鉆進機理 的英文怎麼說

中文拼音 [zhēnjìn]
鉆進機理 英文
drilling mechanism
  • : 鉆Ⅰ名詞1. (打眼用的工具) drill; auger 2. (指鉆石) diamond; jewel Ⅱ動詞(用尖物在另一物體上轉動) drill; bore
  • : 進構詞成分。
  • : machineengine
  • : Ⅰ名詞1 (物質組織的條紋) texture; grain (in wood skin etc ) 2 (道理;事理) reason; logic; tru...
  • 機理 : mechanisation; mechanization; mechanism
  1. The study includes the hole color tv imagery system for drill hole, even - pole bore - hole acoustic system and acoustic meter, bore - hole multi - point consolidation apparatus, the quick camera computer - aid image for high rocky slope, image technology for layer analysis, safety monitoring technology for the section close to the dam, software for processing and forecasting the slope monitoring data, high precision geodesy monitoring automation system, etc. all the study results are new, advanced and practical, which has applied in the project and gained the obvious benefits

    孔彩色電視孔壁成像系統、直接橫波測井研究偶極子井下聲系和聲波儀、孔多點滲壓儀及壓模系統、巖質高邊坡快速攝像微地質素描成圖、層析成像技術、近壩庫段安全監測技術、邊坡監測數據處預報軟體研究、高精度大地測量監測自動化系統等項目,研究成果內容新、先、實用,已在工程中應用,效益顯著。
  2. By the check - out, inspection and measurement to start construction the industrial art to this test pile with the examination between stake body mass and bearing power, made sure the stroke reasonable operation method drilling under the dissolved cavern geology term ; the pier foundation loading test expressed the lading and rub the lading that resistance drag a glazing for of relation, and to the borehole cast - in - place concrete pile in the karst terrain deliver with break the mechanism, the characteristic of bearing power, proceeding the spot test job of the full of result ; the test data expresses the stake side friction resistance to rises with a bat batch terminal friction resistance very important function, the of tip of pile resistance drag occupies the proportion very few

    通過對本次試樁施工工藝的檢測和樁身質量及承載力的檢驗,確定了沖擊在溶洞地質條件下的合使用方法;基樁承載實驗表明了荷載與摩擦阻力之間的關系,並對巖溶地區的嵌巖灌注樁的荷載傳遞和破壞、承載力特性,行了富有成果的現場測試工作;試驗數據表明樁側摩阻和支盤端阻起很重要的作用,樁端阻力所佔比例甚少。這與設計樁基時的計算模式相差很大,承載力也較設計增加;使用力學數值分析方法和有限單元法,對孔灌注樁樁端下的巖體強度和結構穩定性方面行模擬計算和定量研究。
  3. 1 it has great drilling capability, wide range of application, rapid drilling speed and high drilling efficiency, as well as powerful ability of eliminating accident

    特點1能力強,適用范圍廣孔速度快,處事故能力強,效率高。
  4. On the basis of this, the hydraulic system of the mkd - 5s drilling machine is resigned for improvement. specially energy - saving design of the feeding system is made and the control characteristic of the electro - hydraulic proportional controlled system of feeding is studied both in theory and in experiment

    在此基礎上,應用電液比例技術對mkd ? 5s型液壓系統行了改造設計,重點對給系統行了節能設計,從論和實驗兩方面對給加壓電液比例控制系統的特性行了研究。
  5. However the machining of light - composite armor material is still a dead - hand problem to be resolved, and so, this dissertation analyses and researches the mechanical - physics performance, the tissue - structure characteristics and the machining mechanism of light - composite - armor material ( fiber - reinforced polymer - based composite and defense - bullet ceramics ) ; researches the machining technology of light - composite - armor material, developing the special cutters and special clamps. researches the machining technology of light - composite - armor after molding, mainly resolving the drilling a hole and cut a straight - line of defense - bullet ceramics / fiber - reinforced polymer - based composite. using the machining tools, which mainly include multiple - tools machining fiber - reinforced polymer - based composite holes and diamond saw - blade, diamond hole - drills machining defense - bullet ceramics and so on, researched in this dissertation, the machining - experiment of composite, defense - bullet ceramics and ceramics / composite was carried through, and good machining result was gained

    然而,輕質復合裝甲材料的加工仍是一個亟待解決的問題,為此本課題分析研究了輕質復合裝甲材料的物械性能、組織結構特點和加工,即:維增強聚合物基復合材料和工程陶瓷;研製了輕質復合裝甲材料加工所用的專用工裝,主要包括專用刀具和專用夾具;研究了輕質復合裝甲成型后的加工技術,主要解決了工程陶瓷復合材料板的孔和直邊切割加工;利用所研究的加工纖維增強聚合物基復合材料臺階孔用的復合刀具、切割直邊用的金剛石釬焊切割鋸片、加工工程陶瓷用的金剛石套料、切割工程陶瓷復合材料板用的金剛石切割鋸片等加工刀具對纖維增強聚合物基復合材料和工程陶瓷,以及工程陶瓷復合材料板行了加工實驗,並取得了良好的實驗效果。
  6. At the doctoral and master s degree levels, there are edd, phd, ma, med, msc and mphil programmes with different concentrations for promising individuals to pursue intensive study and embark on research endeavors of importance

    本院開設的研究院課程包括教育博士、哲學博士、文學碩士、教育碩士、學碩士及哲學碩士等學位課程,提供不同的專修或專研范圍,為有志研教育學的學員提供會及研究經驗。
  7. The company has cad design centre, precision etching and developing production line, chemical cleaning production line, scrubbing production line, high - power exposing machine, cnc drilling machine, suctioning silk screen machine, speedy press, vacuum multilayer press, chemistry sink copper and metal surface treating production line, punches, etc. import or domestic advanced equipment

    公司擁有cad設計中心,精密蝕刻、顯影生產線,化學清洗生產線,磨板生產線,大功率曝光,數控床,吸氣絲印,快壓,真空層壓,化學沉銅及金屬表面處生產線,沖床等口或國產先設備。
  8. By analyzing the developing situation of the trenchless technology at home and abroad, and combining the characteristics of the modern computer multimedia technology, the article brings forward that it is necessary to design the multimedia training system on horizontal directional drilling. then base on introducing the content of horizontal directional, the article puts forward the scheme of overall, engineering reconnaissance, slurry knowledge, construction principles, construction process, construction equipment, construction design model, the function, the designing technology, the applying forefound and the mending plan of the the multimedia training system on horizontal directional drilling

    本論文從國內外非開挖技術的發展情況分析,以及結合現代計算多媒體技術的特性,提出開發「水平定向鋪管技術多媒體培訓系統」的必要性;並在簡略介紹水平定向鋪管技術的基礎上,給出開發「水平定向鋪管技術多媒體培訓系統」的「總論」 、 「施工前工程勘測」 、 「泥漿處」 、 「施工原」 、 「施工工藝」 、 「施工具」和「施工設計」七大模塊的具體設計方案、實現的主要功能和系統開發的關鍵技術,最後分析了該系統的應用前景和改方向。
  9. The paper essentially research application of computer graphics processing and simulation of object oriented technique at visual emluator of drilling simulator. and stressfully research computer graphics processing together with give part realization. elaborating characteristic of graphics processing based on opengl, and give the three means of realization of opengl : software implementation, hardware realization and graphics accelerate mode, and has been penetrated into the acquirement to the architectural structure of opengl

    本文重點研究了計算圖形處和面向對象的模擬技術在井模擬器可視化模擬上的應用。對計算圖形處行了較為詳盡的研究並給出了部分實現;詳細闡述了基於opengl的圖形處的特點,給出opengl的三種實現方式:軟體實現、硬體實現和三維圖形加速模式,並對opengl的體系結構行了深入探討。
  10. In this paper firstly introduces the development of scientific drilling project in the developed countries, secondly presents the opportunities and challenges faced by china in the process of proceeding ccsd ( chinese continental scientific drilling project ), and the main contents of the paper focus on researching and developing a novel drilling fluids, formate brine solid - free drilling fluids, that may be suitable for ccsd

    本文首先介紹了科學探在發達國家的行情況,相繼闡述了中國行大陸科學探工程將面臨的會和挑戰,論文的主要內容是研究一種能適合大陸科學探的井液體系? ?甲酸鹽無固相井液體系。論文的重點分甲酸鹽無固相井液體系的若干論問題研究和試驗兩部分。
  11. On the basis of front research and summing - up guiding drilling ' s rigs and projects of laying pipeline nation and abroad, develop " guiding drilling ' s rig optimum seeking system ", it provides directive significance for guiding drilling construction

    基於以上兩方面的研究,在對國內外現有導向設備和導向鋪管工程的研究與整的基礎上,開發出了「導向設備優選系統」 ,對導向施工具有指導意義。
  12. Current research of failure mechanism and physics model of pth in manufacture process including drilling, electroless plating and electroplate were reviewed

    孔、化學鍍銅、電鍍三個主要工藝入手,對目前製造過程鍍通孔失效的與物模型的研究現狀行總結。
  13. This differ with computation modal that design the foundation pier very big, bearing power too than design increment ; usage mechanics numerical analysis device with limited a logarithm of timw fitting method logt, noted the rock strength in stake tip of the borehole cast - in - place concrete pile to proceed with the structure steadiness the simulation compute to study with the fixed amount, designing for the engineering to start construction to provide for science with the spot

    本研究結合現場試驗、力學數值分析和有限單元分析,對巖溶地段孔灌注樁的施工工藝、荷載傳遞、持力層頂板厚度及嵌巖深度等方面作一些探討性研究,為該工程的設計和施工積累經驗,並為該類課題的一步研究奠定了基礎。
  14. Abstract : based on the in - situ pressure - grouting experiments and the full - scale pile tests of xinxiang and ligou and yangzhou bridges, the process and effect of jet pressure - grouting are presented in this paper. the mechanism of increasing the performance of bored piles by grouting is also analyzed. an engineering experience of applying the new technique is presented in the paper

    文摘:根據新鄉、鞏縣及揚州等地孔灌注樁樁底壓力灌漿現場試驗和樁的靜載試驗,介紹了樁底壓力灌漿的工藝及壓力灌漿的效果,並對壓力灌漿提高孔灌注樁承載力的行了分析,對其推廣應用作了介紹。
  15. In the following several chapters, the paper introduces the main design procedures, including " selecting the scheme ", " calculating the parameters of technique specialty ", " the constitution and characteristic of the driller ", " the design calculation and calibration of the crucial parts ". then discusses the drilling technology and introduces the work principle, the complexion of the sampler drill " s installation and testing. at last, the paper generalizes the design and the experimentation, points out the next target

    分「總體方案的選擇」 、 「技術特性參數的確定」 、 「組成和特點」以及「關鍵部分結構的設計計算和校核」幾個部分;然後是工藝的討論,並介紹了三套取心具的工作原以及室內安裝、調試、實驗的情況;最後總結了本次設計及實驗情況,並指出下一步的努力方向。
  16. Five factors of effecting specify the bearing capacity of drilled grouting pile ( engineering properties of soil, structural dimension of pile, stiffness of pile, time ) have been concluded through introducing the transmission of load mechanism of drilled grouting pile. at the same time, the effecting parameter has been collected. the paper build the ann model in predicting ultimate bearing capacity of drilled grouting pile and discuss in detail the extraction of inputting nodes information when quoting the fundamental principle of ann model and introducing research process of the improved bnn

    本文簡要介紹了樁基承載力的研究現狀並指出將神經網路引入樁基工程的意義,從介紹單樁荷載傳遞出發總結了影響單樁極限承載力的五種因素(樁周土的工程性質、樁身結構尺寸、樁的剛度、時間以及施工工藝)並提取了相應的參數;引用神經網路基本原,詳細介紹了改bp神經網路的研究過程,從而建立了預測孔灌注樁極限承載力的神經網路模型;並詳細討論了本模型的神經網路輸入結點信息的提取,在工程實例的基礎上行了數值計算。
  17. Thereby, this paper has carried through an in - depth study on wear mechanism between tool joint of drill pipe and casing, problems caused by wear and measures to deal with wear based on researches at home and abroad. the research contents include : in order to reveal mechanism of wear occurred between tool joint and casing, distribution of the contact pressure between the tool joint and casing for different loads was obtained with finite element method. furthermore, the mathematical model of maximum contact pressure and the wear depth on casing was established

    所以,本文在國內外研究的基礎上,對桿與套管摩擦磨損的、引發的系列問題及其預防措施行了深入研究,研究內容主要包括:為探討桿接頭與套管摩擦磨損的,採用有限元法研究了不同載荷下接頭與套管之間接觸壓力的分佈規律,並建立了最大接觸壓力與磨損量的數學模型。
  18. In this paper, depending on the enormous 356 pile testing date detailed with soil and pile parameters and p ~ s curves, covering xi ' an and adjacent areas, we analyzed the load transmission mechanism of pile in loess foundation, and proposed a kind of hyperbolic load transmission function between pile and it ' s neighboring soil. meanwhile, we created a mathematical model to predict p ~ s curve and bearing capacity of single pile. by analyzing the compacting effect caused by pile - sinking of pressed pile in loess and it ' s influence on bearing capacity and settlement, two parameters, kc and ke are introduced to modify the soil cohesive c and deformation modulus es

    本文利用現己收集到的西安及其周邊地區356根打入樁、靜壓樁、灌注樁的現場試樁資料(其中打入樁67根,靜壓樁121根,孔灌注樁168根,並有詳細的地層勘探資料,樁深資料,荷載沉降?曲線)對西安黃土地基中的打入樁、靜壓樁、灌注樁的荷載傳遞行了分析研究,認為用雙曲線型的荷載傳遞函數模擬樁土之間的荷載傳遞函數是合適的,並用荷載傳遞分析的方法建立了計算p s曲線的數學模型及極限承載力的確定方法。
  19. Which often produces some unexpected problems, such as prolonging time limit of project, increasing engineering quantities and cost, etc. through test on the site, dynamic value analysis, finite element unit method, the paper researchs construction technology of in - situ pile, transfer theory, thickness of supporting layer of head slab and depth of pile in karst area, provides some important conclusions, directs effectively the design and construction of this kind of projects

    但因溶洞的分佈規律性差,現有勘探手段難於事先查明它的準確位置及大小,因而常常給施工帶來意想不到的問題:工期延長、工程量增加及工程費用增加等。本文通過現場試驗、論計算和有限單元分析,對巖溶地區孔灌注樁的施工工藝、荷載傳遞、持力層頂板厚度及嵌巖深度等方面行了較為系統的研究,得出了一些重要結論,有效地指導了該類工程的設計和施工。
  20. Analysis and disposition for an accident of drill bit being buried in large diameter drilling with non - circulation of slurry by hydraulic piling rig

    某旋挖大口徑無循環事故的分析處
分享友人