試驗鉆進 的英文怎麼說
中文拼音 [shìyànzhēnjìn]
試驗鉆進
英文
drilling experiment-
The local directional drilling is just staring in terrane, the equipments and the technologies ca n ' t satisfy far and far the spot construction needs, according to current circumstance and considing the existed equipments, the author put forward drilling by air hammer in terrane, having designed compounded - drilling tools, and recommended technology parameters. producing experiments have obtained good achievements in economic and in techniques
國內定向鉆進鋪管技術在巖層只是剛剛起步,設備、工藝遠遠不能滿足現場施工需要,本文針對國內、外巖層定向鉆進非開挖設備及工藝現狀,結合國內大多施工單位的已有設備,提出巖層空氣潛孔錘導向鉆進工法,設計了適合巖層鉆進的實用鉆具,並提出具有針對性的工藝參數,生產性試驗取得了良好的經濟技術指標。On the basis of having refered larg number of abroad test - well data and having investigated same local test - well, this dissertation have designed the drill and petroleum extraction tools test - well whole scheme to fit the well drill and petroleum extraction busywork characteristic and the demand of technique store for the dagang oil - field
本文是在進行了大量的國外試驗井資料查閱及國內試驗井調研的基礎上,根據大港油田鉆采作業的特點和技術儲備的要求進行了鉆采工具試驗井總體方案的設計。224 drillholes, 250 trial pits, refurbishment of 48 existing standpipes piezometers, laboratory testing of soil and rock samples obtained from the investigation works and the structural condition survey on existing highway structures along tuen mun road
224個鉆孔, 250個探井,重整48個豎管測壓計,將所取得的土壤和巖石樣本進行實驗室試驗,以及對屯門公路上現有的公路建築物進行結構狀況勘測。By the check - out, inspection and measurement to start construction the industrial art to this test pile with the examination between stake body mass and bearing power, made sure the stroke reasonable operation method drilling under the dissolved cavern geology term ; the pier foundation loading test expressed the lading and rub the lading that resistance drag a glazing for of relation, and to the borehole cast - in - place concrete pile in the karst terrain deliver with break the mechanism, the characteristic of bearing power, proceeding the spot test job of the full of result ; the test data expresses the stake side friction resistance to rises with a bat batch terminal friction resistance very important function, the of tip of pile resistance drag occupies the proportion very few
通過對本次試樁施工工藝的檢測和樁身質量及承載力的檢驗,確定了沖擊鉆在溶洞地質條件下的合理使用方法;基樁承載實驗表明了荷載與摩擦阻力之間的關系,並對巖溶地區的嵌巖灌注樁的荷載傳遞和破壞機理、承載力特性,進行了富有成果的現場測試工作;試驗數據表明樁側摩阻和支盤端阻起很重要的作用,樁端阻力所佔比例甚少。這與設計樁基時的計算模式相差很大,承載力也較設計增加;使用力學數值分析方法和有限單元法,對鉆孔灌注樁樁端下的巖體強度和結構穩定性方面進行模擬計算和定量研究。Based on seismic wave method, borehole acoustic method and indoor rock mechanics test, the dynamic and static parameters of the foundation rock for the toe slab of the concrete face rockfill dam for shuibuya hydropower station are tested, and then the relationship among the rock quality, dynamic parameter and static parameter are established with the parameters obtained from the test, furthermore, the classification and the quality evaluation are made as well
摘要採用地震波法、鉆孔聲波法以及室內巖石力學試驗法,對水布埡水電站面板壩趾板建基巖體進行了動、靜參數測試,並根據所獲的參數建立了巖體質量、巖體動力學和靜力學參數三者之間的相關關系,對工程巖體進行了質量分級和質量評價。Taking bench shooting of the shuibuya yihongbao project as example, it makes use of the digital television system of drilling overall - hole wall to actually measure, the testing result of lateral fractural range is 4 - 5m, and that of bottom fractural range is about 3m
本文試驗工作是以水布埡溢洪道工程梯段爆破為實例,採用鉆孔全孔壁數字電視系統對混裝乳化炸藥爆破破裂范圍進行了實際測試,測試結果為:側向破裂范圍為4 5m ,底部破裂范圍值為3m 。After the high - g arrayed micro - accelerometer was designed and fabricated successfully, this paper analyzed the characteristic signal of accelerometer in order to supply the theory sustain for the application of sensor
本文在鉆地引信用高g陣列式微加速度計的成功研製基礎上,首先對加速度計試驗信號進行特徵分析,為傳感器應用提供理論依據。The bond effect of various bond material is also researched by use of the test of pored - drilled drawing bond between new and old concretes. this paper also makes a contrast with the effect of mortars " bond, which offers a meaningful reference on how to choose bond materials and to appraise the bond effect
並通過新老混凝土鉆芯拉拔粘結試驗,研究了不同界面粘結材料的新老混凝土粘結效果,並與其砂漿粘結試驗結果進行了對比,對實際工程應用中正確選用界面粘結材料及評價粘結效果具有一定的指導意義。The stabilities of the accumulations are analyzed by means of geological survey, drilling, exploratory adit, geophysical exploration and scientific research test etc. and then the relevant engineering treatments for various of the accumulations on the project are put forward as well
在勘察過程中我們採用了地質測繪、鉆探、硐探、物探、科研試驗等多種勘察方法與手段,在勘察成果基礎上對堆積體穩定性進行了分析,並結合對工程的不同影響提出了相應的工程處理措施。Based on the tribological principle and the theory of contact mechanics, it is feasible to adopt curvature - changing structure in the rock - bit journal bearing system. the structure and coupling relationship of curvature - changing journal bearing under the condition without friction have been analyzed and three kinds of sub - form structure configurations, namely, the pseudo - curvature - changing structure, the conformable curvature - changing structure, and the clearance curvature - changing structure, been differentiated according to the contacting features. the shape optimization and pre - running - in regulations of the contact surface of curvature - changing journal bearing under friction condition have been established. the results of rock bit journal bearing test indicate that the tribological behavior of the bearing can be effectively improved by curvature change based on both designing and pre - running - in
基於摩擦學原理和接觸力學理論,提出了可在牙輪鉆頭滑動軸承中採用變曲率結構.在不考慮摩擦的情況下,就結構設計和配合關系等問題進行了分析討論,劃分了準變曲率、吻合變曲率以及間隙變曲率等3種結構形式;針對考慮摩擦時的變曲率結構,提出了接觸形狀優化和預磨合的實施方案.鉆頭軸承試驗結果表明,無論是預設計變曲率還是預磨合變曲率,都能改善軸承摩擦副的摩擦學特性,因而值得進一步研究和推廣According to the researches on working principle of wear - resistant alloy, the ideas on selecting the new - typed wear - resistant alloy were put forward, which are " equilibrium wear design " and " stability " concept. three kinds of new wear - resistant alloy that can be used for hardbanding on tool joint were developed, and wear experiments have showed that its property is as good as or better than that of abroad
對耐磨減摩合金的工作原理進行了研究,提出了新型耐磨減摩合金的篩選要以「平衡磨損設計」概念和「穩定性」原則為依據,並設計出3種鉆桿接頭硬化帶用新型耐磨減摩合金,實驗室磨損試驗表明其性能可以達到或超過國外同類產品。Numerous laboratory investigations were carried out to enable operating strategy to be formulated, including rig experiments to examine the effect of formed coke on stack permeability with various burdens, model work to determine optimum charging sequences for coke and briquetts with the selected burden, pilot - coke - oven trials to determine the most suitable coal blend for the base period coke
為了使操作可以程式化,我們已經進行過許多實驗性研究,包括用鉆探試驗來檢測型焦在不同負荷下對疊加浸透性的影響,用模型製作來確定在特定負荷下焦炭和煤磚的最佳加料順序,和用先導煉焦爐試驗來確定基期焦炭所需的最適合的煤混合量。The main production equipment is as follows : lathe, grinding machine, puncher, cold mound machine, drilling machine, tapping machine, roll silk machine, rub silk machine, polishing machine, quench equipment, etc. 150 with the hands, measure advanced and perfect testing equipment, have fast better spare part development ability
主要生產設備有:車床、磨床、沖床、冷墩機、鉆床、攻絲機、滾絲機、搓絲機、拋光機、淬火設備等150臺套,檢測試驗設備先進完善,具有快速較強的零部件開發能力。Through the research on the reducer reliability and optimization design, the design quality of the drilling machine are improved greatly. it is proved that the type zk - 150 drilling machine capability is advanced and operation is reliable by examine and industrial test in coal mine. another advanced equipment provided to users has wide application foreground
通過可靠性優化設計,使鉆機的設計質量得到很大提高,所研製的zk - 150型鉆機經性能檢測和工業性試驗證明:技術性能先進,機械運轉可靠,為煤礦提供了又一先進設備,具有廣闊的市場前景。In this section the author analyses the rules of the pile ultimate tip resistance and the shaft friction resistance distribution and their exertion of cast - in - place socketed piles instrumented with strainometers in soft muddy rock. the second aspect of the paper is the analysis on the current rock pile vertical bearing capacity in the four standards gb50007 - 2002, tb 10002. 5 - 99, jtj024 - 85 and jgj94 - 94, then the design method with correlated formula of socketed piles in xigeda - mudstone is given. at the end of this paper, based on the research of pressure grouting technique in recent years, and combined with in - site test result, this paper puts forward the design and calculation method to grouted pile in xigeda - mudstone and the principle of choosing grouting parameters, which provid es experiences for applying this technique and further studying
本論文結合省級科研項目「西攀高速公路昔格達組泥巖層中鉆孔樁提高承載力的研究」 ,所做的研究工作主要在以下三個方面:一是根據8根樁身內埋設量測元件試樁的單樁豎向靜載荷試驗資料,分析了各試驗樁特別是常規沖孔灌注嵌巖樁在昔格達泥巖中的軸向力、側摩阻和樁端阻力的分佈和發揮規律;二是在討論現行規范對嵌巖樁承載力的計算公式的基礎上,探討了在昔格達泥巖層中的沖孔灌注嵌巖樁的側摩阻和端阻的計算方法,並推薦了相應的計算公式;最後,在吸取近年來對灌注樁后注漿技術研究成果的基礎上,結合現場試驗研究結果,分析了該項技術在昔格達巖層中的應用效果,提出了相應的參數選取,從而為壓力灌漿技術的工程應用和進一步研究提供經驗,並為今後在該地層中合理選用樁型以及指導施工提供了依據。We employ over 3, 000 employees, including more than 300 skillful workers derived from different departments such as engineering department, design department, production department, mold making department, plastic injection department, metal department, electro plating department, quality control department, etc and have prefect and high technology production lines including mold making capacity, plastic injection and metal press facilities and sophisticated electro - plating technologies to produce more than 4. 5 million pieces of switches & jacks daily
雇有3000多名熟練員工,其中工程技術人員有300多名,下設工程部、設計部、生產計劃部、工模部、注塑部、五金部、電鍍部、品質部、試驗室等部門,擁有配套齊全、技術先進之生產試備?包括?精密線切割機、放電加工機、細穴放電鉆孔加工機、精密平面磨床、立式銑床、鉆床、立式、臥式注塑機、自動車床及自動電鍍生產線等,每天為客戶生產超過450萬個開關及插座。The company has the advanced precision casting, the machine - finishing equipment and the check - out facility, including : disk wax mould machine, moistening slurry machine, intermediate frequency melting furnaces, cnc tooling machine, spectrometer, metallurgical microscope, hardness testing machine, computer material test machine. and so on
公司擁有先進的精密鑄造、機械加工設備及檢測設備,其中包括:雙工位射蠟機、圓盤射蠟機、沾漿機、中頻熔化電爐,光譜分析儀、金相顯微鏡、硬度試驗機、電腦萬能材料試驗機, cnc數控車床、普通鉆銑床及閥門管件殼體、密封試驗機等。A large amount of data were acquired from the measurement in situ surfacial soil strength on the tidal flat by using portable cone penetration, shallow drilling, laboratory analysis of delta, and other means
利用輕型靜力觸探對灘面表層土體強度進行密集型的測試,同時結合淺層鉆探,室內試驗等手段,獲得了大量數據,進行了資料整理、分析。Based on a thorough investigation of the engineering geological condition for the reservoir region of the huizhou pumped storage power station, the in - situ trial pit water injection test, boring water injection test, and water pressure test were performed to study the permeability of rock and soil mass
摘要在對惠州抽水蓄能電站庫區工程地質條件進行詳細調查的基礎上,採用現場試坑注水和鉆孔注水、壓水試驗等方法了解巖土體的透水性。By means of the software of pro / e we studied the movement of the bit and obtained some data reports about different parameter bit. in the environment of visual basic the trace program can compute the well - bottom outline. it also can draw the trace and the velocity curve that the teeth scrape the well bottom
分析方法是在pro / e中對試驗鉆頭進行運動模擬,得到不同結構參數和傳動比的鉆頭運動的數據文件,然後進入用visualbasic高級語言編制的異形牙輪單牙輪鉆頭分析軟體中,計算出鉆頭的井底輪廓曲線,並繪制鉆頭井底軌跡和牙齒刮切井底的速度曲線。分享友人