部分軸襯 的英文怎麼說

中文拼音 [fēnzhóuchèn]
部分軸襯 英文
split bush
  • : Ⅰ名詞1 (部分; 部位) part; section; division; region 2 (部門; 機關或組織單位的名稱) unit; mini...
  • : 分Ⅰ名詞1. (成分) component 2. (職責和權利的限度) what is within one's duty or rights Ⅱ同 「份」Ⅲ動詞[書面語] (料想) judge
  • : 軸Ⅰ名詞1. (圓柱形的零件) axle; shaft 2. (對稱部分的直線) axis 3. (圓柱形的纏繞器物) roller; spool Ⅱ量詞(用於纏在軸上的線以及裝裱帶軸子的字畫)
  • : Ⅰ動詞1 (在裏面托上一層) line; place sth underneath 2 (陪襯; 襯托) set off Ⅱ名詞(襯在裏面的附...
  • 部分 : (整體中的局部或個體) part; section; portion
  1. Auto parts : fuel injection system ( valve follower, plunger piston and fuel injection needle, etc. ), power train ( gear, rolling bearing etc. ), piston parts ( packing ring, gudgeon pin etc. ), cam shaft parts ( pin, bush, oscillation beam and some hydraulic components etc. ), others ( gate lock, accouterment etc. )

    汽車零件:燃料噴射系統(氣門挺桿) 、柱塞、噴油針等) 、動力傳動系統(齒輪、滾動承等) 、活塞件(活塞環、活塞銷等) 、凸輪件(銷、套、搖臂及液壓元件等)和其他件(如門鎖、內飾等) 。
  2. Guiding parts, mandrels, calibration rolls, knives, plate cutters, inserts for percussion drills, masonry drill tips, calibration bushes, drawing cheeks, shearing knives, inserts for golfer shoes

    導向、心、校準軋輥、刀片、倒盤、沖擊鉆機的墊、鉆機鉆頭、校準套、拉模夾具、剪刀、高爾夫鞋的墊。
  3. With an analysis of soil liquefaction potential for free field of nanjing metro line 1 under 7 degree earthquake, as well as for excavated field, in line with railway engineering anti - earthquake design specification, dynamic triaxial tests and theoretical analysis using efficient stress method, the author comes to the conclusion that, when metro plate is located at layer s and the layer is thick, liquefied area is at metro bottom plate ; in some local section liquefied area is at metro top plate, or arch sides at the top of metro in most places

    摘要採用鐵路工程抗震設計規范、動三試驗及有效應力的理論析相結合的方法,對南京地鐵南北線( 1號線)區間隧道開挖后其地基土在7度地震情況下的土層液化情況進行析得出:當隧道底板坐落在5層且5層較厚時的液化區出現在隧道砌底板處;局地段液化區出現在隧道頂及拱腰;大地段的液化區出現在隧道頂板上方。
  4. Plain bearings : metric series - sintered bushes - dimensions and tolerances

    滑動承:米制系列.第1:燒結尺寸和公差
  5. And then according to every process of tunnel construction, simulated analysis is carried out. by combining with monitoring and instrumentation of surround rock periphery displacement and the face of land to sink, surround rock with spray laminating force, surround rock body internal displacement, anchor rod axle force and protect and lining build strength, we have carried out scientific analysis and synthesis judgement of the stability of tunnel wall rock and the security of timbering structure

    然後,根據隧道施工的各個工序進行模擬析,並結合對圍巖周邊位移、地表下沉、圍巖與噴層壓力、圍巖體內位移、錨桿力、支護及砌強度進行的量測與監控,對量測結果作出了科學析,從而對隧道圍巖的穩定性和支護結構的安全性做出了綜合評判。
  6. Rolling bearings. accessories. part 1 : tapered sleeves. dimensions

    滾動承.附件.第1:錐形套.尺寸
分享友人