 (設想; 打算) plan; plot Ⅱ名詞1 (測量或計算...
  • : 名詞1. (價格) price 2. (價值) value 3. [化學] (化合價) valence
  • : 模名詞1. (模子) mould; pattern; matrix 2. (姓氏) a surname
  • : 名詞1 (樣式) type; style 2 (格式) pattern; form 3 (儀式; 典禮) ceremony; ritual 4 (自然科...
  • 計價 : valuation
  • 模式 : model; mode; pattern; type; schema
  1. Brief discussion on project tendering with boq pricing mode

    淺議工程量清單計價模式下的工程招投標
  2. Along with the construction market further opening after china ' s entry into wto , in order to connect the international consuetude as soon as possible , it is essential to implement the mode of valuation with bill of quantities in our country

    隨著我國加入世界貿易組織后建築市場的進一步開放,為了能與國際慣例盡快接軌,在我國建設工程中推行工程量清單計價模式十分必要。
  3. Valuating model of engineering quantities dill in inviting tender and bidding

    工程招投標中的工程量清單計價模式
  4. Capital assets pricing model

    資本資產計價模式
  5. This paper is focused on the measuring methods of human resource and contains six sections, which are the developement of hra, the significances, current situation and difficulties of reaserch for hra in china, the two premises of measuring human resource, the fundamental theories of measuring human resource, the practical choice of measuring methods of human resource asset & the practical choice of measuring methods of human resource income

    本文正是以人力資源會量問題為核心,分別論述了人力資源會的發展、我國研究人力資源會的意義、現狀和難點、人力資源會量問題需要解決的兩個前提、人力資源會量的基本理論、我國人力資源資產計價模式的現實選擇以及我國人力資源收益決定的現實選擇。
  6. In this paper, the author compares various measuring methods considering the fundamental theories of measure and the current situation of china. then the author chooses the reasonable methods to measure human resource asset and human resource income based on the compare, which is benefit for the adoption of hra in china

    本文從會量的基本原理出發,考慮我國的實際情況,對現有的各種進行了充分的比較,並在此基礎上選擇了合理可行的人力資源資產計價模式和人力資源收益決定,為人力資源會在我國的推廣和應用作了理論上的探索。
  7. Engineering bill pricing and bidding system

    工程量清單計價模式下的工程施工投標報
  8. Call for tender under model of quantity sheet valuation

    工程量清單計價模式下的招投標工作
  9. Engineering bidding under the bill of quantities mode

    工程量清單計價模式下的工程招標
  10. Discussion on bidding offer for quantity bill pricing mode

    工程量清單計價模式下投標報的探討
  11. Mode of evaluation with bill of quantity

    淺議工程量清單計價模式
  12. Quoting tactics of construction enterprises under engineering bill pricing mode

    工程量清單計價模式下投標報的思考
  13. Study on the affects and measures of using bill quantity in construction enterprise

    推行工程量清單計價模式對建築企業的影響及對策研究
  14. The fabrication cost mode by project quantity bill is popularly practiced in the fabrication cost management of international projects

    摘要工程量清單計價模式是國際工程造管理的通行做法。
  15. Meanwhile, the mode of bill of quantity, which is implemented in china from this year, has given the cost engineer a new task and responsibility and of course the risk of taking this responsibility

    同時,我國從今年起在工程建設領域中推行的工程量清單計價模式,給造工程師提出了新的任務和責任,伴隨責任就產生了風險。
  16. This paper is carried out for analyzing the basis of the actual expenses constitution of the construction installation engineering, the engineering valuation policy under the actual tender and bidding system and the engineering valuation mode in hong kong, the united states and japan. it emphatically discusses the choice and establishment of the list of engineering amount valuation system of the construction engineering in our country from the three aspects of the establishing principle of the list of engineering amount, the analysis of the quoting process and the content of the quoting basic form

    本文擬在分析我國現行建築安裝工程費用構成及其現行招投標體制下的工程政策和香港地區及美國和日本的工程計價模式的基礎上,著重從工程量清單的編制原則、報流程分析、報基本表格的內容三個方面論述我國建設工程工程量清單體系的選擇與建立。
  17. Then , the main discussion in this thesis is what measures can be taken to subcontractors in our country in facing the new mode of valuation with bill of quantities. the conclusion are that , at the first , they should faster the step to compile enterprise inner norm. construction enterprises must compile bid documents scientifically , reasonably based in the self - inner norm which can reflect the actual expenditure and true technical and management standard

    接著該論文重點討論面對新工程造計價模式,我國建築承包商應採取的措施:加快編制企業內部定額的步伐,投標企業必須以科學、合理,能夠反映企業實際消耗和真實技術、管理水平的企業定額為基礎編制投標書,才能做出有競爭力的報;加強企業內部成本核算,從工程投標到竣工分不同的階段協調各相關部門工作,制定獎懲制度,有效降低成本,對于隱性成本也採取相應措施加以控制;改革企業經營機制,提高企業的人員素質,大力開發新技術、新工藝,提高企業科技含量。
  18. The engineering work load detailed list reckoning method has the advantages of simple, clear, operation easily, remaining the account settlement rarely, etc compared with the present day running unit price budgeting method, which will be the direction of national engineering cost system reform, cost management first, this text states thoroughly the existing problem of the present day national engineering mode and price reckoning method, and the necessity of application right away and the existing problem, and then make a detailed discussion of the principle of quota reckoning and the engineering work load detailed list reckoning, so that we may be safe to draw such a conclusion that the new cost management system of the new price reckoning method is a necessary way to adapt to the international competition

    工程量清單法與目前我國實行的預算單法相比,有簡單、清晰、可操作性強、不易留結算尾巴等優點;是我國工程造體制改革的方向。本文首先全面闡述了目前我國工程造管理存在的問題以及現在推行的必要性及存在的問題,進而對定額和工程量清單的原理進行了詳細的論述,從而得出實行新的的造管理體制是適應國際化競爭的必走之路。然後,對即將實行的工程量清單計價模式各單位需要面對的風險,提出幾點抵禦風險措施。
  19. During the practical course of the control of fabrication cost for the western section of wuqi road, jianghan oilfield, the budget center of jianghan oilfield has popularized the fabrication cost mode by bill and probed into the entire process control of fabrication cost, has acquired rich experiences

    江漢油田概預算中心在江漢油田五七大道西段工程項目造控制中,推行工程量清單計價模式,探索全過程造管理,積累了較豐富的經驗。
  20. Based on the idea of satisfying the function with the lowest lifespan cost of value engineering, the article tends to choose the winner of the bidder with work frame of value engineering, namely, converts appraising of technical bid, commercial bid, especially bid appraising without given bid price and appraising of major unit price items of the commercial bid, which is different from practice in traditional bid appraising process, into flow chart of value engineering and converts the complicated multi - objectives decision making process into simple comparison of the mathematic figure

    基於值工程以最低的壽命周期總成本完成滿足用戶要求的功能的核心,探討了在評標過程中遵循值工程的理念,將清單計價模式下的技術評審,商務評審,特別是商務評審中有別于傳統計價模式的無底招標、主要單評審納入到值工程的工作流程中,將標書的評審轉換為對每個有效投標人的值系數的簡單數學比較,並以此作為選擇中標人的依據。
分享友人