軸裂隙 的英文怎麼說

中文拼音 [zhóuliè]
軸裂隙 英文
axial fracture
  • : 軸Ⅰ名詞1. (圓柱形的零件) axle; shaft 2. (對稱部分的直線) axis 3. (圓柱形的纏繞器物) roller; spool Ⅱ量詞(用於纏在軸上的線以及裝裱帶軸子的字畫)
  • : 裂動詞[方言] (東西的兩部分向兩旁分開) open
  • : 名詞1 (縫隙; 裂縫) crack; chink; crevice 2 (空閑) gap; interval 3 (漏洞; 機會) loophole; op...
  • 裂隙 : crack; crevice; fracture; cleftiness; fissure; slifter; crevasse裂隙冰川 crevassed glacier; 裂隙...
  1. The pegmatite nb - ta mineral veins were controlled by a group of horizontal tenso - shear axial - direction fault - fissure systems in the nne direction folding structures

    鈮鉭偉晶巖礦脈受控于nne向褶皺構造的一組近水平張扭性系。
  2. The early coaxial progressive depressing makes the forming of tectonic lens in the competent rich - sodic and incompetent rich - mud rocks ; the later nocoaxial progressive shearing makes the tectonic compression fracture into extension fracture in the early tectonic lens, at the same time, the great drop of pressure leads to the hydrofractureing of deep fluid along the fracture in the rich - sodic rocks, and then produces the hydrofracturing breccia

    早期共遞進擠壓使能幹性的富鈉質巖系與非能幹性的富泥質巖系發生構造透鏡石香腸化;晚期的非共遞進剪切使早期在透鏡體中心形成的構造由剪性轉化?張性,並?生巨大的壓力降使深部的流體在富鈉質巖系中沿發生水力壓作用,從而形成雙王水力壓含角礫巖。
  3. Erosion damage decreases rock load area, after defining damage variable, the damage stress in rock can be calculated by the method bring forward by lemaitre conveniently. for surrounding rock of a deep buried tunnel under the condition of drained, its seepage character is not only controlled by the high stress in rock, but also influenced by the development of erosion damage. in the whole course of rock " s deformation and failure, its seepage character decreases with the increment of stress in elastic stage, while " increases with the development of failure

    巖樣中全應力?應變三滲透試驗過程中的典型表現為隨著應力的增加,巖體內的空紋受載閉合,滲透性降低,應力達到一定閾西南交通大學鷹士研究生學位論文第11頁值后,巖體內部紋發生擴展和歸並,滲透性增強;同樣,地下水的動、靜壓力作用對紋的擴展和歸並也起著促進作用。
  4. In view of the problems in the design of the large andmedium - sized indoor substations built by guangzhou power bureau in recent years, points for attention in the design of indoor substations are expounded in terms of ventilation, cable channel, reservation of hangers and space for transportation and installation, ground wire, lighting for the whole substation, etc

    僅僅推力頭、孔存在間時,推力頭其它零件製造質量與安裝質量達到設計要求,是不會影響精確徑向定位的.爾王莊泵站9機組出現的環鍵與平鍵斷情況,可能不是由、孔間過大引起,而是其它尚未查明的原因
  5. Based on real time ct testing, primary testing study of fatigue failure and deformation mechanism of red sandstone has been completed under uniaxial compression condition

    摘要基於對巖石的細觀ct試驗,對含有單一紋的貴溪紅砂巖在單疲勞荷載作用下的損傷擴展機理和演化過程進行了初步的試驗研究。
  6. Cycled shear tests for different part expansive soils and triaxial shear tests for different fissures growth extent expansive soils are carried out. the strength variation of expansive soils along with the variation of fissures degree and saturation degree is summed up, and fitting formulas are summarized

    還進行了不同部位的膨脹土反復剪試驗和不同發育程度的膨脹土三剪切試驗,研究了膨脹土強度隨度及土體飽和度變化而變化的規律,並提出了相應的擬合經驗關系式。
  7. Slit height : adjust light axis hole

    高度:以光孔調節
分享友人