錨固端 的英文怎麼說
中文拼音 [máogùduān]
錨固端
英文
anchord end-
The cable is then tensioned and anchored at the ends.
然後將鋼索張拉並錨固於端頭處。3. a space bond slip relation of reinforcements in either end of a member is proposed, based on one - dimensional bond slip model of reinforcements proposed by teng zhiniirmg from tsinghua university, the first - time loaded ascending stage ? curve of which model is modified as the line which parameters are not changed so as to simply the computation. the bond, slip is regarded as the boundary nonlinearity of a member
3 、採用清華大學滕智明建議的一維鋼筋粘結滑移恢復力模型,但從簡化計算的角度出發,將首次加載的上升段曲線改為直線,並假定構件端部的諸多縱向鋼筋的滑移服從平截面假定,考慮由節點錨固區粘結滑移引起的構件端截面軸向和兩轉角附加變形。Consideration of the additional axial, two angular deformations generated by the bond slipping in anchorage zones of joints, the assumption is made, that the plane section of either end of a member before bond slipping of reinforcements remains afler bond slipping of reinforcements. additional deformations * contribution to stif ? nesses of plastic sub - elements is formed from the boundary nonlinearity of plastic stabelements. the space bond slip relation can truly compute bond slip in anchorage zones, additional def ? rmatinns, and their contribution to the space nonlinearity of a niember, has used iii space nonlinear analysis of columns and spandrel beams in this dissertation
附加變形對塑性子區域的剛度貢獻,看作是塑性子區域的邊界非線性,建立了構件端部子區域基於構件邊界非線性的鋼筋與砼之間的空間粘結滑移關系,能較真實地求得錨固區的粘結滑移、附加變形以及他們對構件空間非線性性能的貢獻,並運用於柱、裙梁的空間非線性分析之中。The fastened end of bar was machined to multi cone - shaped heads. through the cone heads compress the inorganic anchoring material, the load was transmitted from bars to base material. it changes the transfer path of loads and takes advantage of high compress strength of inorganic material, thus enhanced the anchor intensity of inorganically post - installed bars
本文提出一種新型的植筋技術? ?帶錐頭無機植筋,它把鋼筋錨固端加工成多個錐頭,通過錐頭對無機錨固材料的擠壓,將荷載傳遞給基材,使基材與無機錨固材料的界面上產生剪壓復合應力狀態,改變傳統植筋的受力機理,利用了無機錨固材料抗壓強度高的特點,從而提高了無機植筋的錨固強度。According as distortion harmonious condition of traction cable ' s anchorage on cable - suspended traveler, increasing amount of cable tension during casting concrete was computed, and under every key operating condition of casting concrete, traveler ' s frontend elevations were educed. we seriously controlled wenhui bridge ' s course of cantilever casting concrete by this method, which assured that the bridge ' s construction went on successfully. and then, it was discussed how to simulate the effect of prestressing force in spatial analysis
根據掛籃前端牽索錨固點處的變形協調條件建立了掛籃上混凝土澆築過程中牽索索力的增加量,並推導了掛籃上混凝土澆築過程中的各主要工況下掛籃前端標高的計算公式,對文暉大橋掛籃上混凝土澆築過程中的牽索索力和掛籃前端標高進行了細致地控制,確保了混凝土澆築的順利進行,為整個主梁線形和索力的雙控打下了良好的基礎。Introduced by prestressed pier in the gate of spillway in xiao xia hydroelectric power station, the text reasonably established 3 - d finite elements mechanic model by the advanced finite elements popular in the world which can expediently impose tension of anchor funicular at its place. it also considered possible diversified combination of loading, and indicated that the effect of its prestressed action is fruitful compared with its conventional counterpart by study of mechanic calculation in comparison. as a result, it vastly improved burdening state of pier. by analysis of 3 - d finite element method, it also gained the stress result indifferent boundary conditions such as breast wall joint support and fixed support, and the displacement result in diversified loading combination. those results gained the instructive and reference value in design of prestressed pier
本文結合黃河小峽水電站泄洪閘預應力閘墩這一工程實踐,採用國際上已成熟的有限元方法,合理地建立了預應力閘墩的三維有限元模型,該模型可方便地按預應力錨索的點位施加錨索預張拉力,考慮了可能發生的多種荷載工況組合,並與無預應力閘墩結構進行了對比分析研究,指出其預應力效果是明顯的,可以大大改善閘墩結構的受力狀態,通過三維有限元分析,還得到了胸墻簡支、固端不同情況下的應力成果和各荷載下的位移成果,這些成果的取得對預應力閘墩的設計具有一定的指導和參考價值。Regarding the rc beams subjected to concentrated load or even load and braced by bonding steel, an analysis is made on the relevant factors influencing maximum anchorage shear stress of steel sheet. the analysis is based on elastic theory and makes use of the formula for calculating anchorage shear stress of steel sheet. as indicated by the results, the maximum anchorage shear stress not only realtes to such parameters as height of cross section of rc beam and span but also relates to the thickness of adhesive layer, elastic modulus, thickness of steel sheet, and length of steel sheet. the present method will check maximum an chorage shear stress on the end of shear sheet so as to prevent rc beam from local damage. the present results will offer important reference for our country to further perfect bracing design by bonding steel method
在彈性理論的基礎上,利用鋼板錨固剪應力計算公式,對在集中荷載或均布荷載作用下採用粘鋼加固的混凝土梁,分析鋼板錨固最大剪應力的有關影響因數.結果表明,最大錨固剪應力不但和混凝土梁的截面高度、跨度等參數有關,還和粘膠層厚度、彈性模量、鋼板厚度及鋼板長度有關.採用文中方法可以對鋼板端部最大錨固剪應力進行驗算,防止混凝土梁出現局部受拉破壞.研究結果為進一步完善我國粘鋼法加固設計提供重要的參考資料The vortex - excited oscillation, wake galloping, rain - wind vibration and buffetting are the main cause of the fatigue in the vicinity of the anchorages on cables of cable stayed bridges
渦激振、風雨振、尾流馳振、抖振等風致振動容易造成斜拉橋拉索錨固端疲勞,促使銹蝕加快,嚴重影響拉索的使用壽命。Steel products - end coupling and anchoring steel devices for high adherence steel for concrete reinforcement - part 2 : test methods
鋼製品.混凝土鋼筋用高粘性鋼的終端結頭和錨固裝置.第2部分:試驗方法Steel products. end coupling or anchoring devices for high adherence steel for concrete reinforcement. part 1 : requirements for mechanical performances
鋼製品.混凝土鋼筋用高粘性鋼的終端結頭或錨固裝置.第1部分:機械性能要求Floors were plate with the main structure ( beam ) link, the length of anchor support should comply with the design requirements and should be less than 50 mm, will be a reliable link anchor pieces, location should meet the design requirements
組合樓板中壓型板與主體結構(梁)的連接,其錨固支承長度應符合設計要求且應小於50 ? ,端部錨固件連接應可靠,設置位置應符合設計要求。An iron shaft with claws at one end, usually thrown by a rope and used for grasping and holding, especially one for drawing and holding an enemy ship alongside
抓鉤,多爪錨一端有爪的鐵矛,通常用繩子拋出並用來抓持和固定,尤指用於沿著邊拖拽和固定敵船的那種The group also produces series of sophisticated products of stone including granite maintaining materials, bond, anchor etc
集團公司還生產花崗石石材養護、粘合劑、錨固等一系列石材領域高尖端產品。Study of the influence of anchor situation on coordination coefficient of the corroded reinforced concrete beam
梁端錨固情況對銹蝕梁協同工作系數影響研究The static load test was done on the frame beam strengthened by cfrp with frame joint anchored in different mode, and the hearing capacity, deflection and width of crack was surveyed
摘要對採用不同梁端錨固方式的碳纖維布加固框架梁進行靜載試驗研究,在承載力、撓度及裂縫開展等方面進行了綜合比較和分析。Experimental study on anchorage schemes of rc beams strengthened with gfrp sheets
玻璃纖維布加固的鋼筋混凝土梁端部錨固試驗研究The current approaches including code methods to calculate stress losses due to anchorage set exist several shortcoming, such as unsuitable to different profiles of tendons or very complicated to compute due to sectional analysis. based on classical theory of friction when tendons are stretched in post - tensioned concrete members, the unified method to calculate the stress losses in tendons due to anchorage set while considering the affection of reverse friction has been established, these formulae are suitable to be used in computer ; also approximate formulae are produced which are suitable to manual computation, they are easy to be applied in research or design
針對目前預應力鋼筋錨固時鋼筋回縮引起的預應力損失計算方法中存在的問題,建立了考慮反摩阻影響的后張法預應力混凝土橋梁錨固損失的統一計算式,適用於任意形狀的預應力鋼筋和單、雙端張拉的情形;給出了適于機算的理論公式和適于手算的近似計算式,可方便地應用於研究和工程實踐。The effect and safety of reinforced concrete column strengthened with bonded external angle steel are related with many factors, such as reinforced design, process of reinforcement, anchored structure of reinforced end, reinforcement rate of the angle steel, ductility and the stress applied on original column as well as maintenance in use
摘要採用外包角鋼加固的鋼筋混凝土柱、其加固效果和安全性與諸多因素,如加固設計、加固施工工藝、加固端錨固構造、加固角鋼的增鋼率與增箍率、原柱所處的應力狀態、使用過程中的維護管理等有關。Besides, compariative analysis was carried out on ductility and energy comsumption of the interior joints on the top story with 90 ? bent hooks, exterior joints in the intermediate stories with different detailing of longintudinal reinforcement in the columns, and the knee joints with different lap splices in the beam and the column under negative moments. seismic anchorage and lap splices schemes were presented for the longitudinal rebars in the joint core
此外重點對不同條件下中間層端節點梁筋帶90彎折錨固端的試驗結果、頂層中節點採取不同柱筋構造方案的試驗結果以及樑柱負彎矩筋採取不同搭接方案的頂層端節點的試驗結果的延性和耗能性進行了對比分析。The inferior anchor - ties is short, compared to the design request, the actual elongation value has increased 6 %, its reason is that the anchor end in to shrink the quantity had neglected locks the loss absolutely oversized, through adjusted the anchorage, this problem has solved effectively
次錨束較短,實測伸長值超過了設計要求的6 % ,其原因是忽略錨固端的內縮量;絕對鎖定損失過大,通過調整錨具,有效地解決了該問題。分享友人