錨泊地 的英文怎麼說

中文拼音 [máode]
錨泊地 英文
anchor ground
  • : 名詞(鐵制的停船設備) anchor
  • : 泊名詞(湖) lake
  1. 30 shifting from anchorage to pier / buoy no. 13

    19點30分從到13號碼頭/浮筒。
  2. The hispaniola still lay where she had anchored ; but, sure enough, there was the jolly roger - the black flag of piracy - flying from her peak

    伊斯班裊拉號仍然,但是它的桅頂上果真飄著面骷髏旗黑子的海盜旗。
  3. My next care was for some ammunition and arms ; there were two very good fowling - pieces in the great cabbin, and two pistols, these i secur d first, with some powder - horns, and a small bag of shot, and two old rusty swords ; i knew there were three barrels of powder in the ship, but knew not where our gunner had stow d them, but with much search i found them, two of them dry and good, the third had taken water, those two i got to my raft, with the arms, and now i thought my self pretty well freighted, and began to think how i should get to shore with them, having neither sail, oar, or rudder, and the least cap full of wind would have overset all my navigation

    這時,我只好用槳作,把木排一邊固定在一片靠近河岸的平坦的沙灘上,以等待潮水漲高,漫過沙灘再說。后來,潮水果然繼續上漲,漫上沙灘,等水漲得夠高了,我就把木排撐過去,因為木排吃水有一尺多深。到了那兒,我用兩支斷槳插入沙灘里,前後各一支,把木排停好,單等潮水退去,就可把木排和貨物品平安安留在岸上了。
  4. I cast my eyes to the ship, and there she rode within little more than half a mile of the shore ; for they had weighed for as soon as they were masters of her ; and the weather being fair, had brought her to an anchor just against the mouth of the little creek ; and the tide being up, the captain had brought the pinnace in near the place where i at first landed my rafts, and so landed just at my door

    我親愛的朋友,我的救命恩人, "他說, "這是你的船,它是你的,我們這些人和船上的一切也都是你的! "我看了看大船,只見它停在離岸不到半英里的方。原來,船長他們奪回了大船后,看見天氣晴朗,便起了,把船一直開到小河口上。
  5. Through example analysis, the relation between optimizing utility factor of berth and berth number of the port is set up and the reasonable utility rate of anchorage area is suggested in the paper. the results can be used in the optimizing design of the multipurpose ports

    結合實例分析,研究探討了港口位利用率和保證率的合理取值,得到了最優位利用率與位數的關系和合適的保證率,為綜合性港口的優化設計提供了參考數據。
  6. However, the roads being reckoned as good as a harbour, the anchorage good, and our ground - tackle very strong, our men were unconcerned, and not in the least apprehensive of danger, but spent the time in rest and mirth, after the manner of the sea ; but the eighth day in the morning, the wind increased, and we had all hands at work to strike our top - masts, and make every thing snug and close, that the ship might ride as easy as possible

    但這塊素來被認為是個良港,加上我們的十分牢固,船上的索轆轤纜篷等一應設備均十分結實,因此水手們對大風都滿不在乎,而且一點也不害怕,照舊按他們的生活方式休息作樂。到第八天早晨,風勢驟然增大。於是全體船員都動員起來,一起動手落下了中帆,並把船上的一切物件都安頓好,使船能頂住狂風,安然停
  7. Guangzhou port also sees to lightering operation at anchorage, with a efficiency record of 3600 ton / hour at san men island

    同時經營油船的作業,在三門島,最高可達3600噸/小時的卸率。
  8. Note : n0. 1 pilotage and quarantine anchorage and the shelter anchorage are available for vessels of less than 500 gross tonnage or those approved by the competent authority ; n0. 2 pilotage and quarantine anchorage is for all vessels ; tanker cargo - oil transferring anchorage is only for tankers carrying out oil transferring operations

    注:煙臺港第一引航檢疫和避風供500總噸以下的船舶和經主管機關批準的船舶;第二引航檢疫供各類船舶;油輪過駁限於過駁作業的油輪
  9. The heavy load ropes used in the sea, fishery and coast industries, fishing system, rescue system, offshore platform systen, the ropes for berth, anchoring, survey system for the ociasion earthquake, and cable systems

    ? ?在海洋,漁業和海岸工業中使用的重負荷繩索。海上打澇系統,救援系統,海洋石油平臺系統,停、拋、嵌入系線、海洋震勘測、海底電纜系統。
  10. The nellie, a cruising yawl, swung to her anchor without a flutter of the sails, and was at rest.

    內利號巡航艇,帆都沒有顫抖一下,就吃住了鏈,牢牢定了。
  11. The fifth chapter states, with large crude oil carriers lighting by double sides, the handling methods ( particularly in emergency ) and the safety requirements of the carrier and lighter from the beginning up to the end of the operation, and defines clearly the responsibilities of the operators and the methods how to avoid any perils during operation. the sixth chapter, in relation to the risks within large crude oil carriers lighting by double sides, makes the corresponding emergency schemes as to fire, oil leakage, and so on

    本章主要闡述了在滿足大型油輪雙舷過駁作業條件下,一程船和二程船的靠離操作方案和有關安全要求,同時詳細闡明了一程船和二程船在雙舷過駁作業的開始、期間、結束和緊急情況下的優化操作方案,明確了雙方作業人員的職責和防止過駁作業中易發海損事故的有效措施。
  12. The fourth chapter states, when large crude oil carriers lighting by double sides, the requirements on the equipments and mainly the technical criteria and the operational procedures of the equipments such as hose, fence, communication, which are explained with drawings

    本章主要闡述了確保大型油輪雙舷過駁作業安全有關設備配備的技術標準和操作要求,重點闡明了軟管( hose ) 、碰墊、通訊、監護船、靠離等關鍵設備的配置要求武漢理工大學碩士學位論文和操作程序,並輔以圖片加以說明。
  13. A man needed to have an anchor in the safe world. a man needed a wife

    男子需要扶持和安慰,需要一個鐵把他碇在安全下,需要一個妻子。
  14. Guangzhou port group possesses 50 berths, 13 buoys and 23 anchorages each of 10, 000 tonnage - class and the largest capacity to be 300, 000 tons

    廣州港集團現有萬噸級以上位50個;萬噸級以上裝卸作業浮筒13個;萬噸級裝卸23個(其中最大能力30萬噸) 。
  15. Guangzhou port group possesses 46 berths, 13 buoys and 23 anchorages each of 10, 000 tonnage - class and the largest capacity to be 300, 000 tons

    廣州港集團現有萬噸級以上位46個;萬噸級以上裝卸作業浮筒13個;萬噸級裝卸23個(其中最大能力30萬噸) 。
  16. At south - west, for seven or eight days, during which time a great many ships from newcastle came into the same roads, as the common harbour where the ships might wait for a wind for the river

    在此期間,許多從紐卡斯爾來的船隻也都到這一開放,因為這兒是海上來往必經的港口,船隻都在這兒等候順風,駛入耶爾河。
分享友人