超前支護 的英文怎麼說

中文拼音 [chāoqiánzhī]
超前支護 英文
advance support
  • : Ⅰ動詞1 (越過; 高出) exceed; surpass; overtake 2 (在某個范圍以外; 不受限制) transcend; go beyo...
  • : Ⅰ名詞1 (在正面的) front 2 (次序在先的) first; top 3 (過去的; 較早的) ago; before; preceding...
  • : Ⅰ名詞1 (分支; 支派) branch; offshoot 2 (地支) the twelve earthly branches3 (姓氏) a surname...
  • : 動詞1. (保護; 保衛) protect; guard; shield 2. (袒護;包庇) be partial to; shield from censure
  • 超前 : speed-up; outstrip; lead; leading; preact; prediction; [航海學] advance; advancing
  1. We need more efforts from civilian and government to establish the ems ( emergency medical service ) in our country after ji - ji ( taiwan ) earthquake ; it is longtime of apathy for us for training disaster medical doctors, but the person of disaster medical doctor is important for response coordinators and planners in the interorganization resource management. this article suggests each organization to follow the exist plan and to set the geographic information system ( gis )

    摘要921集集大地震突顯出民間與政府在緊急醫療救所付出的努力還需加強,對于災難醫師的培育更要靠長期的訓練;在災難發生時不同專業團隊的集成,在事故災情嚴重,出該地區緊急醫療救處理能力時,協調、聯絡鄰近地區之救持更為重要;本文認為集成當已存之法令與規章並予以落實,在指揮中心以防救災緊急醫療通報圖臺顯示及查詢應用系統作任務之分派可提升救能力。
  2. Gob - side entry retaining with roadside packing in bolt supporting entry

    分層開采後退式掘進巷旁沿空留巷技術
  3. The tunneling method for the landslide section at the entrance of heishuigou tunnel ( for the internal circle construction road in the construction site of guandi hydropower station ) is presented herein ; in which the tunneling method and the effects of both the pilot and the system supportings on the entrance tunneling into the landslide body are described as well

    摘要介紹了官地水電站場內環線道路黑水河溝隧道進口滑坡體的施工方法,包括開挖的施工方法以及與系統對在滑坡體上進洞所發揮的作用。
  4. Concerning the construction of the shallow cover and the special shallow cover in the tunnel under the special geology conditions, the principle of " to stabilize the slopes with protecting arch ; to strengthen the earth with the pipe - shield support grouting ; to dig a hole shallowly ; to blast slightly ; to use strong supporting structure. " has been adopted to enter the tunnel safely ; in terms of the broken belt, the effective actions such as the pipe - shield support grouting, strengthening the surrounding rock in advance with advanced bolt and steel grids, and so on, are taken to pass the poor conditioned part smoothly

    對于特殊地質中的淺理、特淺埋進洞的施工,堅持「拱穩定邊仰坡,大管棚注漿加固土體,淺打眼、弱爆破、強」的原則,做到安全進洞;對于斷層破碎帶,則採取了管棚注漿,錨桿預先加固圍巖並結合鋼格柵撐等有力措施,順利通過了不良地段。
  5. Combined with the examples of leigongshan tunnel project which is from pingshan of shenzhen to xichong, tunnel advance support pre - reinforcing technology and initial support construction technology are deeply discussed in this article

    本文結合深圳坪山至西沖一級公路中的雷公山隧道工程實踐情況,對隧道超前支護預加固技術和初期施工技術進行了深入的探討。
  6. The pre - support technology and its practice along goof roadway in comprehensie caving working face

    綜放工作面沿空巷道超前支護技術與實踐
  7. At last, the reasonable shape and rule and scope of main structure parameters about two station structures are given, and the mechanical characters and construction safety are analyzed. in addition, the construction meas ures and reinforcement ways of pre - supporting and so on are proposed

    最後,得出了四種車站主體結構體的合理形狀及主要結構參數的取值規律與范圍,對主體結構的受力特徵作了分析和施工的安全性作出了評價,並提出了相應的結構構造措施和施工過程中的圍巖超前支護方法等。
  8. This paper analyzes job state of soil nail support system in the earth fill body in physically displacement characteristics of soil, strength characteristic distribute law of soil nail, strength characteristic distribute law of out layer of concert and so on, and reveals the function mechanism of soil nailing in earth flll body

    從土體位移特性、土釘受力特徵、面層應力分佈規律、超前支護土釘的受力特性等方面分析了降雨與非降雨條件下填土中土釘體的工作狀態,揭示了填土中土釘的作用機理。
  9. To alleviate the workload of frontline nursing staff in certain areas, the ha has retained over 200 undergraduate nursing students on temporary employment. the ha will also deploy more support staff to assist in simple patient care duties that do not require professional nursing knowledge

    為減輕在某些范疇工作的理人員的工作量,醫管局已聘請了過二百名士學生為臨時員工,並會調派更多援人員協助執行一些簡單又不涉及專業理知識的病人理工作。
  10. Construction of flat tunnel of large span at extra - shallow depth must be conducted on the principle that advance grouting should be strictly performed before excavation and length of pull at one time should be short, together with reinforced support, immediate closing and constant monitoring and surveying. that preceding pilot tunnels, large - volume excavation divided into small ones, excavation of flank before that of center, upper before lower, arch before wall etc is a good method which could effectively reduce surface subsidence and its adverse effect on adjacent buildings, in addition, some other measures are also taken to lessen blast - induced vibration in the ground and surrounding structures. in a word, all means and steps mentioned above have already proved effective and practicable in practice

    軟弱大跨淺埋扁平隧道必須按「管,嚴注漿,多分部、短開挖、強、快封閉,勤量測」的施工原則進行施工,採用「眼鏡,化大為小,先側后中,先上後下,先拱后墻」的施工方法控制地表沉降和對周邊建築物的影響;採用「多分部,化大為小,短進尺,密布眼,弱裝藥,設減振槽」 ,控制爆破振動,經過實踐證明,這些方法都是行之有效的。
  11. A conventional craniotomy in china now costs at most rmb several thousands. however, a conventional craniotomy has to entail other fees, such as, medicine fees, check fees, hospitalization fees, nursing fees, nutrition fees and a considerable sum of fees due to loss of work for a long time after operation

    實施開顱手術,目國內費用不過幾千元,但開顱手術同時還必須付許多其它的費用,如藥費檢查費住院費理費康復期間的營養費等,此外還有較長時間誤工的費用,綜合起來,就是一筆不小的出。
  12. During the stability analysis, the safety coefficient and the most dangerous slipped layer of soil slope retained by compound soil nailing was studied. the stability of soil nailing was calculated. then, the influence functions of water, prestressed anchor and cement - soil retaining wall and front small - piles in the compound soil nailing system were studied

    在穩定性分析中,研究了復合土釘時土坡穩定的安全系數:介紹了最危險滑裂面的確定方法並採用幾何參數控製法來確定土體的最危險滑裂面;計算了土釘土體時的穩定性;研究了水、預應力錨桿(索) 、水泥土攪拌樁以及微樁對復合土釘時土體穩定性的影響作用並給出了相應的計算公式。
  13. In this paper, three new technology - the closed cutting off water technology, rotary spray pile with inserting a steel tube as early supporting and framing supporting structure with bi - rows of mini - steel tube piles, were introduced and analyzed, which have been first used in the practice of deep foundation pit engineering in japan, these cases can serve as referenc to similar engineering

    摘要基於工程實踐,文章介紹了首次在濟南市深基坑工程中應用的全封閉止水技術、旋噴樁插管技術和剛架式雙排微型樁結構,供相似工程設計施工參考。
  14. The researches on the stability of compound soil nailing show that it is important to determine the safety coefficient and the most dangerous slipped layer of soil slope retained by compound soil nailing in the stability analysis of compound soil nailing. water, prestressed anchor and cement - soil retaining wall and front small - piles in the compound soil nailing system have a great influence on the stability of the whole compound soil nailing system. the front small - piles in the compound soil nailing system can improve the stability of the soil slope

    復合土釘穩定性分析表明,復合土釘時土坡穩定的安全系數和最危險滑裂面的確定對于穩定性分析非常重要;土體內水對土體穩定性有很大的影響作用;設置微樁后,能增加基坑邊壁的穩定性;增設深層攪拌樁后,邊壁抗傾覆、抗滑移安全系數增大,同時面層強度的增加更有利於復合土釘體系內其它組件間的相互作用;增設預應力錨桿(錨索)和預應力土釘,對于控制基坑邊壁位移有重要作用,可明顯提高滑移面上土體的抗滑力。
  15. On the basis of model test, a better construction method under pre - prop for the surrounding rock i, ii, iii, named whole section excavation with heading in moderate degree and that with center heading and center partition first, then with two sides heading, is put forward

    在模型試驗的基礎上,提出了、 、類圍巖隧道在預下的優化施工方法,即下導洞適度全斷面開挖與先行中導洞及中隔墻、其次兩側下導洞適度全斷面開挖。
  16. And fund of medical treatment insurance pays fancy nurse cost regulation is : ginseng because the before 7 day, systems after insane hospitalization fail, keep staff rescue period is entered, fancy nurse cost presses 25 yuan / day brings into fund of medical treatment insurance to pay limits, during exceeding number of afore - mentioned formulary bed day and ginseng to protect personnel to strengthen ward because of sufferring from other disease to be entered, all nurse by one class expend 7 yuan / day brings into fund of medical treatment insurance to pay limits

    而醫療保險基金付特級理費規定是:參保人員因患精神病住院治療后7日、系統衰竭搶救期入住加強病房后14日,特級理費按25元/日納入醫療保險基金付范圍,過上述規定床日數及參保人員因患其他疾病入住加強病房期間,均按一級理費7元/日納入醫療保險基金付范圍。
分享友人