輸送計劃 的英文怎麼說

中文拼音 [shūsònghuà]
輸送計劃 英文
displacement plan
  • : Ⅰ動詞1 (運輸; 運送) transport; convey 2 [書面語] (捐獻) contribute money; donate 3 (失敗) l...
  • : 動詞1 (運送; 傳送) deliver; carry 2 (贈送) give as a present; give 3 (伴送; 送別) see sb of...
  • : Ⅰ動詞1 (計算) count; compute; calculate; number 2 (設想; 打算) plan; plot Ⅱ名詞1 (測量或計算...
  • : 劃動詞1 (撥水前進) paddle; row 2 (合算) be to one s profit; pay 3 (用尖銳的東西在別的東西上...
  • 輸送 : deliver; supply; carry; transport; convey; feed; transmit; transfer; transportation; delivery
  • 計劃 : 1 (工作、行動以前預先擬定的內容和步驟) plan; project; programme; device; devisal; design 2 (做...
  1. Vsp is both a pivotal tache in logistic distribution optimization and indispensable in electronic commerce. it can increase logistic economic benefit and realize logistic rationalization. the systemic study on the theory and method of vsp is the base on the growth of logistic intensivism, the establishment of modem chain of command, the development of its and ec. now, the problem is not only applied to the field of auto transportation, but also to ship avigation communication electricity industry management computer application etc. the algorithm has been applied into many combinatorial optimization problems such as the trainman ' s shift arrangement in avigation the optimization design of cargo arrangement in ship company

    對貨運車輛進行調度優化,可以提高物流經濟效益、實現物流科學化。對貨運車輛調度優化理論與方法進行系統研究是物流集約化發展、建立現代調度指揮系統、發展智能交通運系統和開展電子商務的基礎。目前,問題的形式已有很大發展,該問題以不僅僅局限於汽車運領域,在水運、航空、通訊、電力、工業管理、算機應用等領域也有一定的應用,其演算法已用於航空乘務員輪班安排、輪船公司運貨物經過港口與貨物安排的優化設、交通車線路安排、生產系統中的與控制等多種組合優化問題。
  2. Freight ton ? kilometers ( passenger ? kilometers ) : refer to the sum of the products of the volume of transported cargo ( passengers ) multiplying by the transport distance, usually using ton ? kilometre and passenger ? kilometre as units for measurement

    貨物(旅客)周轉量:指在一定時期內,由各種運工具運的貨物(旅客)數量與其相應運距離的乘積之總和,是反映運業生產總成果的重要指標,也是編制和檢查運生產算運效率、勞動生產率以及核算運單位成本的主要基礎資料。
  3. I have taken impotance to analyze the rallying point of famous product, concrete cost and capability of providing and guarantee in this artical, meanwhile, i have caculated the quantity of concrete needed for the year and got the regression equation with the historic data for drilling footage of eight years and the consuming quantity of oilwell cement by the method of linear regression, and it has very significance for the making of stock contract and the plan of concrete production, i have analyzed the physical distribution of oilwell cement by the transpotation flex and the advantage or disadvantage between direct distribution and distribution to store in this artical, and i have tried to find the balance point of the two distribution ways by the ecnomic analysis and pointd out the conception of economic semidiameter, and come to the conclusion of direct distribution, distribution to store, and subarea of distribution to store at last

    本文對油井水泥供應商在品牌號召力、水泥成本、供應保障能力等方面進行了詳盡分析,並對供應商進行了能力排序;用線性回歸方法從八年鉆井進尺與油井水泥消耗量的歷史數據推算了當年度油井水泥需求量,得出了回歸方程,這對于油井水泥采購合同的制訂、水泥供應商生產的制訂具有相當重要的意義;從運彈性分析出發對油井水泥物流配進行了研究,對直達配、入庫配的優缺點進行了詳細的分析,在經濟分析的基礎上力求找到兩種配方式的均衡點,並提出了經濟半徑的概念,得出了直達配、入庫配、入庫分區距離等幾項結論。
  4. The major asset of aumund group is expertise in the planning, design and manufacture of conveying equipment, stockyards and blending beds same as equipment for dry bulk terminals

    奧蒙德集團的主要優勢是專業的,設和製造、堆場和混料場、干船艙碼頭設備。
  5. Mr nazarbayev has agreed with azerbaijan on an american - backed plan to bring energy across the caspian sea

    納扎爾巴耶夫已經同亞塞拜然就一項美國支持的跨裏海能源達成一致。
  6. The research mainly include three parts below : first, generalized three problems exist in the current delivery logistics management of commercial enterprises. they are : 1 ) loading the cargo at will leads the serious trucks " space waste 2 ) lack effective and precise delivery plan and its routings - 聯邦 choosing method. 3 ) difficulties in delivery trucks " management

    在結合本專業知識和作者多年物流企業工作經驗的基礎上,概括出目前我國商業企業發展中存在的問題是: 1 )貨物裝載隨意,空間浪費嚴重; 2 )缺乏準確有效的配和運路線; 3 )配車輛管理監控困難。
  7. Among the provinces in china, sichuan has the most abundant hydraulic source. it was brought into the national plan to translate her power to the east

    在我國諸省中,四川水力資源最為豐富,四川電力向東已納入國家
  8. The architecture consists of systemic technology, special technology and supporting technology. then, some key technologies are researched, i. e., long - distant transportation & inventory cost control model, jit delivery decision - making support model, system developing architecture based on j2ee and data integration based on middleware. based on current status and demand of logistics management of a chongqing automotive parts assembly manufactory, a logistics management decision - making support system is developed, and applied in the manufactory actual logistics management, which turns out satisfactory results by effectively optimizing logistics process, enhancing logistics efficiency and decreasing logistics cost

    在上述體系結構研究的基礎之上,建立了裝配型企業網路化協同物流管理決策支持系統實現的技術框架,該框架包括總體技術、專題技術、支撐技術等三個部分;對裝配型企業網路化協同物流管理決策支持系統中的部分關鍵技術進行了研究,包括裝配型企業遠距離運決策模型、客戶混線生產模式下實時配決策流程,以及基於j2ee的系統開發架構和基於中間件的數據集成技術等關鍵技術。
  9. The proposed 800 mm diameter salt water main is a pumping main to deliver sea water from the existing kowloon south no. 2 salt water pumping station to the existing yau ma tei salt water service reservoir. this serves to provide flushing seawater supply to south kowloon areas including the west kowloon cultural district scheme area

    建議的直徑800毫米的鹹水管是泵水干管,作用是把海水由現有的九龍南二號海水抽水站至現有的油麻地海水配水庫,從而為九龍南部地區,包括西九龍文娛藝術區的區,提供沖廁用的鹹水。
  10. From china ' s viewpoint, the new deals were a nice counterpoint to the coup mr putin pulled off in may, when he unveiled plans to build a pipeline along the caspian coast that would bring gas from turkmenistan to europe via russia

    在中國看來,新的協議是對普京5月贏得突然成功的一次漂亮反擊,當時普京公布要沿裏海海岸建造一條石油管道,經過俄羅斯將土庫曼斯坦的天然氣到歐洲。
  11. From the angle of managerial operational research, the inventory routing problem ( irp ) in this paper is devoted to solve, taking into consideration the integration and optimization of inventory and transportation, inventory supplement and vehicle routing problem which have to be determined in plan function step at the level of operation in logistics management

    本文所提出的庫存?路線問題( irp )是從管理運籌學的研究視角出發通過關注庫存和運兩個物流環節的集成優化來解決物流管理在作業操作層面上的職能必須回答的問題? ?如何制定庫存補充和車輛配路線安排
  12. No adequate pipeline exists although one is part of the development plan

    沒有足夠的管道,盡管開發包括一條管道。
  13. The plan is to construct a tunnel system to move the currently untreated sewage to stonecutters island, where the existing chemical treatment process will be expanded and new disinfection facilities added

    包括建造一個管道網路,將現時未經處理的污水到昂船洲,亦會擴充昂船洲現時的化學處理設施及增建新的污水消毒設施。
  14. With the wind, pressure and sea surface temperature ( sst ) data provided by ncep / ncar reanalysis project and excess length of day ( lod ) data provided by international earth rotation service ( iers ), atmospheric angular momentum ( aam ) and its horizontal and vertical transportation are computed and analyzed, which are in accordance with maintenance of the zonal circulation. and the anomalous aam is highly consistent with el nino events

    應用ncep / ncar40年再分析提供的風場、氣壓場、海溫等資料以及國際地球自轉服務局( iers )提供的日長變化資料,算大氣角動量及其水平、垂直,分析其氣候及異常特徵,發現角動量及其與緯向環流的維持相一致,角動量異常與厄爾尼諾事件緊密相關。
  15. Stage 1 of the smp began in 1994 and involved increasing sewer capacities and networks

    的第一期工程於1994年開展,區內的污水管道和網路能力相繼大幅提高。
  16. Go together with to send together to are excellent to turn a kind of to pursue to rationalize through the long - term development and quests of go together with and send form, its content lie in under the resources share principle the establishment business enterprise alliance. the business enterprise passes the communication and communicates, becoming the consensus gradually, in the mutual trust with each other the foundation of the benefit up, pass the integration of the level, perpendicularity, same profession, different industry, with the strategic alliance, be in conjunction with the combination, logistics together turn etc. the resources that the cooperation method share is limited, the integration that thus attain the logistics to go together with to

    本文以吉林省交通科技發展項目「道路運業共同配發展模式及關鍵技術研究」為依託,從汽車物流行業的swot分析入手,對汽車物流共同配從概念、優勢、模式、組織方式等方面進行分析,並採用博弈論中的合作對策理論解決費用分攤機制問題,最後通過對一汽大眾入廠物流的實例分析,充分說明共同配是一種提高管理水平,調動供需雙方積極性,貫通整個物流網路,實現資源有效整合的配模式。吉林省汽車物流實行共同配對于降低汽車產業生產流通成本具有重要的現實意義。
  17. With the gradual built of three - gorges hydraulic power station and the execution of the project " electric power transmission from west to east ", the hydroelectric resource is being developed at top speed and the hydroelectric occupy more and more specific weight. the continuous completion and commissioning of large hydraulic power station, as well as the continuous increasing of extra - high voltage and long distance power transmission system, deteriorate the stability control problem of hydro - electricity system

    隨著三峽水電站的逐步建成和「西電東的實施,我國的水電開發進入了高速發展的時期,大型巨型水電站不斷建成投運,超高壓遠距離電系統不斷增長,水電在我國電力系統中所佔比重越來越大。
  18. To build early talent pipeline for multiple functions through a strategic, systematic approach

    通過系統化的管理方法建立人才輸送計劃
  19. Harbour area treatment scheme stage 2a - environmental impact assessment, investigations, tunnel conveyance system design

    凈化海港第二期甲環境影響評估勘測隧道系統設
  20. Supplementary information on 238ds - harbour area treatment scheme 2a - environmental impact assessment, investigations, tunnel conveyance system design

    補充資料238ds凈化海港第二期甲環境影響評估勘測隧道系統設
分享友人