限坡選定 的英文怎麼說

中文拼音 [xiànxuǎndìng]
限坡選定 英文
choice of ruling gradient
  • : Ⅰ名詞(指定的范圍; 限度) limit; bounds Ⅱ動詞(指定范圍, 不許超過) set a limit; limit; restrict
  • : Ⅰ名詞(地面傾斜的地方) slope Ⅱ形容詞(傾斜) sloping; slanting
  • : Ⅰ動詞1. (挑選) select; choose; pick 2. (選舉) elect Ⅱ名詞(挑選出來編在一起的作品) selections; anthology
  • : Ⅰ形容詞1 (平靜; 穩定) calm; stable 2 (已經確定的; 不改變的) fixed; settled; established Ⅱ動詞...
  • 選定 : designate; selected
  1. On the basis of bishop, fem ( finite element method ), dem ( disturbing energy method ), ann ( artificial neural network ) and ai ( artificial intelligence ), the thesis has study in details about the stability analysis, condition forecast, repair mode selection of the landslide, and obtain some significative conclusion

    本文結合實例,運用簡化畢肖普法、工程數值模擬技術-有元法、基於系統能量準則的干擾能量法、神經網路理論及人工智慧理論等多種手段,從不同角度對滑的穩分析、狀態預測、整治方案取等進行了較為深入的研究,得出了一些有意義的結論。
  2. Including actuality evaluation, environmental identification analysis, dynamic harmonious analysis, dynamic simulation analysis and policy decision putting into optimization scheme. the results showed as follows. 1, in the current agricultural production structure, output value of animal husbandry and crop planting occupy 93. 4 % of agricultural total output value, and forestry and fishery do not get fully reasonably develop ; the wild economic vegetables and fruits resources and water resources etc, are the superiority environment factors of agriculture development of this area, and the slope farmland and service system etc, are limited environment factors, and the science - technology and labor quality etc, are potential environment factors ; there exists some problems in the agricultural production system, for example, single productive constitution do n ' t correspond with varieties of resources, rich plant resources exploitation scarcity and economical crop development lag

    本文擇四川盆周山區這一特地貌區域作為研究對象,以滎經縣為代表研究了該區農業生產結構的優化調整,包括農業生產系統的現有結構評價、環境辨識分析、動態協調分析、動態模擬評價分析和實施優化方案的決策建議,結果表明: 1 、滎經現有結構為以畜牧業和種植業並重的豬糧為主的農業生產結構,二者產值占農業總產值的93 . 4 ,林業、漁業未得到充分合理發展;野生經濟菜果資源、水資源等為該區農業發展的優勢環境因子,耕地、服務體系等為制環境因子,科技、勞動力素質等為潛力環境因子;同時該區農業生產系統存在著生產結構的單一性與資源多樣性的利用不協調、豐富的植物資源開發不足、經濟作物發展滯后等問題。
  3. In this paper, based on the analysis of the rlem of theory foundation, computing method, preference, applicability, etc, we anatomized the rlem of three self - deficiencies and six scarcities. moreover, we adopted the parallel ways of contrasting the rlem with the fem and applied it to analyzing the impact of slide block of elasticity and plasticity, slip surface of coefficient and slip bed of elasticity, plasticity upon the stability of slope and in the plain linearity slope, the plain refracted line slope and the plain arc slope. in addition, we discussed the warp of between the lem of ( sarma, janbu, order, bishop, morgenstera - price, etc ) and the fem of result and the distributing of positive stress and shear stress on the slip surface

    本文從剖析剛體極平衡法的理論基礎、計算方法、參數取、適用條件等方面入手,剖析了剛體極平衡方法的3點自身缺陷和6點不足,並在此基礎上採用了剛體極平衡法(平面滑動破壞法、 sarma法、傳遞系數法、普遍條分法、 janbu法、 bishop法、 morgenstern - price法)與大型有元法對比研究的方法,分析研究了平面直線型滑、平面折線型滑、平面圓弧型滑在漸進破壞中邊的滑體彈塑性參數、滑麵塑性參數) 、滑床的彈塑性、以及極平衡法無法考慮開挖應力釋放等因素對邊性的影響與滑動面上的正應力、剪應力分佈規律、安全系數的解答的差異。
  4. The choice dam type is especial importance, during the designed research of the rock - fill dam, particular under the rock - fill dam with very deeply cover layer, the stress and strain of the middle wall and cutting interpenetration wall of the dam foundation is mostly sensitive, whether the. design of dam is scientific and reasonable, it is very important for cutting interpenetration and stability of the dam, the article offer the reference for the design of cutting interpenetration in the foundation with deep cover with earth the water conservancy in xiaban zone, based on the study and analysis the design of cutting seep in the foundation with deep cover with earth, cutting interpenetration concrete wall and the joining model of cutting interpenetration material in body of dam and the applying effect in the practical worko based on the foundation which absorbed and summarize the achievement of design and research in the inter and outer country, for the project of the clay vertical middle wall and vertical cutting interpenetration, the asphalt concrete vertical middle wall and vertical cutting interpenetration the clay inclined middle wall and the lever carpet layer cutting interpenetration, respectively in terms of the different stage of complete period sluice period and working condition, adopting nonlinear calculate and analysis with the finite element method ; carrying the analysis and study with the 3d finite element method as to the different joining model of the left bank high slope cutting interpenetration body and the foundation concert cutting interpenetration wall ; carrying the analysis and study with the 3d finite element method as to the effect of the wall stress and strain because of the different elasticity modulus of the concert cutting interpenetration wall through the analysis and study with the different project. have comparatively all - around comprehended the various model dam, particular the distribute rule of stress and strain of the cutting interpenetration system, provide for the important evidence of the plastic area size the join model of the foundation cutting interpenetrate wall and dam body cutting interpenetrate system the choice of the dam model and the design of the structure of the dam body, the result of research and advice have very importance value in design and building for the similarity project

    工程設計中,壩型的取顯得尤為重要,特別對于壩基有深厚覆蓋層的堆石壩,心墻和壩基防滲墻的應力和變形是壩體、壩基最敏感的部位,設計方案是否安全、科學和合理,對大壩防滲和穩起到至觀重要的作用。本文研究分析了國內外深厚覆蓋層基礎防滲設計、壩基混凝土防滲墻與壩體防滲體銜接形式及工程實際應用效果,為下坂地水利樞紐工程深厚覆蓋層基礎防滲設計的方案擇提供了參考;在吸收和歸納了國內外堆石壩的設計研究成果的基礎上,對粘土心墻和壩基垂直防滲方案、瀝青混凝土心墻和壩基垂直防滲方案以及粘土斜心墻和壩基水平鋪蓋防滲方案,分別按竣工期和蓄水運行期的不同工作情況進行了有元非線性計算分析;對左岸高陡邊的大壩防滲體與基礎混凝土防滲墻的不同結合型式進行了三維有元靜力計算分析和研究;對混凝土防滲墻不同彈性模量對墻體應力和變位的影響進行了三維有元靜力計算分析和研究。通過對不同方案的計算分析和研究,比較全面的了解了各方案壩體,尤其是防滲體的應力和變形分佈規律,為壩型擇、壩體結構設計、基礎防滲墻與壩體防滲體的結合型式以及塑性區大小的確提供了重要依據。
  5. This paper set up a geological model of sliding mass by geological condition analysis and selection cross section of character representation of guishan sliding mass. the stability of sliding mass is calculated and evaluation under bench stoping and deck excavation in terms of six excavation schemes with limit equilibrium method. there dimensional finite element method is applied to study the stability of sliding mass to the deck excavation schemes by means of computer simulation and calculation

    通過對滑體工程地質條件的分析,取滑體的代表性剖面建立了滑體的地質模型,取極平衡方法就滑體在臺階式開挖和整體開挖兩種不同開挖方式共6種具體開挖方案條件下,對滑體的穩性進行了量計算評價,提出臺階式開挖和整體開挖兩種不同開挖方式的的各開挖方案的比較結果,然後就確的具體開挖方案開展三維有元數值計算,並進行評價,以達到相互校核、相互驗證的目的,最後,確出工程應用的開挖施工方案。
  6. In order to analyse the stability of the slop of this area, the longmen apex was chosen as a typical slope

    為分析長白山天池地區斜性,取龍門峰作為典型斜,採用有元法對其進行應力、位移模擬分析,繪制最大、最小主應力等值線圖。
  7. In this thesis, the unloading region of a typical cross section of shiplock slope of tcp is given, that is 15570 according toin - situ test and geological survey. considering the effects of excavation unloading, numerical analysis for shiplock slope is made by fem and flag. using the theory and software described in this thesis, the excavation analog and the stability analysis of the typical cross section of the three gorges shiplock high slope has been carried out

    本文取三峽工程永久船閘邊的典型剖面15570剖面,根據現場試驗和地質調查確的卸荷范圍,考慮卸荷帶巖體力學參數隨開挖過程而變化,採用二維彈塑性有元法、二維彈塑性顯式有差分法進行了邊施工開挖數值模擬。
分享友人