長坑路 的英文怎麼說

中文拼音 [zhǎngkēng]
長坑路 英文
cheung hang road
  • : 長Ⅰ形容詞1 (年紀較大) older; elder; senior 2 (排行最大) eldest; oldest Ⅱ名詞(領導人) chief;...
  • : 1 (道路) road; way; path 2 (路程) journey; distance 3 (途徑; 門路) way; means 4 (條理) se...
  1. The course is also known for its famous bunkers, for example, hell on the long 14th, strath on the short 11th and the road bunker at what is probably the most famous golf hole in the world, the 17th or road hole so called because a road - which is in play - runs hard against the back edge of the green

    這一球場還以著名的沙而聞名,例如在的14洞上的「地府」 11洞上的「平底河谷」以及世界上最著名的高爾夫球洞,第十七洞又叫洞上的「」 。
  2. Mass transit railway, airport railway and super highway network all run through the district, providing people with convenient means to travel around the territory. as far as existing facilities are concerned, there are 2 hospitals, 1 university ( the city university of hong kong ), 80 schools, 3 community halls ( lai kok, pak tin, shek kip mei ) and 4 community centres ( cheung sha wan, tai hang tung, nam cheong district, lai chi kok )

    但本區的交通十分發達,貫穿本區的地鐵、機鐵和超級公,令往返本區和港九、新界各區十分便捷。另一方面,區內有兩所醫院、一所大學(香港城市大學) 、 80間學校、 3間社區會堂(麗閣、白田、石硤尾)及4間社區中心(沙灣、大東、南昌、荔枝角) 。
  3. The nancha suspending - gay bridge of the changjiang road - bridge in jiangshu runyang, with a main span of 1490m, ranks first in china, third in the world. the north rivets, only 250m from the main stream of changjiang, have a tight liaison with the waterpower of it. especially, in this area, the face of rocks undulates a lot and exist fault - fabric. the soil there has apparent difference with the trend of water. the base - hole of north rivets can be named a super - deep one, with a 60m length, 50m widths, and 48m depths. the fence of the base takes advantages of the rectangular underground continuous wall structure and succeeds

    江蘇潤揚江公大橋南汊懸索橋,主跨1490m ,居中國第一,世界第三。該橋的北錨碇距江幹流僅250m ,與江水力聯系密切,錨碇區水文、地質情況復雜,表層淤泥質土及松軟粘土層較厚,基巖頂面起伏較大,且存在斷裂構造,土層具明顯的流變特性。北錨碇基60m 、寬50m 、深48m的矩形超深基,其基礎圍護在國內首次採用矩形地下連續墻結構,並獲得成功。
  4. In west kowloon, good progress has been made on the stage i and ii drainage improvement works which are scheduled for completion in 2003 and substantial completion in 2004, respectively. in order to minimise the extent of road openings caused by the extensive drainage improvement works, construction of an underground flood storage tank

    為了盡量減少在西九龍區因進行排水改善工程而須掘的范圍,渠務署於二零零一年年初在大東游樂場地底興建容量達十萬立方米的蓄洪池,以及在九龍塘興建一條1
  5. This is also the signature hole with a blind drive over hotel grounds followed by a very long second shot to an extremely narrow green with the road hard against the back edge and the fearsome road bunker front left

    這也是一個簽名洞。先是一次近乎盲目的擊球,之後是一個擊球,抵達一個非常狹窄的果嶺,床緊貼在後邊,可怕的就在左前方。
  6. Under the trial scheme, about 30 signages have been put up at shelters, barbeque and picnic sites at the kam shan country park, and at roadsides of eagle s nest nature trail, lung yan road, cheung yuen road and cheung hang road

    在這項試驗計劃下,警方分別在金山郊野公園的避雨亭、燒烤和郊遊場地,以及鷹巢山自然教育徑、龍欣道、長坑路邊共設置約三十個資訊牌。
  7. Through an example of dewatering engineering at international stock exchange hotel in wuhan, calculating with program, and ensuring foundation pit draw down, the optimum unit value of depth of filter tube and stop water heavy curtain to make water drawdown minimum was got, and put forward a sort of method of thinking in optimizing design of foundation pit dewatering

    通過國際證券大廈降水工程實例,利用程序進行計算,在保證基降深的前提下,找出水頭降最低的止水帷幕的深度和濾水管度的最佳組合值,為深基降水優化設計提供了一種思
  8. Serving the community of ma on shan, ma on shan ( mos ) rail provides reliable and convenient rail services between ma on shan and tai wai. it runs over a length of 11. 4km and comprises 9 stations, including tai wai, che kung temple, sha tin wai, city one, shek mun, tai shui hang, heng on, ma on shan and wu kai sha

    馬鐵主要為馬鞍山至大圍區內的居民提供便捷的鐵服務,全11 . 4公里,共設有九個車站,包括大圍、車公廟、沙田圍、第一城、石門、大水、恆安、馬鞍山及烏溪沙。馬鐵車站靠近大型屋苑,方便市民于短時間內徒步至車站。
  9. The dewater calculation result of the south anchor of runyang yangtze river highway bridge ' s shows that the double deck structure model provide a new method to the non linear coupling calculation of deep foundation pit dewater and settlement, forecast and control the distortion of the soil in the pit, engineering construction and design

    潤揚江公大橋南錨基工程降水計算表明,雙層結構模型為深基降水與沉降的非線性耦合計算,基土體變形預測、控制,工程施工和設計提供了新的計算分析途經。
分享友人