閘底 的英文怎麼說

中文拼音 [zháde]
閘底 英文
pocket floor
  • : anchor gate
  • : 底助詞(用在定語后, 表示定語和中心詞之間是領屬關系, 現在多寫作「的」)
  1. 1st knife switch foundation channel steel model and aperture distance

    1刀閘底座槽鋼的型號及開口距離
  2. Improvement on the structure of bearing device for the miter gate and its selective material

    人字樞結構改進及材料選用
  3. Design of hydraulic hoists for eccentric trunnion sector gates of xiaolangdi project

    小浪水利樞紐偏心鉸弧形門液壓啟閉機設計
  4. In many low head hydraulic structure, expecially canal system structure, we are used a dopting underflow energy dissipation

    在眾多的低水頭水工建築物中,特別是渠系建築物中的涵下游,多採用流消能。
  5. The phenomenon of crack that appears in the hydraulic culvert and sluice is explained separately. the rule is concluded. the mechanism that forms the crack is studied

    對水工涵工程墩墻和板混凝土的裂縫現象分別進行了闡述,總結其規律,分析其成因,並研究其開裂機理,為採取相應的工程防裂措施提供理論依據。
  6. Offers valves, fittings, tubing, reactors, intensifiers, gas boosters, pressure vessels and pumping systems for elevated pressure applications

    -生產楔式閥,平板閥,球閥,截止閥,止回閥,閥,旋塞閥,蝶閥等各種類型。
  7. Based on the research of several shiplocks, the temperature and stress field of the lock floor is simulated under temperature and gravity loads, where the shiplock floor is built on different foundations, the effect of setting up wide construction joints is analyzed by the nonlinear finite element method

    作者通過對多個船工程的研究,結合非線性有限元模擬分析方法,考慮重力、溫度等荷載,計算分析土基和巖基上船結構板預留寬縫施工方法的效果。
  8. Gate guides and lugs. 180 guiding for the moving gate, while jambs at the bottom hold the knife gate to assure proper seating

    板導桿和凸耳。當部側板為了保證提供恰當閥座時而夾住刀時, 180導桿用於板的移動。
  9. Instantly murchison pressed with his finger the key of the electric battery, completed the circuit, and released the spark into the breach of the columbiad.

    莫奇生突然用手指撳下電,接通電流,把電火送到了哥倫比亞炮炮
  10. Transportation and handling of liquefied gases. tanker vehicules filled and emptied from below. internal safety gates dn 80 and dn 100 for operating pressures between 4 bar and 40 bar

    液態氣體的運輸和裝卸.部注入和排出的罐車.工作壓力范圍為4巴- 40巴用標準尺寸dn 80和dn 100的內部安全
  11. Finite element analysis on bottom plate structure of amalgamated shiplock

    圬式船閘底板結構有限元分析
  12. Structure improvement of the burning bottom layer fan gate

    燒結布料鋪料扇形門裝置結構改進
  13. Abstract : a brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    文摘:介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。
  14. A brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。
  15. Underground headstock gear and later construction of preset double joint were implemented, which achieved satisfactory results, and thus may serve as a reference for lock design under similar conditions

    該船首採用地下式啟閉機房和板預留寬縫後期施工,且在施工過程進行了計算機模擬模擬研究,所有這些方面均取得了較好的效果,可供具有類似條件的船設計時參考。
  16. Study on the filling amp; amp; emptying system of three - branched culvert in shiplock bottom

    閘底三支廊道頂縫出水輸水系統研究
  17. After excavation, there are concentration phenomenon of stress at the corner or the shiplock room, and the tension zone lies in half of the middle part as well as the part of the two slopes to the lower part of the upright wall. finally the analysis results are compared with site monitoring data in period of construction as well as the feedback reports, the result of all comes to meet with each other very well

    開挖完成後,在室拐角處存在不同程度的應力集中現象,中隔墩上部1 2的巖體及南北邊坡至直立墻頂部平臺以下的部分巖體為拉應力區。在兩側邊坡及邊墻的塑性區出現在損傷區和部分卸荷影響區內,中隔墩大部分區域的巖體都進入了塑性狀態,板處的塑性區基本上與損傷區一致。
  18. Shankou spillway project has many specific characteristics, for example, the gate frusta and weir body have equivalent thickness, the weir body is low and have corridor, the foundation of the weir body is " high - low foot " " and the side frusta is also used as retain wall. in view of the characteristics, to better analyze the stress distribution on weir body, gate frusta, the joints between gate chamber and weir body, under the condition that the gate chamber is applied with asymmetrical loads and complicated constraints, three dimensional finite element method is applied in this paper

    本文針對山口溢洪道墩與堰體板厚度相當,堰體為低堰且設有廊道、堰體建基面「高低腳」及邊墩兼作擋土墻等具體特點,在室設計中采山口水利樞紐工程溢洪道室三維有限元整體應力計算分析用三維有限元整體應力計算方法分析室的受力狀態,分析室在荷載不對稱。
  19. Widely applied in lock heads and the lock chambers, the floor of castle structure is cracked easily

    摘要塢式結構是船首或室常採用的一種型式,但採用這種結構形式的船閘底板容易出現裂縫。
  20. At last the corresponding formulae was yielded. 4. the design scheme of jiangtang lake flood - intake sluice was systematically researched, including selecting the sluice location, calculating the height of the sluice soleplate, selecting of the sluice structure and bank wall, and then the reliable proof for determining rational structure scheme was provided

    4從址選擇、閘底板高程確定、室結構和岸墻等方面,對姜唐湖進洪工程的設計方案進行了系統的研究,為最終確定較為合理的結構方案提供了可靠依據。
分享友人