跨接裝置 的英文怎麼說

中文拼音 [kuàjiēzhuāngzhì]
跨接裝置 英文
crossover assembly
  • : 動詞1 (抬起一隻腳向前或向左右邁) step; stride 2 (兩腿分在物體的兩邊坐著或立著) bestride; stra...
  • : Ⅰ動詞1 (靠近;接觸) come into contact with; come close to 2 (連接; 使連接) connect; join; put ...
  • : Ⅰ名詞1 (服裝) dress; outfit; attire; clothing 2 (演員的化裝品) stage makeup and costume Ⅱ動詞...
  • : 動詞1. (擱; 放) place; put; lay 2. (設立; 布置) set up; establish; arrange; fix up 3. (購置) buy; purchase
  • 裝置 : 1 (機器設備的配件)installation; device; apparatus; equipment; arrangement; gear; appliance; rig...
  1. The experiment procedure and analysis result about exteriorly extended end - plate connection with high strength bolt are introduced primarily ; each sample ' s dimension is given. the adding load equipment, measuring apparatus placed, measuring point established is detailed. adding load measure load and m - curve is produced ; the single span gabled frames horizontal displacement formula is deduced when the horizontal concentrated force is applied to it

    重點介紹了外伸端板高強螺栓連的實驗過程及實驗分析結果,介紹了各組試件的形狀尺寸、加載、測量儀器安放、測點的布等;給出加載方式及測出的m -曲線;計算出試驗節點的初始剛度;推導水平集中力作用下單門式剛架考慮節點半剛性的側移計算公式。
  2. Specification for light domestic duty jumper lead sets for automotive starting

    汽車啟動用輕型家用線引線規范
  3. An additional check can be made by removing the enclosure cover and momentarily placing a jumper ( or 20, 000 ohm resistor ) across terminals 9 - 10 on the control

    通過拆卸外殼蓋板,並立即將線(或20 , 000歐姆電阻)並聯在控制線端子9 - 10上,能夠再次進行測試。
  4. The paper describes the main techniques in the integral sliding construction for large span structure, which includes jacking scheme, plan layout, assembly, transport and stacking of components, setting of sliding system, setting of track, conformation of falsework, traction facility etc. discusses emphatically the sliding falsework, which includes the material, conformation, manufacture, welding and assembling of the shape steel tape falsework

    系統分析了大度鋼桁架胎架整體滑移施工中的起重吊機具的選擇與布、施工平面布、桁架結構拼單元及滑移單元劃分、滑移施工方案及工藝流程、桁架的連、拼運輸、及堆放、滑移軌道布、滑移滾輪構造、延伸平臺布以及滑移牽引系統等諸多工藝問題。
分享友人