隧道砌 的英文怎麼說

中文拼音 [suìdào]
隧道砌 英文
tunnel lining
  • : Ⅰ名詞1. (隧道; 地道) tunnel; underground pass2. [書面語] (道路) road3. (郊外的地方) suburbsⅡ動詞[書面語] (旋轉) turn
  • : Ⅰ名詞(道路) road; way; route; path 2 (水流通過的途徑) channel; course 3 (方向; 方法; 道理) ...
  • : 砌Ⅰ動詞(用磚、石等壘) build by laying bricks or stones Ⅱ名詞(臺階) step
  • 隧道 : tunnel; tunneling; tunnelling; chunnel; drive
  1. In order to detect the bottom thickness, cavity, leak and deformation of steel meshes in secondary lining of concrete in tunnel construction, the authors evaluate the wave character and the detected result in the second lining of the tunnel using surveying radar technology and conclude the wave character in the tunnel lining which has mass defect and tested the accuracy and reliability of this technique

    摘要為檢明混凝土二次襯中的底界厚度、空洞、漏水、鋼筋網變形等質量問題,利用探地雷達技術,通過對檢測方法及工程檢測實驗的研究,進行二次襯中雷達波形特徵參數及檢測結果評價,總結了質量問題的雷達波形特徵,驗證檢測方法的精度和可靠性。
  2. ( 8 ) as for the runnel which is located at a karst zone with a high water level, external water load is the main one, and rock pressure is secondary

    門)在巖溶富水區地下水水頭較大時,外水荷載是襯結構的主要荷載,圍巖壓力相對來說是次要荷載。
  3. Numerical analysis of secondary lining in double - arch tunnel

    雙連拱二次襯施工數值分析
  4. Evaluation of the effect of collapse in top area of a double - arched tunnel on its the secondary lining

    雙連拱洞頂坍方對二次襯穩定影響評價
  5. Through tunnel model test, the action law of external water load on secondary lining with a grouting loop is obtained

    根據模型試驗理論,通過室內模型試驗得出了有注漿堵水圈的結構外水荷載的作用規律。
  6. Pass through mechanical model calculate, discover the vault and arch foot part in the tunnel secondary lining thickness is weakness part, so at the design and construction must strengthen these part

    通過力學模型計算,結構在拱腳與仰拱交接處以及拱頂部位為二次襯混凝土結構的薄弱部位,設計和施工時應著重加強。
  7. At the part vault and arch foot in the tunnel secondary lining thickness, the standard difference and variance parameter is large than others, so insure the part thickness achieve design require by adjust construction craftwork

    二次襯厚度在拱頂和拱腳的部位的標準差和變異系數較大,在施工中應該考慮調整施工工藝,確保這兩個部位的厚度。
  8. Besides, this paper adopts the random finite element method, uses geometric and physical mechanical parameters that are relevant to lining weight of surrounding rock, coefficient of lateral pressure, height or buried depth of vertical loading, elastic resistance coefficients of surrounding rock, elastic modulus of support structure, unit weight of concrete, thickness of the structure as well as torsional strength and compression strength of concrete and etc., as random variables, applies the monte - carlo method to sampling by computer, preliminarily evaluates the reliability of bearing capacity and stability of molded concrete lining of the xuefeng mountain tunnel, and obtains the related displacement of the lining, mean value and variance of internal force, and computed the reliability index of lining structures

    此外,本文採用隨機有限元方法,將圍巖容重、側壓力系數、垂直荷載高度或埋深、圍巖的彈性抗力系數、支護結構的彈性模量、混凝土容重、結構的厚度以及混凝土的抗扭與抗壓強度等與襯結構有關的幾何與物理力學參數作為隨機變量,應用蒙特卡洛理論進行計算機隨機取樣,對雪峰山模注混凝土襯的承載力與穩定性的可靠度進行了初步評估,得出了襯的相關位移與內力的均值和方差,並計算出了相應的襯結構可靠指標。
  9. As for non - destructive inspection of t railway tunnel lining quality, the two principal indices are strength and depth of lining, of which the latter will only be investigated in this paper

    質量檢測的最主要的兩個指標是強度和厚度,本文只討論厚度的無損檢測。
  10. Drill and blast method of tunnel excavation on hard rock

    硬巖地鐵鉆爆法開挖結合盾構法襯的施工技術
  11. With an analysis of soil liquefaction potential for free field of nanjing metro line 1 under 7 degree earthquake, as well as for excavated field, in line with railway engineering anti - earthquake design specification, dynamic triaxial tests and theoretical analysis using efficient stress method, the author comes to the conclusion that, when metro plate is located at layer s and the layer is thick, liquefied area is at metro bottom plate ; in some local section liquefied area is at metro top plate, or arch sides at the top of metro in most places

    摘要採用鐵路工程抗震設計規范、動三軸試驗及有效應力的理論分析相結合的方法,對南京地鐵南北線( 1號線)區間開挖后其地基土在7度地震情況下的土層液化情況進行分析得出:當底板坐落在5層且5層較厚時的液化區出現在底板處;局部地段液化區出現在頂部及拱腰;大部分地段的液化區出現在頂板上方。
  12. Based on newmark ' s step - by - step implicit integration method, the response analyses of a tunnel are performed by using viscous - spring artificial boundary under various earthquake accelerations and multiform conditions of surround rock. the seismic responses of the tunnel are calculated by changing parameters of surround rock within the tunnel some ranges. two kinds of shock absorption measures, which are setting shock layer and reinforcing surround rock are studied and shock absorption effects, applicable to cases and shock mechanism are analyze

    4計算了不同地震動作用下不同的圍巖材料對地震反應的影響,並通過改變一定范圍內圍巖材料的參數,計算了的地震反應,分析了在施工中設置減震層和注漿加固一定范圍內圍巖這兩種方法的減震效果、適用條件及其減震機理。
  13. Application theory of enhanced wave in tunnel ram testing by ground penetrating radar

    相干波理論在地質雷達檢測中的應用
  14. The geological conditions are very complicated in hejiazhai tunnel which is located in guizhou shuibo railway, this tunnel is named " mashed tunnel " with the most difficult geological conditions such as the high dense gas and developed karst and gushing water assembled together, the geological hazards like the gushing water and sand, the collapse of tunnel, surface subsidence and slide, cracking of tunnel lining were often happened during construction period

    摘要貴州水柏鐵路何家寨,工程地質條件極其復雜,集「高瓦斯、強巖溶、大涌水」為一體,施工期間曾發生多次涌水涌砂、洞內坍方、地表塌陷與滑坡、支護襯開裂變形等地質災害,堪稱水柏鐵路施工難度最大的「爛洞子」 。
  15. Factors affecting joint stiffness of shield tunnel lining

    影響盾構接頭剛度的因素
  16. Through analyzing all kinds of construction methods of building metro station under shield driven method in many countries, this paper studies the construction technique ( method ) of building metro station under shield driven method, taking in guangzhou no. 3 metro line, and linhe xilu station as the actual object. according to station class, function and topography and geology, the station schemes of twin - bore tunnel ( island ), firstly, three parallel tunnels ( island ), tri - bore tunnel ( island or side ) and four parallel tunnels ( island or side ) are proposed. secondly, the shape and main parameters of station structure on two schemes are analyzed with load - structure mode, for different overburden depth of tunnel and lining thickness, etc. thirdly, the construction process is simulated in 2d fem.,

    根據建站的規模、使用功能及站位地形地質條件,提出了兩連拱結構島式站臺車站、三條平行島式站臺車站、三連拱結構島式和側式站臺車站以及四條平行島式和側式站臺車站方案;採用荷載?結構模式,對四種方案的主體結構的形式和重要參數進行分析研究,分不同的埋深、襯結構厚度和拱形結構的拱跨比進行了多組數值計算;採用平面有限元方法對四種車站結構的開挖施作過程進行了模擬分析。
  17. Used to component joint water - proof, building distortion seam, construction seam and metal, concrete etc seam water - proof, for example, tunnel, substructure etc underground seam water - proof construction

    適用於裝配式結構構件接縫防水,建築物變形縫、施工縫用和金屬、混凝土等各類預製件的接縫防水,例如:、人防、基礎工程等地下工程的接縫防水。
  18. Leakage computution of the subsea tunnel crack lining

    海底開裂襯的滲漏量計算分析
  19. The whole project comprised the building of the dam, a 2, 428 - yard tunnel driven through the wong nai chung gap valley and a 5, 500 - yard brick and stone aqueduct to connect the reservoir with the storage tank and filter beds at albany road. each day the volume of water being conveyed reached 7 million gallons. the 6 filter beds of the project were situated on the eastern side of the albany nullah ; measuring 3, 245 sq

    除水壩外,其他配套的工程包括: (一)一條長達2 , 428碼、貫穿黃泥涌峽谷的; (二)一條長5 , 500碼的引水,可連接水塘的亞賓尼濾水池及配水庫,該引水用石及磚成,每天可輸水700萬加侖; (三)位於亞賓尼水渠東部的六個過濾池,該濾水系統面積廣達3 , 245平方碼,深30尺,每天可過濾570萬加侖水,原水過濾后,經一條直徑18寸鐵水管,流入花園與寶雲交界的配水庫。
  20. Abstract : this paper uses the supersonics wave inspecting method for judging the damage degree of fire hazard tunnel lining, and puts forward the correlation of concrete supersonics wave speed with relative physics and mechanical properties through test, and gives evaluation and suggestion about conventional supersonics wave inspecting method used in fire hazard tunnel

    文摘:將超聲波檢測法應用於火災后的初損傷評定,通過試驗研究給出了砼超聲波速與砼有關物理力學性能的關系,並對超聲波檢測常規方法在火損后的應用給出了評價。
分享友人