間接性故障 的英文怎麼說

中文拼音 [jiānjiēxìngzhàng]
間接性故障 英文
intermittent failure
  • : 間Ⅰ名詞1 (中間) between; among 2 (一定的空間或時間里) with a definite time or space 3 (一間...
  • : Ⅰ動詞1 (靠近;接觸) come into contact with; come close to 2 (連接; 使連接) connect; join; put ...
  • : Ⅰ名詞1 (性格) nature; character; disposition 2 (性能; 性質) property; quality 3 (性別) sex ...
  • : Ⅰ名詞1 (事故) event; incident; happening; accident 2 (原因) cause; reason 3 (朋友; 友情) fr...
  • : Ⅰ動詞(阻隔; 遮擋) block; hinder; obstruct Ⅱ名詞(遮擋物) barrier; block; obstacle
  • 間接 : indirect; secondhand
  • 故障 : hitch; breakdown; stoppage; fault; faulting; accident; blunder; bug; conk; failure; impairment; i...
  1. Based on the analysis of the magnetic characteristics, an artificial nerural network can be built and the fault samples can be gained by theoretical arithmetic. the results of computation example show that the method can not only judge if shorted field turns exit but also estimate fault turns ratio

    根據該結論構建了發電機診斷的神經網路,並直獲得發電機在額定運行工況下對應的樣本,用於診斷,不僅對轉子繞組匝短路的存在,還對的嚴重做出了正確的判斷。
  2. The second class cable ? suitable for more the earthing ? block time and more better insulated performa

    第二類? ?用於更長的系統及對電纜絕緣能要求較高的場合。
  3. It is used to provide reference to operator of power plant. in recurrent composed bp networks, the relation of interior node is enhanced because the link weight of input layer and output layer are added, and the saturation of fault prediction is avoided by using the linear prompting function

    本文所建的用於鍋爐預測的遞推合成bp網路由於bp網路各層之及輸入層與輸出層之的連權的增加和線激勵函數的採用,極大地加強了內部節點的關聯能力,避免了bp網路預測的飽和的出現。
  4. With the increase of machinery operating speed and wide application of various new - style material in high - speed machinery, nonlinear problem of mechanical system which may cause abnormal state even fault directly or indirectly becomes more and more obvious

    隨著機械運轉速度的日益提高以及各種新型材料在高速機械中的廣泛應用,機械繫統的非線將更加突出,可能直(或)導致機械繫統的
  5. Without prejudice to any other provision of these conditions, to the extent permitted by applicable law, the customer shall not assert and waives any claim, including, without limitation, any claim arising against the bank on any theory of liability for special, indirect, consequential or punitive damages as opposed to direct or actual damages arising out of or in connection with these conditions, all agreements and transactions to which these conditions apply or are made subject to and the relationship between the bank and the customer at all times and for any damages whatsoever caused by or arising from, directly or indirectly, the error, failure, negligence, act or omission of any other person, system, institution or payment infrastructure

    在不影響此等條件內任何條文的原則下,並於適用法律容許的范圍內,客戶不得提出並且放棄任何申索,包括但不限於就下列事項所引起對銀行的任何申索: i由於此等條件一切適用或受制於此等條件的協議和交易,以及在任何時銀行與客戶之的關系所產生或因與此有關連而引起對任何特別相應或懲罰的損害賠償與直或實際損害賠償成對比的法律責任的任何理論,及ii因任何其他人士系統機構或付款架構的直錯誤失敗疏忽作為或不作為所引起或導致的任何損害的申索。
  6. First through poor quality analysis, conclude that it is necessary to strengthen quality inspection and quality control so as to reduce internal and external failure cost ; second through sorting and analysis of all non - conformance records happened before quality sustainable improve approach, make us understand it is crucial to strengthen quality sense, enhance bottom management and improve process capacity ; third through analysis of previous year compound quality level before quality sustainable improve approach, point out the compound quality level gap between byq tank shop and counterpart, make us feel quality crisis ; last in connection with byq company production volume development target, conclude it is inevitable for byq company to select the development pattern of reducing cycle time and improve output

    首先是運用質量成本分析法指出油箱車加強質量檢查和質量控制以減少內部和外部成本的必要;其次是將油箱車質量持續改進前一年所發生的所有產品不合格記錄進行了整理分析,使我們看到增強質量意識、加強基礎管理和提高工藝能力的迫切下來計算分析了油箱車質量持續改進前一年的綜合質量水平,找出了油箱車與同行業者的質量水平差距以及與世界級製造商們的差距,使我們意識到質量危機感;最後針對整個byq公司以後的生產量發展目標,指出減少過程周期時或增加過程產出是byq公司發展的必然選擇。
  7. According to zero sequence voltage distribution from system zero sequence impedance to shunt reactor zero sequence in zero sequence circuit, the zero sequence voltage at the terminal of shunt reactor and the zero sequence compensating voltage at neutral are compared in the scheme

    即根據零序網路中零序電壓在系統零序阻抗和電抗器零序阻抗上的分佈情況,通過直比較電抗器首端零序電壓與補償到電抗器末端中點的零序補償電壓的幅值大小,來判別電抗器匝
  8. In the 3 ~ 35kv power supply system of our country, the large part is the not solidly earthed neutral system. when the single - phase earthed phenomena happens in this system, this electric power network can run with failure. and in this way the operated cost can reduce greadty. and at the same time the power supply systemic dependability can be improved. but when the single - phase earthed current is large, this electric power system can engender easily arc earthed overvoltage and interphase short circuit by this means

    在我國10 35kv供電系統中,主要為中點非直地系統,這種系統在發生單相地時,電網仍可帶運行,這樣可以大大降低運行成本,提高供電系統的可靠,但這種供電方式在單相地電容電流較大時容易產生弧光地過電壓和相短路,給供電設備造成了極大的危害。
  9. Function : power input : standard 220vac, 50hz ; power output : no load 12. 4 - 13. 63vdc, with load dc12v 13v standard current output : 10a moment current output : 10a control electric locks or bolts directly, reduce the load of access controller save project lines lower potential trouble have output nc no, control all kinds of electric locks has delay control circuit, unlock delay in 0 - 10s use exit button, press to 0pen the electric lock directly auto self - protection function : when short circle and other unexpected situation happen, the power supply can melt the fuse to protect itself

    功能特:交流輸入:標準ac220v 50hz直流輸出:空載輸出dc12 . 4v 13 . 63v負載輸出dc12v 13v標準輸出電流10a瞬輸出電流10a直控制電鎖:可減小門禁控制器的負荷,節省工程布線,減少隱患。設nc no輸出,可控制各種類型的電鎖。設延時控制電路,開鎖時可在0 10秒。
  10. Function : power input : standard 220vac, 50hz ; power output : no load 12. 4 - 13. 63vdc, with load dc12v 13v standard current output : 2. 5a moment current output : 2. 5a control electric locks or bolts directly, reduce the load of access controller save project lines lower potential trouble have output nc no, control all kinds of electric locks has delay control circuit, unlock delay in 0 - 10s use exit button, press to 0pen the electric lock directly auto self - protection function : when short circle and other unexpected situation happen, the power supply can melt the fuse to protect itself

    功能特:交流輸入:標準ac220v 50hz直流輸出:空載輸出dc12 . 4v 13 . 63v負載輸出dc12v 13v標準輸出電流2 . 5a瞬輸出電流2 . 5a直控制電鎖:可減小門禁控制器的負荷,節省工程布線,減少隱患。設nc no輸出,可控制各種類型的電鎖。設延時控制電路,開鎖時可在0 10秒。
  11. Function : power input : standard 220vac, 50hz ; power output : no load 12. 4 - 13. 63vdc, with load dc12v 13v standard current output : 5a moment current output : 5a control electric locks or bolts directly, reduce the load of access controller save project lines lower potential trouble have output nc no, control all kinds of electric locks has delay control circuit, unlock delay in 0 - 10s use exit button, press to 0pen the electric lock directly auto self - protection function : when short circle and other unexpected situation happen, the power supply can melt the fuse to protect itself

    功能特:交流輸入:標準ac220v 50hz直流輸出:空載輸出dc12 . 4v 13 . 63v負載輸出dc12v 13v標準輸出電流5a瞬輸出電流5a直控制電鎖:可減小門禁控制器的負荷,節省工程布線,減少隱患。設nc no輸出,可控制各種類型的電鎖。設延時控制電路,開鎖時可在0 10秒。
  12. In recent years, with the large - scale reconstruction of city power system, the scale of power system is continuously expanding, and the power supply network is becoming larger and larger. in addition, the enormous use of cables in city power system increases the current through the grounded capacitor. these lead to more and more instantaneously grounding faults unable to eliminate naturally

    近年來,國家對城市電網的大規模改造,使得電網的規模不斷發展,配電網路越來越大,加上城網中大量使用電纜,使地電容電流大大增加,越來越多的瞬單相不能自動消除,為了解決這一問題,我國普遍採用中點經消弧線圈地的補償方式。
  13. Such integrity can materially reduce the cost and space occupancy of the equipment and eliminate the large amount of cable connection between the equipment and faults that cable connection may cause

    這種綜合可大大降低設備成本,節約佔地面積,消除設備大量的電纜連及由此引起的
  14. To reduce materially the cost and space occupancy of the equipment and eliminate the large amount of cable connection between the equipment and faults that cable connection causes

    由於其集成,較傳統設備的組網,可大大降低設備成本,節約佔地面積,並可消除設備大量的電纜連及由此引起的
  15. This paper has proposed one new way of thought of differentiating the fault type. after observing the physical course of the single - phase grounding of transmission line, analyzing by the wavelet transformation the transient signals sampled during the fault period from the moment that single - phased grounding occurs to the moment that line breakers work, we can distinguish temporary fault from permanent one through the wave form

    本文提出了一種不同於現有類型判別的思路,通過考察線路單相的物理過程,利用小波變換理論分析處理線路單相瞬時和永久發生后斷路器開斷前時段的暫態信號,通過波形識別區分兩種
  16. The method that the traditional system integration method applies will result in disorder and unsystematic data flow style in the function subsystem, so data quality of service is difficult to be sure ; also the following shortcomings such as single node failure and data communication bottleneck are very easy to lead to normal data communication among subsystems failure, in the same time the reliability of integration system ca n ' t be confirmed

    這種考慮問題方式帶來的直後果是:首先系統中的數據類型雜亂無章,無法滿足功能子系統對數據服務質量的要求;其次單節點網關不能有效解決單一點及通訊信息瓶頸等問題,使集成子系統之正常的數據通訊受到威脅,集成系統正常工作的可靠無法得到保
分享友人