負荷電容 的英文怎麼說

中文拼音 [diànróng]
負荷電容 英文
load capacity
  • : Ⅰ名詞1 (負擔) burden; load 2 (虧損) loss 3 (失敗) defeat Ⅱ動詞1 [書面語] (背) carry on th...
  • : 荷名詞(蓮) lotus
  • : Ⅰ名詞1 (有電荷存在和電荷變化的現象) electricity 2 (電報) telegram; cable Ⅱ動詞1 (觸電) give...
  • 負荷 : [電學] load; charge; weight
  • 電容 : electric capacity; capacitance; capacity
  1. Accurate load forecasting is helpful to planning generators " starting and stopping in the interior of the electrical networks economically and reasonably, preserving the security and stability of power system, reducing the unnecessary circumvolving repertory capacity, making planning to overhaul the units in reason, ensuring the normal production and life of the society, effectively reducing the cost of generating electricity, increasing the economical and social benefit

    預測是供部門的重要工作之一,準確的預測,可以經濟合理地安排網內部發機的啟停,保持網運行的安全穩定性,減少不必要的旋轉儲備量,合理安排機組檢修計劃,保證社會的正常生產和生活,有效地降低發成本,提高經濟效益和社會效益。
  2. Though there are a certain level of counteractive impacts to the market power from the price - differentiation agreement and dynamics of demand, the influence of market power cannot be eliminated ; 3 ) in the electricity market, the market power size is greatly influenced by the supply - demand relationship, extent of concentration, and market collusion

    雖然差價合約和需求彈性對市場力有一定的抑制作用,但並不能消除市場力的存在。 ( 3 )力市場的供需關系、市場的集中度以及市場共謀的有效性極大地影響著市場力的大小;發企業的成本和發量的限制在某種程度上也影響著市場力的實施效果。
  3. The main hardware is the collection equipment, the software is the windows dna framework, distribute calculate resolves the problem of data server down because of heave calculate mission. system provides the mis sub - system base on ie, which make data - query and report forms not limited by the special network. the new module, standard interlink module is aimed at the problem of not pluralize between different system, can make system utility in administrative levels

    系統有硬體和軟體組成,硬體的基礎是採集裝置;軟體採用windowsdna構架,使用分散式計算,解決了原來系統的計算任務過于繁重造成數據服務器不能承擔的問題;服務方面提供基於ie的mis系統,使數據查詢和報表服務擺脫了原來的專用網路的限制;新增加模塊「標準互連」模塊是針對目前各種自動化系統不兼的問題而產生的,可以實現力自動化在更高層次上的實現,在這個模塊中,有意識的採用
  4. And a solve scheme is presented, controlling the voltage of 220kv power network in chongqing under 232kv during low load period. with the increase of load and power supply, the reasonable positions and capacitance of reactive power compensation become reasonless

    隨著的不斷增加,源亦隨之大幅度增加,使得原網路中本來合理的補償位置、補償量變得不合理,因此有必要重新選擇補償點。
  5. High voltage shunt capacitor installation is comp - rised of capacitor cabinets or steel racks capacitor, special fuses for capacitor overload protection, capaci - tor discharge device, air - cored reactor which is applied to restrain surge current and high frequency harmonic, zno arrester without gaps for overvoltage - limiting and high voltage vacuum switch etc. capacitor cabinet is

    高壓並聯器成套裝置主要由器櫃或鋼架器過保護專用熔斷器放裝置專用放線圈或壓互感器,抑制涌流限制高次諧波的空芯抗器和限制過壓的無間隙氧化鋅避雷器及高壓真空開關
  6. G w epox junctions accommodate up to 6 point configurations with any combination of 200a or 600a interfaces for either loadbreak or deadbreak elbows

    G w epox纜分接母排能納多至6路接線的200a或600a帶或不帶的插拔式接頭。
  7. With the development of the electric power system, static - state reactive power compensators ca n ' t have met the requirements of the actual production and operation, and the trend to the fast and dynamic compensation for reactive power become greater and greater. since ertan hydroplant and 500kv transmission systems in sichuan power system have been operated, many power plants of load center are forced to halt during the high - water period, because the great deal of power is transmitted to far - distance load center. thus the load center loses voltage sustentation and the level of the system stabilization is debased greatly

    四川網的二灘水站和500kv輸變系統投入運行后,由於二灘水站的大量力遠距離輸送至中心,迫使中心的火機組在豐水期大量停機,使中心失去壓支撐,大大降低了網的壓穩定水平;同時,因為四川網中的無功補償裝置全為靜態無功補償器(或抗器) ,這些設備只能在系統正常運行狀態下起到無功補償和壓支撐的作用,而在網出現事故時,不但不能起到壓支撐作用,反而會促使壓崩潰事故的發生。
  8. Dinghu are mainly relied on the power supply of the power grid of guangdong province, there are four 110, 000 v transmit and transformer substations, one thermal power plant with a total installed capacity of 3000 kw in the first duration, and a total capacity of power supply of 75000000 kw and a daily load of 15000 kwh in the district, the power grids are perfect and cover the whole district

    鼎湖區主要依靠廣東省大網供,全區擁有4個11萬伏輸變站和一家首期量3000千瓦的火力發廠,總供能力超過7500萬千瓦,日達1 . 5萬千瓦時。區內代網路齊全,供民線路覆蓋城鄉。
  9. This paper, based on the electric policies of some city, compares in aspects of the capacities and electric powers of main equipment, initial investment, annual operating power costs and the economic analysis of ice storage air condition with normal air condition in different quantity of the storage - ice

    本文鑒于某市的價政策,通過計算某工程的設計日及全年空調,得出各自所需的設備量及功率大小,分析比較了初投資及年運行費等,並按不同的設計日對此工程進行了不同蓄冰量時的經濟分析比較。
  10. The axial flow type turbines are available for hydrauric power resources of medium and low heads. ganfa manufactures both the propeller type fixed blade type and the kaplan type adjustable blade type turbines. the propeller type turbines are suitable for hydropower stations with small or medium capacities and heads, and relatively stable loads. the kaplan turbines are suitable for hydropower stations with medium or large capacities and heads, and relatively unstable loads

    軸流式水輪機適應于開發中低水頭水力資源。我公司生產的軸流式水輪機按轉輪結構分為定槳zd轉槳zz兩種,定槳式一般適用於中小量及水頭變化較小的的水站轉槳式多用於大中型站及水頭變化較大的水站。
  11. On the base of widely investigating and researching, author deems that the conventional reactive power compensation devices used by consumer had many defects with among others : lower response time, remaining residual voltage on the compensation capacitors, and so on. because of existing improper trigging time, it is impossible to realizing balance compensation for 3 - phrase unbalance loads

    本文在充分調研的基礎上,認為目前採用的傳統的無功功率補償裝置存在響應速度慢、觸發時刻不合適、補償器上有殘壓、不能實行三相平衡補償、對網產生污染、不能消除本身產生的高次諧波等弊病。
  12. The result of load forecasting has become on important basis for operating management, economic dispatch, increasing system ' s capacity, and pursuing power market

    預報結果已成為運行管理、經濟調度、系統增、推行力市場的重要依據。
  13. The overhaul of power units are arranged in terms of peaking capacity balance and the power loads are dispatched based on the principle of equal incremental coal consumption rate in the new method, which is anticipated to solve the economic operation of the power system

    實際上,抽水蓄能站的量效益與網的水平、曲線形狀和常規水的比重有關,而節煤效益除與水平、曲線形狀有關外,還與網的源結構、火機組的動力特性有關。
  14. Now the affect and the measure of hypo _ harmonics is in the research. the influence of negative sequence is almost eliminated along with the enlargement of the system ' s capacity and the alternate connection of traction substations. the fixed parallel compensate equipment applied in traction substations consist of a constant capacitor and a constant inductance, so its output is constant

    流的問題已經因系統量的增大、牽引變所採用輪換接線方式而基本解決,力部門實行的「反轉正計」 ,使採用對無功功率固定補償方式由於牽引變化頻繁而出現補償量不足或過補償現象,難以達到滿意效果。
  15. The artificial neural net ( ann ) way is universal regard as one of the most effective ways of stlf. in this paper, some research is developed for stlf using ann ways in several parts : the first part is about the arithmetic of ann based on bp model, namely the advanced of traditional bp arithmetic, one alterable step and scale bp arithmetic based on comparability of model and probability of accepting bp arithmetic is used to enhances a lot the convergence rate of learning process of bp network, but also avoid the stagnation problem to some extent. it indicates that the ann ' s efficiency and precision by the way can be ameliorated by the simulation of real data

    神經網路方法在短期預測中已經被公認為較有效的方法,本文針對神經網路用於力系統短期預測的幾個方面展開研究工作:第一部分研究一般用於預測的神經網路bp模型的演算法,即對傳統的bp演算法的改進,將一種基於模式逼近度和接受概率的變步長快速bp演算法應用到短期預測,模擬結果表明該方法有效的改善了bp演算法收斂速度慢以及易陷入局部最小點的缺點,從而提高了神經網路用於預測的效率和精度。
  16. ( 3 ) despite of many studies on oxidationjlithiation of porous nickel, a very important factor abstract has not been pay much 8ttedion to, that is, most of the matcria [ s in mcfc actually work under a ioad generated by the self weight of mcfc stack, which undoubtedly has a great effect on the materials performance in mcfc

    ( 3 )盡管近些年來,對于金屬ni在熔鹽中的氧化鋰化行為已進行了相當深入的研究,但是有一個很重要的因素卻未被關注。即, mcfc池堆中的極材料在實際啟動和運行過程中總是處于由池堆自身產生的狀態,的存在無疑對極材料的性能產生不忽視的影響。
  17. Electromagnetic compatibility - limits - assessment of emission limits for distorting loads in mv and hv power systems

    磁兼限值中高壓力系統中畸變發射限值的評估
  18. Electromagnetic compatibility - limits - assessment of emission limits for fluctuating loads in mv and hv power systems

    磁兼限值中高壓力系統中波動發射限值的評估
  19. Application of high - voltage explosion fuses is very abroad. in addition to protecting the electrical equipment by melting itself, disjunction or close of its tube can also be manipulated by a high - voltage insulative stick under some circumstance, for example, to switch on or off no - load overhead transmission line, no - load transformer and little burden current

    跌落式高壓熔斷器的應用極為廣泛,不僅能保護氣裝置,在一定條件下還能直接用高壓絕緣鉤棒來操作熔管的分合,以斷開和接通空載的架空線路、小量空載變壓器和小流。
  20. High voltage shunt capacitor installation is comprised of capacitor cabinets or steel racks capacitor, spe - cial fuses for capacitor overload protection, capacitor discharge device, air - cored reactor which is applied to restrain surge current and high freq. harmonic, zno arrester without gaps for overvolage - limiting and high voltage vacuum switch etc. capacitor cabinet is made of highquality cold - rolling steel plate

    高壓並聯器成套裝置主要由器櫃或鋼架器過保護專用熔斷器放裝置抑制涌流限制高次諧波的空芯抗器和限制過壓的無間隙氧化鋅避雷器及高壓真空開關等設備組成。
分享友人