道橋技術 的英文怎麼說

中文拼音 [dàoqiáoshù]
道橋技術 英文
road and bridge technique
  • : Ⅰ名詞(道路) road; way; route; path 2 (水流通過的途徑) channel; course 3 (方向; 方法; 道理) ...
  • : 名詞1. (橋梁) bridge 2. (姓氏) a surname
  • : 名詞(技能; 本領) skill; ability; trick; technique
  • : 術名詞1. (技藝; 技術; 學術) art; skill; technique 2. (方法; 策略) method; tactics 3. (姓氏) a surname
  1. Construction technique of suspension bridge catwalk system

    懸索系統施工研究
  2. B87c breaker is a pneumatic instrument manufactured with the mature technology of america gardener denver corporation. it is more powerful in breaking ferroconcrete, rocks and asphalt. boasting greater efficiency and durability, it suits the requirements of breaking outsized, super - thick and hard objects. it is ideal machinery for the substructural construction of mines, bridges, roads and civil infrastructure

    B87c破碎機採用美國迦納德?丹佛氣動集團公司成熟,是以壓縮空氣為動力的破碎工具,能高效完成鋼筋混凝土、巖石、瀝青等破碎工作,具有馬力更大、效率更高、壽命更長等特點,特別適宜對特大、特厚、特堅硬物體的破碎作業,是礦山、梁、路、市政建設等基礎工程施工的理想工具。
  3. Impacts on the locally rare lesser club - footed bat and short - nosed fruit bat have not been fully addressed either. wbased on the above, we find the subject eia report failing to meet the requirements of the eiao tm and respectfully request the director of environmental protection to consider disapproving the captioned eia report

    基於以上各點,世界自然基金會認為上水至落馬洲支線隧高架方案環境影響評估報告未能符合環境影響評估程序的備忘錄的要求,故懇請環境保護署署長否決該申請。
  4. After expounding the power supply and current collection modes of the rolling stock in shanghai umt pearl line in terms of technology and economy, the author argues that two current collection modes shall be adopted for shanghai umt pearl line, i. e. a third rail collector be on skybridge while the overhead contact line on the ground

    摘要闡述了城市軌交通車輛供電受流方式的特點,並從和經濟兩方面對上海明珠線車輛供電受流方式進行了探討,提出了明珠線車輛應採用雙受流方式,即高架上採用接觸軌受流器受電,地面採用架空接觸網受電弓受電。
  5. Technical features of structure of railway trestle bridge of guangdong - hainan railway link

    粵海通鐵路棧結構特點
  6. Technical code for urban pedestrian overcrossing and underpass

    城市人行天與人行地規范
  7. Kinglead hotel chongqing is the famous four - star business hotel set up by the kinglead industry group. hotel covers the area about 7200 square meter and with the architecture area of 3. 2 square meter up to 15 floors. it is located in the crossing of yuzhong, shapingba, jiulongpo, banan and daudukou district in the shiqiaopu high and new technology development distrist of chongqing. and east to the olympic center, west to yugao park, north to tv station of chongqing and nearby the fiest food and beverage street of chongqing service in 24 hours

    酒店總佔地面積7200平方米,建築面積3 . 2萬平方米,樓高15層,位於重慶市石鋪高新開發區,地處渝中區沙坪壩區九坡區巴南區大渡口區交匯點,東鄰奧林匹克中心,西鄰渝高公園北鄰重慶電視臺與重慶「餐飲第一街」毗鄰,確保你每天24小時的任何時段內都能吃到重慶地美食,讓您商務旅遊生活盡享愜意!
  8. Through analyzing the 324 highway ' s partial cement concrete road surface, sloping slurry, escapes spatial, bridge head jumps off, roadbed subsidence and so on, the grouting technology is proposed

    摘要分析某國路段部分水泥混凝土路面斷板、唧泥、脫空、破碎及頭跳車、路基沉降等主要病害,提出採用灌漿來解決。
  9. The computer supported sketching technology, as an extension and important development of computer aided design ( cad ) technology, has been bridging the gap between the freehand sketching on paper and cad, so as to make cad more perfect by supporting the whole process of product design

    計算機支持的草圖設計在手繪創意草圖和計算機輔助詳細設計之間架起一梁,是對傳統cad的完善和重要發展,也是計算機輔助工業設計( caid )的關鍵,它真正實現了計算機對設計全過程的支持。
  10. Wwf hong kong is greatly disappointed by the decision of the environmental protection department to approve the kcrc s sheung shui to lok ma chau spur line environmental impact assessment report. we found the adverse impacts incurred by the spur line project to be environmentally unacceptable, and the eia report failing to meet the requirements of the technical memorandum for the eia process under the eia ordinance because of the following reasons

    世界自然香港基金會簡稱世界自然基金會對環保署批準九廣鐵路的上水至落馬洲支線隧高架方案環境影響評估報告下稱環評報告深表失望,認為支線工程會造成不可接受的環境影響,而且環評報告亦未能符合環境影響評估程序的備忘錄的要求,因為:
  11. Construction techniques for cast - in - situ box girders of light rail transit with overhead launching gantry traveling on ground tracks

    地面軌走行式造機現澆輕軌箱梁施工
  12. The riveting and welding plant of the company has a very strong technical force, the technical personnel makes up more than 1 3 of the total staff, the company can also undertake the manufacture of various metallurgical structural equipment, formwork, gang board, oil tank, water tank, pipeline and dust - collecting and environmental protection equipment of various sizes, the company also undertakes the construction of bridge, concrete building as well as underwater and high - altitude operations from omniberaing etc. no matter what sizes and shapes of the forging and casting spare parts including special - shaped parts, we will never refuse you and promise to satisfy you with best quality and finish the task on schedule

    公司鉚焊廠,力量十分雄厚,工程人員,佔全體員工的三分之一以上,可以承攬加工各種金屬結構設備模板跳板油罐水罐管工程各種型號除塵環保設備,再如梁鋼筋混凝土建築,水下高空全方位作業等,除些之外,關于鑄造鍛造等工作不論大,中,小型部件,也能做到來而不拒,保證,保質,保量按期完成任務。
  13. Fabrication of the box beam is divided into such parts as reinforcement, formwork, concreting, prestressing, moving and storing of beam, pipe grouting under pressure, end sealing of the beam, water - proof layer on the bridge surface system, protective coating etc. the paper makes description of effective box beam construction technology and workmanship which can be adopted in other projects, such technologies as : manufacturing and fixing of reinforcement, steel reinforcement fixing baseplate, web plate and top plate respectively and lifting the steel skeleton into form, requirements of design and manufacturing and way of utilization for dismantling - erection type formwork and hydraulic formwork, optimization of concrete ratio, concrete pouring process of two ends of beam in priority over the middle, in sequence of first baseplate followed by web plate and top plate at last, concrete pouring in inclined section and in horizontal layer, concrete vibration mainly by external vibrator in assistance with internal vibrator, methods and regulation for steam curing of concrete, dual controls over stress and strain to ensure quality of prestressing workmanship, construction method of effective beam moving by heavy - weight special moving facility, some regulations and key notes about construction of grouting under pressure, beam ends sealing, water - proof layer on the bridge surface system, protective coating

    箱梁製造由鋼筋工程、模板工程、混凝土工程、預應力工程、移存梁工程、孔壓漿工程、梁體封端工程、面防水層和保護層工程等施工環節組成。文中介紹的採用胎具製作和綁扎鋼筋,分底腹板和頂板分別綁扎並吊裝鋼筋骨架入模;拆裝式和液壓式兩種模板的設計、製作要求和使用方法;綜合考慮、優化混凝土配合比,混凝土灌注從兩端至中間、先底板、后腹板、再頂板的施工順序和斜向分段、腹板水平分層、附著式振搗為主、插入式搗固為輔的施工工藝,蒸汽養護的方法和規定;應力應變雙控制確保預應力施工質量的施工;採用重物移運器有效移梁的施工方法;壓漿、封端、面防水層和保護層施工的一些規定和注意事項等都是對箱梁製造行之有效的施工和施工方法,並可為以後類似施工作借鑒。
  14. This paper theoretically inquires into the general principles and the transporting requirements for large item transport. by expounding and proving all kinds of transport plans, the paper gets an effective whole reading transport plan, including the choice of the transport route, the analysis of the bridge and road, the founding of a special transport organization. for transporting the container successfully, the paper carefully analyzes the route and conditions of transporting it, and gives several possible programs. by the way, this paper states every detail of whole reading transport and tries to give each solution of every problems

    本文對大件運輸的一般規律和運輸要求進行了理論探討,根據核反應堆壓力容器的結構特點和運輸要求,經過各種運輸方案的論證,確定出一種行之有效的全公路運輸方案,選定運輸線路,分析梁狀況,建立運輸組織機構,使該大件順利運達目的地。本文詳細說明了核反應堆壓力容器運輸線路條件和幾種可能的方案,闡述了全公路運輸方案的各個細節及所解決的各種運輸難題。
  15. The total length of road, the length of good quality highway, number of the bridges and tunnels are all increased and increasing remarkably

    近十幾年來,通車里程迅速增加,等級大幅度提高,公路梁和隧建設取得顯著成果。
  16. In this thesis, the construction technology of ballastless slab track and ballastless embedded sleeper track are systemically researched and investigated in combining with the real engineering on gouhe bridge and shahe bridge

    本文結合秦沈客運專線新線狗河和沙河大現場施工,對板式無碴軌和長枕埋入式無碴軌施工進行了系統的研究、探索。
  17. Article 19 : building of dam, sluice gate, bridge, wharf and other structures blocking, crossing or bordering a river channel ; laying pipelines or cables across a river, must comply with state - specified standards for flood control and navigation as well as other related technical requirements

    第十九條修建閘壩、梁、碼頭和其他攔河、跨河、臨河建築物,鋪設跨河管、電纜,必須符合國家規定的防洪標準、通航標準和其他有關的要求。
  18. A whole span box girder erecting technology by girder erecting equipment going through a tunnel and portal

    整孔箱梁架機穿越隧及隧口架梁方案
  19. The article consists of three parts mainly : the first part has described the method of detecting the faint signal, mainly include : detection technique of faint signal, principle of the optical fibre sensor, the little lose effects when optic fibre little curved, and the research of the stress sensor of optical fibre. the second part emphasizes on the design of the intelligent photoelectricity system, mainly tells the design of the circuit to process the faint photoelectricity signal, details the software and hardware design of intelligent photoelectricity system made of single chip microcontroller, led, man - machine interface, communication interface, etc. the third part is the network communication of the detection system, details the technology of single chip microcontroller how to group the network, and the communication between single the chip microcontroller system and the modem, and how to realize the data between the field and computer central exchanged through the existing public phone network

    文章主要分為三部分:第一部分論述了微小信號的檢測方法,主要包括微小信號的檢測、光纖傳感器的原理、光纖微彎損耗效應及光纖應力傳感器的研製;第二部分重點講述了智能光電檢測系統的研製,主要講述了微弱光電信號調理電路的設計及由前(后)向通、單片機、 led 、人機介面、通信介面等組成的智能光電系統的軟硬體的具體設計;第三部分為檢測系統的網路通信部分,具體闡述了單片機系統間的組網、單片機和modem之間的通信及通過現有的公用電話網路實現遠程監控的,實現現場檢測系統與梁測控中心的數據交換。
  20. The company possesses advanced technology and professional equipments, which forms the force at the core of completing large - scale bridges and roads with high speed and quality

    公司擁有先進的施工工藝和性能優良的成套專業設備,形成企業的核心力量- -高速度、高質量地完成大型梁、高等級公路、大型隧的施工能力。
分享友人