鋼包容量 的英文怎麼說

中文拼音 [gāngbāoróngliáng]
鋼包容量 英文
ladleful
  • : 鋼名詞(鐵和碳的合金) steel
  • : 量動1. (度量) measure 2. (估量) estimate; size up
  1. Assembly plan should cover : calculation on amount of members and joints, assembling equipments ' choosing, assembly flow sequence, assembly method, progression plan, personnel management, steel members mobilization, quality standards, safety measures and special construction techniques

    編制的組織設計的內括:計算構件和連接件的數,選擇吊裝機械、確定流水程序、確定吊裝方法、制定進度計劃、確定勞動組織、規劃構件進場、確定質標準、安全措施和特殊施工技術等。
  2. The study lies in following aspects : 1 ) a great number of experiments on sfrc are carried out to obtain the basic data of sfrc energy properties, which are the fundamental parts of further study. 2 ) a probability analysis based on statistical theory is done to all the experiment data. in the end, energy criterion for sfrc associated with security criterion are calculated and listed for future use

    本文主要針對纖維噴射混凝土在單層隧道襯砌中的應用進行了研究,內括以下幾個方面: 1 )進行了大纖維混凝土標準試件試驗,試驗的成果和數據為研究纖維混凝土的能特徵提供了事實依據和參考; 2 )運用概率統計方法對纖維混凝土的指標進行了可靠性分析,得出了實際可以接受的保證率下的纖維混凝土能指標; 3 )通過合理的假設和簡化,研究了纖維混凝土構件在破壞過程中的能耗散機理。
  3. Packaging - steel drums - removable head open head drums with a minimum total capacity of 208 l, 210 l and 216, 5 l

    裝.筒.最小總為208升210升和216 . 5升的活動蓋圓筒
  4. Packaging - steel drums - non - removable head tight head drums with a minimum total capacity of 121 l, 216, 5 l and 230 l

    裝.筒.最小總為212升216 , 5升和230升的密封蓋圓筒
  5. It is made of fused magnesite and high purity flake graphite by adding metal composite antioxidant and phenolic resin as binder. it has the excellent properties of corrosion resistance, spalling resistance, resistance to oxidation and better thermal shock resistance. it can be used in all kinds of converters, eaf, refining ladles and common ladles. upon request, multiple lining - up designs of reasonable materials can be provided according to the working conditions of above mentioned furnaces

    採用電熔鎂砂、高純鱗片石墨為主要原料,添加金屬復合抗氧化劑,以酚醛樹脂為結合劑製成的製品具有優良的抗浸蝕性、抗剝落性、抗氧化性和良好的抗熱震性,適用於各種的轉爐、電爐、精煉及普通,本公司可根據用戶要求,針對上述4種熱工窯爐的具體使用條件提出爐襯的材質綜合砌築方案。
  6. This machine adopts a whole stainless steel packing, the temperature is a number to show automatically control, heat or reduce the heat to all have a signal beacon manifestation, the electric current electric voltage size switches on to all have a manifestation, automatically feeding powder can adjust soon, spread to move part is the bean that the my plant produce product machine appropriation decelerate machine, electrical engineering is the steel plate adjustable type, the machine bottom use of upscale run a round, easy to ambulation, cool off part is automatically circulating water device, the bottom establishes keep of big capacity water tank and heat part is heat preservation economy energy type, normal production can economy in electricity quantity of 30 %, in fact use electricity charges and burn coal basic hold even

    本機採用全不銹裝,溫度是數顯自動控溫,加溫或降溫均有信號燈顯示,電流電壓大小開機均有顯示,自動喂粉可以調速,傳動部分是本廠生產的豆製品機械專用減速機,電機架是板可調型,機器底部用的高檔跑輪,便於移動,冷卻部分是自動循環水裝置,底部設有大的儲水箱,加溫部分是保溫節能型,正常生產可節約用電的30 % ,其實用電費和燒煤基本持平。
  7. In the paper, the methods how to manage the raw material fields is devoted. accord to the wuhan iron and steel ( group ) co. industrial port " s level, with operation research, physical distribution, computer technology how to deal with transport, loading or unloading stockpiling advance an idea. in the paper, the raw material fields " physical distribution system is departed to three part : optimum burden, the best line, loading and unloading advance, step by range and step by level, its can be implement so as to improve the product ' s competition ability

    本課題的研究內主要是原料場混勻配料及作業線系統優化,它括配料計劃的選擇及作業線選擇、料場的貨位及貯的合理配置等幾項的綜合優化,是一個比較大的物流系統的規劃。主要以武工業港原料場為例證展開研究的。配料計劃的優化是以可以降低成本並保證成份控制為目標進行線性規劃的。
  8. In accordance with the practical situation of ben - gang water supply systems, this thesis find out the problem in the operation. the research contents include three aspects which are short - term load forecasting and decision of optimum operation scheme and the renewal of equipment in water supply systems. the firstly discusses the short - term water consumption problem with three models : grey forecasting model, artificial neural network model and modified artificial neural network model, it is very valuable that the modified artificial neural network model

    本文根據本供水系統的實際狀況,找出了本供水系統運行中存在的不足,進而提出了相應的改進措施。主要內括供水系統短期負荷預測,確定系統最優調度方案和設備更新與設備投資問題。在預測部分運用灰色預測方法, bp神經網路方法和改進的神經網路方法進行用水預測,並進行比較分析,重點提出用遺傳演算法進行神經網路權系優化的改進演算法。
分享友人