鉆取的土樣 的英文怎麼說

中文拼音 [zhēndeyàng]
鉆取的土樣 英文
bore plug
  • : 鉆Ⅰ名詞1. (打眼用的工具) drill; auger 2. (指鉆石) diamond; jewel Ⅱ動詞(用尖物在另一物體上轉動) drill; bore
  • : Ⅰ動詞1 (拿到身邊) take; get; fetch 2 (得到; 招致) aim at; seek 3 (採取; 選取) adopt; assume...
  • : 4次方是 The fourth power of 2 is direction
  • : Ⅰ名詞1. (形狀) appearance; shape 2. (樣品) sample; model; pattern Ⅱ量詞(表示事物的種類) kind; type
  1. 224 drillholes, 250 trial pits, refurbishment of 48 existing standpipes piezometers, laboratory testing of soil and rock samples obtained from the investigation works and the structural condition survey on existing highway structures along tuen mun road

    224個孔, 250個探井,重整48個豎管測壓計,將所壤和巖石本進行實驗室試驗,以及對屯門公路上現有公路建築物進行結構狀況勘測。
  2. In order to ensure the safety of engineering, it should be careful to use the test result of normal drilling sampling, the pitting sampling, shaft sampling, or double - tubles and thin - wall soil collecting methods should be used

    為保證工程安全,對常規試驗成果使用應當慎重,對重要工程宜採用探坑、豎井,或採用雙筒薄壁技術。
  3. Due to its light and compact construction the wall saw oukai hds - 350s is the ideal one - man - saw for daily cutting jobs and drilling jobs on job sites

    孔施工時效率高,孔直徑大,是一種可在鋼筋混凝陶瓷玻璃水泥磚及瀝青路鐵路橋隧孔和工具。
  4. Standard practice for using hollow - stem augers for geotechnical exploration and soil sampling

    地質技術勘探和用空莖軸螺旋使用標準操作規程
  5. This paper introduces the hydraulic driven driller and tools which aim at sampling without disturbing the sample. they are mostly used to sample in the lakes and loess layer

    本論文介紹了環境探機具系列中一套:鬆散地層原狀心全液壓探機具,主要應用於湖泊,黃等環境
  6. The working stress of the rc compression member in existing structures can be calculated through measuring strain change before and after drilling the hole, determining the compressive strength and elastic modulus of concrete through the drilled sample and combining the calculating results of the finite element method

    該方法通過測試孔前後孔邊應變變化,利用推定混凝抗壓強度和彈性模量,再結合有限元計算分析,得到已建結構中鋼筋混凝受壓構件工作應力。
  7. Standard guide for selection of soil and rock sampling devices used with drill rigs for environmental investigations

    環境調查用用具壤和巖石裝置選擇標準指南
  8. Generally speaking, the big primary soil sample collected in shaft is the true primary state soil sample, the sample collected by soil collected equipment in drilling is of different degree disturbance

    一般認為豎井中採大塊,是「真正」原狀孔中使用器採原狀存在不同程度擾動。
  9. Standard practice for sampling soils and contaminated media with hand - operated bucket augers

    使用手動斗式螺旋壤和被污染介質標準規程
  10. The building guantou especially the big bridge engineering geology condition is more complicated, by drill to explore the data to announce to public the rock soil body of types, the engineering geology function and the geologic strata circumstance, this time soil kind and the rock samples that investigates to still pass to adopt in great quantities to carry on indoor experiment, get a great deal of data, in order to get the useful rock soil parameter, this thesis still introduces to beg the process of take the rock soil parameter in the way of the mathematics covariance

    館頭特大橋工程地質條件較為復雜,通過探資料揭示了巖成因類型、工程地質性能以及地層情況,此次勘察還通過大量採和巖石本來進行室內試驗,得到了大量數據,為得到有用參數,本論文還介紹了通過數理統計方法求參數過程。
  11. The main concept of the method is to distinguish the depth of the slip plane with the extruding water content zone and the enriched gray clay zone determined from the samples taken by manual twist drill

    該方法主要思想是通過麻花尋找含水量突出帶和灰白富集帶來鑒別滑動面深度。
  12. Through comparative analysis to the test data of tow sampling methods in drilling hole and sampling method in shaft, it was found out by the author that the drilling sampling method has obvious disturbance and depression to the soil sample, which caused the soil sample ' s dry density to be increased, porosity ratio to be decreased, filtration coefficient to be decreased, and modulus of compression to be increased

    筆者通過對孔兩種方法獲與豎井試驗數據對比發現,有明顯擾動和壓密作用,造成了干密度增大、孔隙比減小、滲透系數降低、壓縮模量增大。
  13. Thirty roots of precast reinforced concrete piles and bored and cast - in - place piles in xi ' an had been trained with this model, and nine roots o f precast reinforced concrete piles and eight roots of cast - in - place piles had been predicted by simulating. when contrasted and analyzed the predicting result and actual numerical value, the error is always less than 20 % ( mostly within 15 % ), which has achieved a better result

    利用該模型對西安地區鋼筋混凝預制樁、孔灌注樁各30根作為本進行了訓練,並分別對9根鋼筋混凝預制樁和8根孔灌注樁進行了模擬預測,將預測結果與實測值進行了對比分析,其誤差都在20以內(大部分在15以內) ,得了較好結果。
分享友人