錨跨 的英文怎麼說

中文拼音 [máokuà]
錨跨 英文
anchor span
  • : 名詞(鐵制的停船設備) anchor
  • : 動詞1 (抬起一隻腳向前或向左右邁) step; stride 2 (兩腿分在物體的兩邊坐著或立著) bestride; stra...
  1. As a new special bridge type, self - anchored suspension bridge has won more and more engineering ’ s favors with its beauteous build, economy performance and striving adaptability of geology and topography feathers. it has become a very competitive blue print of the urban bridge with the span from 100m to 400m

    式懸索橋作為一種特殊的橋型,以其結構造型美觀、經濟性能較好、對地形和地質狀況適應性強等優點,越來越受到工程界的青睞,成為城市裡100 - 400m徑范圍內極具競爭力的橋梁方案。
  2. Based on the conceptual considerations and structural design of pingsheng bridge in foshan, the first single tower and single span hybrid girder self - anchored suspension bridge in the world, the original technical achievements of the bridge, such as those of the integral bridge tower and separated stiffening girders, the stiffening hybrid girders, structural types of steel - concrete girder joint parts, steel box girder incremental launching and hanger adjustment, are presented and the key and innovative techniques for the self - anchored suspension bridge are described in a summarized account as well

    摘要通過世界上首座獨塔單混合梁自式懸索橋佛山平勝大橋的方案構思及結構設計,介紹了其採用的整體橋塔分離式加勁梁橋型結構、混合加勁梁、鋼混凝土結合段構造型式、鋼箱梁頂推技術、吊索調索技術等原創性工程技術成果,綜述了自式懸索橋設計的關鍵和創新技術。
  3. Combined with the real example of monitoring pressure on the supporting system in the long span underground space of dk7 + 692 section at jiao - xin line of chongqing light railway, it is set forth the methods about choosing the support system and its parameter, digging methods of underground space, measuring and testing methods for the stress of the support system ; the testing results and variation pattern were analyzed for the stress of the initial supporting i - steel axial stress of bolt, stress of shot - concrete, supporting pressure of temporary i - steel and stress of steel of the second lining, then, the reason for deformation of the support system induced by sharp increase of i - steel was determined

    摘要結合重慶市輕軌較新線大坪車站大度地下空間dk7 + 692斷面施工支護體應力監測的工程實例,闡述了該大度地下空間支護結構的參數選擇、地下空間的開挖方法、支護體結構的應力量測方法及測試手段;分析了支護體初期支護工字鋼拱應力、桿軸力、噴射混凝土內應力、臨時工字鋼支撐應力、二次襯砌鋼筋應力等測試結果和變化規律;確定了工字鋼拱應力急劇增大而可能引起支護體系失穩的原因。
  4. Based on the research of influenced parameters on constant and varying depth solid web box girder before, the shear lag aroused by the parameters including width - span ratio, outstanding flange on base slab and the position of the tendons are further studied. the investigation show that shear lag values diminish along with the decease of width - span ratio and the departure from the symmetrical axis of anchor position, but outstanding flange is contrary to the former

    在前人對等截面、變截面實腹箱梁剪力滯效應影響參數研究的基礎上,本文進一步對腹板開孔的連續箱梁的寬比、底板翼緣伸出以及預應力固位置改變等參數對箱梁剪力滯的影響進行研究。
  5. It shows that the method suggested in the paper is simple, applicable for engineering and has good precision. on the bases of the formulas deduced, and combining with relative test datas, it studies in the paper several factors influencing the bearing performance of the simple beams, such as shape of the external tendons, the equal moment segment length, span - to - depth ratio of the beam, valid initial prestress of the external tendons, area of the internal tension reinforcement, strength of the concrete, vertical distance between

    在公式推導的基礎上,結合相關試驗資料,研究了體外筋的形狀、等彎矩區長度、梁高比、有效張拉預應力、體內受拉筋配筋率、混凝土強度、固點到樑上邊緣在垂直方向上的距離、體外預應力筋水平段長度(雙折線型體外筋的情況)以及荷載類型等對體外預應力混凝土簡支梁受力性能的影響。
  6. This paper also presents the methods of controlling unstressed length of cable, pre - displacement of saddle, anchor span tension, erection of wire strands, the fixed position for erecting cable band and cable length. determination and control approach of displacement of saddles during cable erection are also introduced. at the same time, the change course of linetype during construction period for suspension bridge is analyzed

    再次,介紹了懸索橋的施工控制內容與方法,利用軟體sgkz2000對多座懸索橋進行了施工計算,提出本文關于懸索橋的主纜無應力長度控制、索鞍預偏量控制、錨跨張力控制、絲股架設控制、索夾安裝位置與吊索長度控制的方法;介紹了吊梁階段鞍座頂推量的確定與控制方法,分析了施工階段懸索橋的線形變化過程。
  7. The force control of suspension bridge anchorage cable is the main contents which will be researched. according to the character of suspen - sion bridge anchorage, three questions is solved in this paper on the basis of the construction control experience of the highway bridge of yichang yanzhi river. firstly, an effective method of cable force control is presented in this paper, which has settled the puzzle of cable force accurate operate through fixing a pressure transducer at the behind of the hydraulic jack. secondly, an exactitude calculation model is founded in this paper. in addition the influence of boundary condition, sag, inclination, flexural rigidity and environment temperature to the cable vibration frequency which make the frequency method could be used to the measurement of cable force. in the end of this paper, a control system of anchorage cable force is developed on the basis of the above research. this system is very steady, credible, high precision and convenient. it is a new and credible method to be used to the force control of sus - pension bridge anchorage cable. in this paper, the conundrum of cable force control has been solved. the fruits are very useful to the development of inland suspension bridge

    提出了一種有效可行的錨跨張力控制方法,即通過在油壓千斤頂后加壓力傳感器,並利用單片機技術進行數據採集,解決了懸索橋錨跨索股初張力精確控制的難題;建立了錨跨索股索力的精確計算模型,分析了索股的邊界條件、斜度、垂度、抗彎剛度及環境溫度對索股頻率的影響,解決了弦振法在大徑懸索橋索力測試中的應用問題;在上述研究成果的基礎上,研製出了錨跨張力控制系統,該系統具有穩定可靠,精度高,使用方便等特點,它的投入使用將為我國今後大徑懸索橋錨跨張力控制提供一種全新的、可靠的手段。
  8. The nancha suspending - gay bridge of the changjiang road - bridge in jiangshu runyang, with a main span of 1490m, ranks first in china, third in the world. the north rivets, only 250m from the main stream of changjiang, have a tight liaison with the waterpower of it. especially, in this area, the face of rocks undulates a lot and exist fault - fabric. the soil there has apparent difference with the trend of water. the base - hole of north rivets can be named a super - deep one, with a 60m length, 50m widths, and 48m depths. the fence of the base takes advantages of the rectangular underground continuous wall structure and succeeds

    江蘇潤揚長江公路大橋南汊懸索橋,主1490m ,居中國第一,世界第三。該橋的北碇距長江幹流僅250m ,與長江水力聯系密切,碇區水文、地質情況復雜,表層淤泥質土及松軟粘土層較厚,基巖頂面起伏較大,且存在斷裂構造,土層具明顯的流變特性。北碇基坑為長60m 、寬50m 、深48m的矩形超深基坑,其基礎圍護在國內首次採用矩形地下連續墻結構,並獲得成功。
  9. Regarding the rc beams subjected to concentrated load or even load and braced by bonding steel, an analysis is made on the relevant factors influencing maximum anchorage shear stress of steel sheet. the analysis is based on elastic theory and makes use of the formula for calculating anchorage shear stress of steel sheet. as indicated by the results, the maximum anchorage shear stress not only realtes to such parameters as height of cross section of rc beam and span but also relates to the thickness of adhesive layer, elastic modulus, thickness of steel sheet, and length of steel sheet. the present method will check maximum an chorage shear stress on the end of shear sheet so as to prevent rc beam from local damage. the present results will offer important reference for our country to further perfect bracing design by bonding steel method

    在彈性理論的基礎上,利用鋼板固剪應力計算公式,對在集中荷載或均布荷載作用下採用粘鋼加固的混凝土梁,分析鋼板固最大剪應力的有關影響因數.結果表明,最大固剪應力不但和混凝土梁的截面高度、度等參數有關,還和粘膠層厚度、彈性模量、鋼板厚度及鋼板長度有關.採用文中方法可以對鋼板端部最大固剪應力進行驗算,防止混凝土梁出現局部受拉破壞.研究結果為進一步完善我國粘鋼法加固設計提供重要的參考資料
  10. Flutter stability of long span self - anchored suspension bridges and wind - tunnel tests

    度自式懸索橋的顫振穩定性研究及風洞實驗
  11. Abstract : the structural characteristics of a three - span continuous half - through, self - anchored, concrete - filled steel - tube arch bridge are introduced

    文摘:介紹了三連續自中承式鋼管混凝土拱橋特點,闡述了橋型布置原則及主要結構尺寸的擬定。
  12. In recent years, many long - span self - anchored suspension bridges have been constructed because this type of structure has lots of merits such as graceful appearance, new type of structure and convenience in choosing bridge location

    近年來,自式懸索橋以其優美的線型、新穎的外觀以及選址靈活等特點而越來越受到青睞,一大批大度自式懸索橋也就應運而生。
  13. The construction control of tensioning of anchor span strand for erecting suspensio bridges

    張拉錨跨絲股法架設懸索橋及其施工控制
  14. Stress analysis of fushun wanxin bridge ' s anchor span

    撫順萬新大橋應力分析
  15. This thesis aims to analyze how to select and assign prestressed tendon, how to design anchorage bearing joint, how to control the crack, how to calculate the axial prestressed force and the third moment and how to design the edge column of top layer. on the base of the research in and out our country and construction of the prestressed structure, some helpful conclusion and suggestion are presented, which is suggestive for the design and construction of long span continuous prestressed concrete frame

    本文將綜合設計與施工兩個方面,對預應力筋的選用、布置,固區的設計及構造處理,裂縫問題,側向約束對梁軸向預壓應力及柱中第三彎矩的影響,頂層大邊柱設計等幾個問題進行系統的分析研究,並在國內外研究和大量工程實踐的基礎上,提出了一些建議和預防措施,對此類工程設計和施工有一定的參考價值。
  16. For example, the large friction loss of prestressed tendons, complex anchorage bearing joint, the problem of cracks in large area structure, axial compress of long span continuous beam under prestress. all those hinder its use in long span structure. until now days, the cognition about the behavior of such structure under loads is not enough for the realm of prestressed concrete of all the world

    但是,預應力技術應用於大連續框架結構,在設計和施工中還存在一些缺點和不足,例如預應力筋的摩擦損失過大,節點固區設計和構造復雜、大面積結構的裂縫控制問題、大框架梁在預應力作用下的軸向縮短等,這些都是困擾大預應力混凝土框架結構應用的突出問題,特別是目前對于預應力混凝土超靜定結構的受力性能,國內外預應力界的認識尚不夠全面。
  17. With the designing and building of yichang yangtse river highway bridge, a single - span suspension bridge with main span of 960m, some technical problems such as the layout of structural system of the suspension bridge, the type of cross section of stiffening steel box girder, the structural system of the anchor and the cracking - resistant techniques of the bulky concrete anchor have been studied in the present thesis. some valuable conclusions have been achieved that provided a substantial support for the successful completion of the bridge. the thesis contains five chapters

    本文以湖北宜昌長江公路大橋(主為960m的單懸索橋)的設計與施工為背景,對大懸索橋設計與施工中的若干問題如懸索橋結構的合理布置、加勁鋼箱梁斷面型式的合理選取、碇結構的合理確定以及碇大體積混凝土設計與施工的綜合防裂技術等進行了研究,取得了一批富於實用價值的研究成果,為宜昌長江公路大橋的順利建成提供了卓有成效的技術支持。
  18. Bolting with mesh in large span open - off cut in fully mechanized top - caving face

    度綜放面開切眼網支護
  19. The product is a mainly used as auxiliary reinforcing strand for concrete structure. e. g. long spanned bridges on railway and highway. overhead crane beam, rock and earth anchoring construction, muti - floor industrial building etc

    該產品主要作為混凝土結構配筋用,如大度鐵路和公路的橋梁、吊車梁、巖土固工程,多層工業廠房等。
  20. The product is mainly used as auxiliary reinforeing strand for concrete structure. e. g long spanned bridge s on railway and highway, overhead crane beam, rock and earth anchoring construction muiti - floor industrial building and etc

    該產品主要作預應力混凝土結構配筋用,如大度鐵路和公路的橋梁、吊車梁、巖土固工程,多層工業廠房等。
分享友人