防坡堤 的英文怎麼說

中文拼音 [fáng]
防坡堤 英文
sea bank
  • : Ⅰ動詞(防鷥) provide against; defend against; guard against Ⅱ名詞1 (防守; 防禦) defence 2 (堤...
  • : Ⅰ名詞(地面傾斜的地方) slope Ⅱ形容詞(傾斜) sloping; slanting
  • : 堤形容詞[書面語] (水清見底的樣子) (of water) clear
  1. Their biggest concerns are preventing seepage under or through the embankment, stabilizing the slopes, and overbuilding to counteract settling, which can be up to 5 percent for soils compacted during construction and 15 percent for uncompacted material

    工程師最注意的幾點包括底部或內部出現滲流、穩定邊,以及超量建造以止沉降,也就是在建造時增加5 %壓實土壤和15 %未壓實物料。
  2. As a practical application, the safety situation of jiujiang dike under the 1998 pluvial condition of once a hundred years in yangtze river has been evaluated by the reliability method from the point view of the seepage stability in terms of probability analysis and two dimensional saturated seepage finite element analysis combining with the mechanism of seepage burst in jiujiang dike summarized in the thesis

    通過滲流有限元和滲流可靠性分析論證了1998長江流域特大洪水災害中九江市護大發生的嚴重潰口破壞的滲流破壞機理。分析、比較得出結論:下游腳的出逸比降接近和超過臨界比降,在1998年長江百年一遇的洪水條件下九江大潰口斷面的抗滲可靠性僅在55左右的非常低水平。
  3. Our “ sun shine ” brand carbon steel fiber have been widely used in road, protection slops of highway, bridges, reservoir dyke, tunnels, airport taxiways, well lids of city project ( guard against theft ), mine laneway, port, railway sleepers and etc, and gain high praise from clients

    本公司「雙興」牌碳鋼纖維廣泛應用於道路,公路護、橋梁、、水庫壩、隧道、機場跑道、市政工程井蓋(盜) 、礦井巷道、港口、鐵路軌道等方面,深受廣大用戶贊譽。
  4. Landslide analysis of dike outer slope and corresponding processing measures

    外滑的原因分析及處理措施
  5. Application of interlocking concrete slab in nenjiang dike slope protection

    混凝土聯鎖板塊在嫩江工程中的應用
  6. Pitched slope breakwater

    砌石護
  7. Application of dry stone pitching revetment with pointing joint by sluicing sand in levee

    淺談干砌石沖砂勾縫護工程中的應用
  8. Protection : it can prevent riverbank from strong wind and heavy rain. besides, it can protect dam and the bottom of river and prevent the loss of sand

    護作用:巖受風,浪,雨的沖刷,並可用於護岸,護,護底,止水土流失。
  9. Wave screens are often constructed on the top of sloping wave protection constructions such as seawall, revetments, etc. to meet the requirements of overtopping and stability and cut down engineering cost

    摘要在海、護岸等斜浪建築物中,為滿足越浪與穩定要求,減少工程投資,通常在頂設置浪墻。
  10. Physical model test about vertical and several arc type wave screens which were commonly used was carried out, measuring the wave force and overtopping on the wave screens, analyzing the characteristics of wave force and overtopping of different types of wave screens, and researching the mutual relationship between the wave force and overtopping due to different types of wave screens, to service as a reference for wave screen design of sloping breakwater

    通過對常用的直立式及幾種圓弧式浪墻進行物理模型試驗,測量作用其上的波浪力和越浪量,分析不同浪墻形式在受力和越浪上各自的特點,並討論浪墻型式引起的越浪和受力的相互關系,可供料浪墻設計參考。
  11. This study focused on construction technology of geogrid reinforced clayey soil embankment on common earth foundation. it is conducted according to a test road located in tongchuan, north - west china ' s shaanxi province. long term strain of geogrid in the embankment was researched

    本文以陜西省省道305線土工格柵加筋路為實體工程,通過試驗路修築,對土工格柵加筋路的施工技術進行了研究,分析了碾壓中的格柵損傷問題,對路中土工格柵的應變進行了測試與分析,並對土工格柵加筋路護技術進行了研究。
  12. Product function : soft soil subgrade strengthening, reinforced embankment & slope, strengthening separation, bounding deformation of foundation, prevent road from reflection crack, increasing the intensity of subgrade. it can strengthen soft subgrade of kinds of roads and railways ; prevent road from reflection crack ; enhance the strength of subgrade ; reinforcedriverbank, embankment and slope ; homogenize the stress ; adjust settlement ; improve the stability and bearing capacity of the basement ; strengthen road and bridge tops

    產品功能:軟土路基加強,路加筋,加強隔離,約束地基變形,止道路反射裂體,提高路基的強度.各種道路、鐵路等軟路基加強,增強路基的強度;河岸、路、邊起加筋,均化應力,調整沉降,提高基底穩定和承載力;道路橋臺面的加強。
  13. Bankslope caving and its influence on the flood bank in jiangxi section of the yangtze river

    長江江西段岸崩塌及其對洪大的影響
  14. Landslide hazard mitigation works including earthworks, installation of soil nail, concrete check dam and flexible boulder fence, drainage works and maintenance access road works

    災害護工程,包括土木工事、裝設泥釘、擋土和柔性石欄、排水工程和維修通道工程。
  15. It is shown that the bruises of geogrid are decreased if sheep - foot roller is used when lay - down thickness deeper than 30cm. the deformation of geogrid mainly comes of construction. the infiltration of rainwater is disadvantage for the stabilization of geogrid reinforced embankment

    研究表明:在填土虛鋪厚度大於30cm的情況下,採用羊腳碾壓路機碾壓能有效減小土工格柵的損傷;實際工程中土工格柵的變形主要來源於施工的影響;雨水的入滲對土工格柵加筋路的穩定性極為不利;水泥土是經濟合理的護措施。
  16. The type of embankment landslide and preventive treatment measure on wanzhou - liangping high speed highway

    萬梁高速公路路的類型及治措施
  17. According to our national norm, the weight of the core of rubble mound breakwater should be 10kg ~ 100kg

    根據我國規范規定,斜心石應採用10 100kg塊石。
  18. The lowest part, as of an embankment or a dam

    腳最底下的部分,如或壩的
分享友人