防水底層 的英文怎麼說

中文拼音 [fángshuǐdecéng]
防水底層 英文
substratum for waterproofing
  • : Ⅰ動詞(防鷥) provide against; defend against; guard against Ⅱ名詞1 (防守; 防禦) defence 2 (堤...
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : 底助詞(用在定語后, 表示定語和中心詞之間是領屬關系, 現在多寫作「的」)
  • : i 量詞1 (用於重疊、積累的東西 如樓層、階層、地層) storey; tier; stratum 2 (用於可以分項分步的...
  • 防水 : waterproof; water proofing
  1. Flexible sheets for waterproofing - bitumen damp proof sheets including bitumen basement tanking sheets - definitions and characteristics

    用柔性薄板.包括瀝青制箱用薄板的瀝青潮薄板.定義和特性
  2. Flexible sheetes for waterproofing - bitumen damp proof sheets including bitumen basement tanking sheets - definitions and characteristics

    用柔性薄板.包括瀝青制箱用薄板的瀝青潮薄板.定義和特性
  3. Flexible sheets for waterproofing - bitumen damp proof sheets including bitumen basement tanking sheets - definitions and characteristics ; german version en 13969 : 2004

    用柔性薄板.包括瀝青制箱用薄板的瀝青潮薄
  4. Flexible sheets for waterproofing - plastic and rubber damp proof sheets including plastic and rubber basement tanking sheet - definitions and characteristics

    用薄板.包含塑料和橡膠制箱用薄板的塑料和橡膠潮薄板.定義和特性
  5. Flexible sheets for waterproofing - plastic and rubber damp proof sheets including plastic and rubber basement tanking sheet - definitions and characteristics ; german version en 13967 : 2004

    彈性薄板.包含塑料和橡膠制箱用薄板的塑料和
  6. In the design, the construction measures such as application of shrinkage - compensating concrete, arrangement of spacing layer between the foundation rock and the bottom slab, adding outside waterproof layer, flexible connection between outlet pipe with side - wall, integerated concrete placement of pump seat with bottom slab and design of reinforcement with application of advanced calculation theory are used according to the characteristics of lager span, larger volume and complex loading conditions of the understructure

    針對下部結構跨度大、體積大、受力復雜的特點,在設計中採取多種措施,包括採用補償收縮混凝土、基巖與板間設隔離、增設外、出管與邊墻採用柔性連接、機座與板整體澆注、採用先進計算理論指導配筋。
  7. A brief introduction is given to the treatment of the zeya dam foundation, principles of seepage control and design of the concrete face rockfill dam of the zeya reservoir. as for the excavation of the sand - gravel zones, except the toe slab and its 1 / 9 bottom width down stream, the alluvial layers are excavated to the micro - weathered rocks, while the other sections remain unexcavated. regarding to the treatment of the fracture zones, concrete filling is used for the toe slabs and semi - permeable materials are used for other section. according to the construction characteristics, a filter is placed in the down stream embankment foot. to improve the integrity of the dam foundation and anti - seepage capability consolidation grouting and curtain grouting are adopted. as a result safety, economic benefit, convenience in construction and good performace are achieved

    簡要論述澤雅庫面板堆石壩壩基處理和滲的原則及設計要點.趾板基礎和堆石體各區砂礫石基礎開挖,除趾板與其下游1 / 9寬范圍以及壩腳挖除沖積至弱風化(局部微風化)基巖外,其餘部分均予以保留.斷破碎帶處理,趾板部位採用混凝土塞,其它部位採用半透料置換,並根據本工程特點在下游壩腳加設了反濾.為提高壩基的整體性和滲性能,對趾板進行了固結和帷幕灌漿.達到了安全、經濟、便於施工的目的,運行情況良好,可為面板堆石壩的設計和研究提供參考與借鑒
  8. To the inferior trap of rock - bottom building, ought to want special attention the following problem : ( 1 ) notice indoor moistureproof design, the ground outside basically observing indoor ground is compared wants tall how many, moistureproof measure how, judge thereby, the building fights damp ability, whether to live aptly ; ( 2 ) notice indoor facilities is designed, conduit of indoor fluctuation catchment is reasonable, observe whether conduit distribution is equitable, expedite, jam not easily ; ( 3 ) notice the establishment outdoor is designed, whether is the system such as room of the raceway groove outside be like, cesspool, water pump, catchment designed reasonable, accessary establishment leaves living room whether too close, this basically is to prevent to be all round the building generation seeper, especially after big rainstorm, be like catchment not free, the excessive outside possible sewage, by water adj / lit wide

    對于房屋的劣質陷阱,應當要非凡注重以下問題: ( 1 )注重室內地面潮設計,主要觀察室內地面比外地面要高多少,潮措施如何,從而判定,房屋抗潮濕的能力,是否適宜居住; ( 2 )注重室內設施設計,室內上下排管道是否合理,觀察管道布局是否合理,是否暢通,不易堵塞; ( 3 )注重室外設施設計,如外溝道、化糞池、泵房、排等系統是否設計合理,附屬設施離居住房是否太近,這主要是為了止在房屋四周產生積,非凡是大暴雨後,如排不暢,有可能臟外溢,被淹。
  9. Fabrication of the box beam is divided into such parts as reinforcement, formwork, concreting, prestressing, moving and storing of beam, pipe grouting under pressure, end sealing of the beam, water - proof layer on the bridge surface system, protective coating etc. the paper makes description of effective box beam construction technology and workmanship which can be adopted in other projects, such technologies as : manufacturing and fixing of reinforcement, steel reinforcement fixing baseplate, web plate and top plate respectively and lifting the steel skeleton into form, requirements of design and manufacturing and way of utilization for dismantling - erection type formwork and hydraulic formwork, optimization of concrete ratio, concrete pouring process of two ends of beam in priority over the middle, in sequence of first baseplate followed by web plate and top plate at last, concrete pouring in inclined section and in horizontal layer, concrete vibration mainly by external vibrator in assistance with internal vibrator, methods and regulation for steam curing of concrete, dual controls over stress and strain to ensure quality of prestressing workmanship, construction method of effective beam moving by heavy - weight special moving facility, some regulations and key notes about construction of grouting under pressure, beam ends sealing, water - proof layer on the bridge surface system, protective coating

    箱梁製造由鋼筋工程、模板工程、混凝土工程、預應力工程、移存梁工程、孔道壓漿工程、梁體封端工程、橋面和保護工程等施工環節組成。文中介紹的採用胎具製作和綁扎鋼筋,分腹板和頂板分別綁扎並吊裝鋼筋骨架入模;拆裝式和液壓式兩種模板的設計、製作要求和使用方法;綜合考慮、優化混凝土配合比,混凝土灌注從兩端至中間、先板、后腹板、再頂板的施工順序和斜向分段、腹板平分、附著式振搗為主、插入式搗固為輔的施工工藝,蒸汽養護的方法和規定;應力應變雙控制確保預應力施工質量的施工技術;採用重物移運器有效移梁的施工方法;壓漿、封端、橋面和保護施工的一些規定和注意事項等都是對箱梁製造行之有效的施工技術和施工方法,並可為以後類似施工作借鑒。
  10. In this thesis, first, reasons and factors for the stability of loose rock dams were summarized according to the field surveys and certain expert ' s experiences. then, researches on block stability problems were reviewed, and according to the relationship between grain size and incipient velocity, it is found that the block weight is in direct proportion to 6 - 9 power of incipient velocity, and 50 % increase of the velocity will result in about 40 times change of the block weight. after that, experiments were conducted in a flume, focusing on the relationship between incipient velocity and some main factors including block weight, water depth over the dam, cross - section size, block material and river bed material

    本文首先根據散拋石壩損毀情況的現場調查資料,結合有關專家多年的整治經驗,總結出壩體的損毀原因及影響因素;對現有塊體穩定性的研究成果進行回顧和總結,並針對散拋石壩的直接損毀現象,結合山區河流的流、地形特點,利用塊體粒徑與起動流速的關系,提出塊體穩定重量與起動流速高次方成正比的概念,流速50的增長可能導致塊體穩定重量接近40倍的變化;通過二維變坡槽試驗,研究了壩體穩定的主要影響因素,包括塊體重量、壩頂深、斷面尺寸、塊體材料(塊石和卵石兩種) 、護等,結果表明對于山區河流,試圖僅僅通過增加壩體單個塊體重量或斷面尺寸來提高壩體穩定性效果甚微;最後,根據西部地區的自然、經濟、交通等條件,提出可以採用柔性混凝土鉸鏈體等一類整體性較好的護面作為散拋石壩的沖毀措施,以期取得良好的工程效果。
  11. Richly contains high efficiency moistening factor and pearl essences and can instantly bring suffi - cient water and active elements into deep skin to clean up dirt in the skin, promote regeneration of skin cells, and prevent and reduce wrinkles, regular use helps the skin enjoy freshened, well moisturized, elastic state for a long time

    蘊含高效補因子及珍珠精華,其有效成分迅速滲入皮膚深,徹清除肌膚及毛孔內的污垢,活化和促進細胞再生,預和減少皺紋,同時加強皮膚的潤濕,使肌膚獲得永久保濕,清新滑爽,富有彈性。
  12. Standard specification for asphalt primer used in roofing, dampproofing, and waterproofing

    屋面潮和用瀝青塗料的標準規范
  13. According to the documentation collected from domestic and abroad wang wei dong who works in huadong architect and structure institute utilizes the similar work property between the underground continuous wall and pile subjected the vertical loads, and introduces poulos method of elasticity and plastic which applies to pile foundation into the calculation for subsidence of underground continuous wall. pujialiu and yu yuzhou from water and electronic engineering of qinghua university, according to the result of three axes, define the concrete parameter utilize the model of non - linear e - b combined with the design cross section of dam in xiaolangdi, yellow river accept the total stress programme of thepd dam, and we analyze the stress and displacement of plastic concrete diaphragm wall by finite element method in comparison with the result of common concrete one. at same time, we consider the effect of the character of plastic concrete diaphragm wall which is composed of different gradients and adopting the level of stress and pulling stress infers whether the plastic concrete diaphragm wall is safe or not

    地下連續墻是一種歷史較短的施工方法,目前,砼滲墻的設計還是以傳統的設計方法為主,根據查找國內外文獻資料,華東建築設計院王衛東利用地下連續墻與樁在豎向荷載作用下的工作性能有相似性,將適用於樁基的poulos彈性理論引入對地下連續墻的沉降計算中;清華大學電工程系濮家騮、于玉貞根據三軸試驗結果確定混凝土的參數,利用非線性e - b模型,結合黃河小浪土石壩設計剖面,採用thepd土石壩總應力程序,對深覆蓋塑性混凝土滲墻的應力、位移進行有限元分析,並與普通混凝土滲墻計算結果加以對比,同時分析了不同配比塑性混凝土特性的影響,並採用應力平和拉應力數值來判斷塑性混凝土滲墻的安全程度。
  14. Abstract : a brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    文摘:介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊研究;二期圍堰滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深抗滑穩定研究;三峽電站進口型式研究;鋼襯鋼筋混凝土引管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸系統及力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型輪發電機組的科學研究。
  15. Efficacy : abundant nutrient can prevent of lacking water from the skin, locked the water in the bottom of skin, it possess soften and tighten efficacy, soften the horns and tighten the pores, smooth the wrinkle, improve the coarseness and dryness skin, make your skin particularity and tender, present the glittering beauty

    功效:豐富的營養成分可止肌膚內份的蒸發,鎖住肌膚份,且具有柔膚和細膚的功效,軟化角質的同時有效收縮粗大毛孔,撫平細紋,改善粗糙、乾燥肌膚,令肌膚細膩柔嫩,使其再顯晶瑩剔透的美感!
  16. The tent s base is waterproof, while its inner layer is made of finely woven netting that provides ventilation and protection against insects, and also serves as a stand - alone mosquito net

    打坐帳:移除外帳,變成一座露天打坐帳,防水底層設計,帳幕通風細密,蚊蟲叮咬。平時可當一般蚊帳使用。
  17. As an antirust paint for new or existing ship hull and also as an antirust undercoat and primer for container

    主要用於新船或舊船的線以下及以上部位的銹塗也可以用於集裝箱的中間銹漆及漆。
  18. Foundation dewatering and foundation slab waterproof construction of multi - storey basement

    地下室基坑排施工
  19. Check motor vehicle exterior priming and colour coats, sealers and glazers, and mark, record and report defects to be repaired

    檢查汽車的外部漆、彩飾、保護(或)和釉光,標注、記錄並且報告有待修補的瑕疵。
  20. Mainly produces and sells garment materials with pu dry - method and wet - method waterproof moisture - permeable coat, all kinds of garment materials with special coat of functional properties, all sorts of pvc pu dry method and pu wet method artificial leathers. it has the self - running import export license and has passed the iso 9001 - 2000 quality management system certification in end of 2002

    江陰永隆塑料有限公司主要生產銷售pu干法濕法透濕塗服裝面料各種專用功能性塗服裝面料各種pvcpu干法人造革pu濕法人造革,有自營進出口權,並於2002年通過了is090012000版全面質量體系認證。
分享友人