鉆孔測量 的英文怎麼說

中文拼音 [zhēnkǒngliáng]
鉆孔測量 英文
borehole surveying
  • : 鉆Ⅰ名詞1. (打眼用的工具) drill; auger 2. (指鉆石) diamond; jewel Ⅱ動詞(用尖物在另一物體上轉動) drill; bore
  • : 動詞1. (測量) survey; fathom; measure 2. (測度; 推測) conjecture; infer
  • : 量動1. (度量) measure 2. (估量) estimate; size up
  • 測量 : measure; survey; gauge; meter; measurement; measuring; surveying; mensuration; metering; gauging;...
  1. The study includes the hole color tv imagery system for drill hole, even - pole bore - hole acoustic system and acoustic meter, bore - hole multi - point consolidation apparatus, the quick camera computer - aid image for high rocky slope, image technology for layer analysis, safety monitoring technology for the section close to the dam, software for processing and forecasting the slope monitoring data, high precision geodesy monitoring automation system, etc. all the study results are new, advanced and practical, which has applied in the project and gained the obvious benefits

    彩色電視壁成像系統、直接橫波井研究偶極子井下聲系和聲波儀、多點滲壓儀及壓模系統、巖質高邊坡快速攝像微機地質素描成圖、層析成像技術、近壩庫段安全監技術、邊坡監數據處理預報軟體研究、高精度大地自動化系統等項目,研究成果內容新、先進、實用,已在工程中應用,效益顯著。
  2. Wood based panels - determination of formaldehyde content - extraction method called the perforator method

    木基板.甲醛含定.萃取法
  3. By the check - out, inspection and measurement to start construction the industrial art to this test pile with the examination between stake body mass and bearing power, made sure the stroke reasonable operation method drilling under the dissolved cavern geology term ; the pier foundation loading test expressed the lading and rub the lading that resistance drag a glazing for of relation, and to the borehole cast - in - place concrete pile in the karst terrain deliver with break the mechanism, the characteristic of bearing power, proceeding the spot test job of the full of result ; the test data expresses the stake side friction resistance to rises with a bat batch terminal friction resistance very important function, the of tip of pile resistance drag occupies the proportion very few

    通過對本次試樁施工工藝的檢和樁身質及承載力的檢驗,確定了沖擊在溶洞地質條件下的合理使用方法;基樁承載實驗表明了荷載與摩擦阻力之間的關系,並對巖溶地區的嵌巖灌注樁的荷載傳遞和破壞機理、承載力特性,進行了富有成果的現場試工作;試驗數據表明樁側摩阻和支盤端阻起很重要的作用,樁端阻力所佔比例甚少。這與設計樁基時的計算模式相差很大,承載力也較設計增加;使用力學數值分析方法和有限單元法,對灌注樁樁端下的巖體強度和結構穩定性方面進行模擬計算和定研究。
  4. In accordance with the testing results and the analysis concerned, it is considered that the seismic wave method, borehole acoustic method and indoor rock mechanics test are feasible to evaluate the engineering quality of the foundation rock for the toe slab of the dam comprehensively, and the results can lay a reliable foundation for the accepting the foundation rock for the toe slab of the dam

    根據檢結果與分析,認為採用地震波法、聲波法以及室內巖石力學試驗綜合評價水電站大壩趾板建基巖體工程質是可行的,其成果可為大壩趾板建基巖體驗收提供依據。
  5. Based on seismic wave method, borehole acoustic method and indoor rock mechanics test, the dynamic and static parameters of the foundation rock for the toe slab of the concrete face rockfill dam for shuibuya hydropower station are tested, and then the relationship among the rock quality, dynamic parameter and static parameter are established with the parameters obtained from the test, furthermore, the classification and the quality evaluation are made as well

    摘要採用地震波法、聲波法以及室內巖石力學試驗法,對水布埡水電站面板壩趾板建基巖體進行了動、靜參數試,並根據所獲的參數建立了巖體質、巖體動力學和靜力學參數三者之間的相關關系,對工程巖體進行了質分級和質評價。
  6. Measures to locate reference points, and drills and taps holes as needed to mount assemblies, components and parts, using hard tools and power tools

    定位參考點位置,根據安裝裝配、組件和零件的所需進行和打洞。會使用機械工具和電力工具。
  7. Mine plans - drilling and cavern - part 2 : brine caverns

    礦山平面圖.洞.第1部分:鹽水洞
  8. A synthetic evaluation method for quality inspection of cement - soil mixed pile by core boring

    水泥土攪拌樁取芯法質綜合評定方法
  9. Measuring dimension of shaft coupling bolts and reamer hole

    軸系連接螺栓和尺寸
  10. 1. setting a measure device on the drilling machines, a new method of gaining the characters of rock and soil from the blasting drilling is gotten, which is economic and accurate and from which the characters of different parts of the blasting hole are got accurately

    取得的主要成果如下: ( 1 )在機械上附加一進速度裝置,通過在土巖爆破施工現場直接從爆破進過程來實時獲取炮不同部位的巖石性質。
  11. With the retrospection of the developing course of the bored pile foundation and combining with my practical experience, the paper expatiates upon the design principle of percent of fit of the stone - fill grouted concrete and the main factors of the influence strength target, and the final pile technique introduction of the hollow pile of the stone - fill grouted concrete and the precast prestressed concrete ; baesd on the theory of slurry hydraulics, empirical calculation formulas of the radis and height of diffuse slurry are deduced in this paper ; it analyzes the test pile materials of the hollow pile foundation, such as luoyang yi river bridge and dangwang jian river bridge ; the new technique of the hollow pile, which provides the generalization and application with base materials, expounds its feasibilities, adaptabilities and economy

    本文通過綜合分析國內外樁基礎的發展歷程及研究現狀,重點討論了填石壓漿混凝土空心樁、預制預應力混凝土空心樁的成樁工藝、填石壓漿混凝土的配合比設計原理及影響強度指標的主要因素;根據泥漿水力學原理,導得了考慮各種因素的水泥漿液在預填骨料中的流動影響半徑和上升高度;結合河南省洛陽伊河大橋、黨灣澗河大橋工程實踐,討論了填石壓漿混凝土空心樁基礎的質方法及標準;並在此基礎上,深入分析了樁側、樁端承載能力,提出了填石壓漿混凝土空心樁的設計計算理論和方法。最後,論證了空心樁新工藝的可行性、適應性、經濟性,為大力推廣應用空心樁新技術提供了可靠的技術資料。
  12. In this section the author analyses the rules of the pile ultimate tip resistance and the shaft friction resistance distribution and their exertion of cast - in - place socketed piles instrumented with strainometers in soft muddy rock. the second aspect of the paper is the analysis on the current rock pile vertical bearing capacity in the four standards gb50007 - 2002, tb 10002. 5 - 99, jtj024 - 85 and jgj94 - 94, then the design method with correlated formula of socketed piles in xigeda - mudstone is given. at the end of this paper, based on the research of pressure grouting technique in recent years, and combined with in - site test result, this paper puts forward the design and calculation method to grouted pile in xigeda - mudstone and the principle of choosing grouting parameters, which provid es experiences for applying this technique and further studying

    本論文結合省級科研項目「西攀高速公路昔格達組泥巖層中樁提高承載力的研究」 ,所做的研究工作主要在以下三個方面:一是根據8根樁身內埋設元件試樁的單樁豎向靜載荷試驗資料,分析了各試驗樁特別是常規沖灌注嵌巖樁在昔格達泥巖中的軸向力、側摩阻和樁端阻力的分佈和發揮規律;二是在討論現行規范對嵌巖樁承載力的計算公式的基礎上,探討了在昔格達泥巖層中的沖灌注嵌巖樁的側摩阻和端阻的計算方法,並推薦了相應的計算公式;最後,在吸取近年來對灌注樁后注漿技術研究成果的基礎上,結合現場試驗研究結果,分析了該項技術在昔格達巖層中的應用效果,提出了相應的參數選取,從而為壓力灌漿技術的工程應用和進一步研究提供經驗,並為今後在該地層中合理選用樁型以及指導施工提供了依據。
  13. The article introduces the basic concepts and common methods of fuzzy mathematics, initially discussing the applications of fuzzy mathematics in the following aspects : 1 ) division of " skidding " strata with grade of membership that are drilled with diamond bits ; 2 ) comprehensive evaluation on the application in evaluation of diamond bits, classification of rock drillability, and evaluation of clay ; 3 ) classification of " hard rock " through fuzzy clustering analysis ; 4 ) estimation of completion time of boreholes and evaluation of underg round water with fuzzy mathematics ; 5 ) identification of new ore areas and option of best water resource area with fuzzy model ; 6 ) option of diamond bits and evaluation on oil field development plan with fuzzy resemble option and the improved calculation method ; ? ) prediction of mud slurry performance and of the amount of surging water in ore pits with fuzzy control ; 8 ) comprehensive evaluation of diamond bits and supporting plan of deep foundation pit with fuzzy optimal theory

    初步探討了以下幾方面的應用: 1 )用隸屬度劃分金剛石進「打滑」地層; 2 )綜合評判在金剛石頭評價、巖石可性分級及探造漿粘土評價中的應用; 3 )用模糊聚類分析進行「硬巖石」分類; 4 )用模糊數進行竣工時間預估及地下水質評價; 5 )模糊模式識別在新礦區類型識別和最佳水源地選擇中的應用; 6 )模糊相似選擇及其改進演算法在金剛石頭選擇和油田開發方案評價中的應用; 7 )模糊控制在泥漿性能和礦坑涌水中的應用; 8 )優化理論模型在金剛石頭和深基坑支護方案綜合評價中的應用。
  14. Measuring method on height of water flowing fractured zone using loses of drilling fluid

    導水裂縫帶高度的沖洗液漏失方法
  15. The company has the advanced modern equipments, including more than 10 sets of imported cncs and nc edms

    公司擁有十多臺包括進口加工中心和數控火花機、三坐標儀、合模機、深等現代化加工設備。
  16. Implants for surgery - metal intramedullary nailing systems - connection devices and reamer diameter measurements

    外科植入物.金屬骨髓腔內插釘系統.連接設備和擴直徑
  17. Discussion on quality inspection of grouting pales with large - diameter hole

    淺議大直徑灌注樁的樁身質
  18. Two methods " principle of three dimensional stress determination developed from the above four basic ones by yangtze river scientific research institute are presented, one based on hydraulic fracturing and hydraulic tests on preexistent fractures in single borehole, another one based on ckx - 97 hollow package 3 direction strain gauge

    並對長江科學院完善的單中水壓致裂法三維地應力和ckx - 97型空心包體式三向應變計的三維地應力的計算公式作了推導。
  19. And the drill discharge well longing method can also be used in studying crack and calculating the opening

    井法也可研究裂隙,計算裂隙開度。
  20. This paper introduces four kinds of mehtods that is used to investigate crack in underground rock stratum : borehole core method, ultrasonic imaging method, borehole television method, and borehole discharge well logging method

    摘要本文介紹了地下巖層裂隙的4種勘察研究方法:巖芯法、超聲成像法、電視法、井法。
分享友人