難行高爐 的英文怎麼說

中文拼音 [nánhánggāo]
難行高爐 英文
tight blast furnace
  • : 難Ⅰ形容詞1 (做起來費事的) difficult; hard; troublesome 2 (不容易; 不大可能) hardly possible 3...
  • : 行Ⅰ名詞1 (行列) line; row 2 (排行) seniority among brothers and sisters:你行幾? 我行三。where...
  • : Ⅰ形容詞1 (從下向上距離大; 離地面遠) tall; high 2 (在一般標準或平均程度之上; 等級在上的) above...
  • 高爐 : [冶金學] blast furnace; shaft furnace高爐鼓風機 blast furnace blower; 高爐灰 blast furnace ash; ...
  1. According to the nb - si phase diagram, the temperature of 1550 ?, which is lower than the eutectoid transformation temperature of nbssi ( 1783 ? ), is chosen for heat - treatment. according to the present conditions of the furfaces, heat - treatment by stages is first proposed for the nb - si system intermetallic composites to keep the furface in good conditions. the results indicate that the equilibrium nb + nbssia dual - phase microstructure of the nb - si system intermetallics forms gradually via such eutectoid reaction as nbasi ? nb + nbssis with the heat - treatment time

    根據nb - si二元相圖,選擇略低於nb _ 3si共析轉變溫度t _ f = 1783的1550對鑄態nb - si系金屬間化合物進不同時間( 25h - 100h )的熱處理,並根據目前國內和我院熱處理的現狀,首次提出採用分段熱處理的方法來解決nb - si合金熱處理溫度、連續熱處理時間過長而影響熱處理壽命的困
  2. Aiming at such problems in combustion system of homemade middle and miniature boiler, as a complex system with the character of dead zone, time variation, serious non - linearity, large time delay, coupling and a lot of disturbance, this paper presents a new set of optimal control resources. by using well - matched control method on system, stable automatic running is realized. having the serious divulgence coals difference a lot from each other in character, instability of chemistry, value of lowest emission of heat, home - made boiler controller is not at all ideal. instead of traditional model that controls the ratio based on proportional control or with the correct signal of the amount of oxygen, this paper, combined with intellect control theory - - fuzzy control and self - optimizing concept, propounded a kind of fuzzy self - optimizing controller to be used in air supplying system of the boiler, and expatiates on the idea of dividing the control process into two parts, dynamic and static to realize, thus meets the demand of homemade boiler economic running

    本設計針對國產中、小型電站鍋燃燒系統參數時變、嚴重非線性、干擾因素復雜、耦合嚴重、模型不易確定的特點,提出多變量協調控制方案,解決了系統可控性差,以實現穩定自動運的問題;在此基礎上,改變以往以煙氣含氧量控制送風的傳統模式,針對國產電站鍋設備主體及一、二次送風迴路泄露嚴重,煤種混雜、成分不穩定、燃燒發熱值低、燃燒效率不等問題,應用智能控制理論中的模糊控制技術,結合自尋最優控制的思想,設計了一種模糊自尋優控制器,應用在電站鍋送風控制系統上,並闡述了動靜態兩種實現途徑,通過在線優化風煤配比,實現最佳經濟燃燒,切實保障了鍋的經濟運
  3. When the data of logistics in current process are used for input of simulating logistics in future 100 % continuous casting process, supply of hot metal from iron - making process may not satisfy the needs of 100 % continuous casting on raw materials. because planning scheme in continuous casting process depends greatly on smelting scheme in convertor vessel, it is important for operator to balance raw materials supply, smelting and casting in order to realize the scheme of 100 % continuous casting. when some equipment are work abnormally, mixer of hot metal and lf furnace can be used for logistics buffer

    用攀鋼煉鋼生產數據對模擬軟體系統進的測試和模擬研究結果表明:模擬系統的隨機數發生演算法可以實現對作業時間的依分佈隨機抽取;在相似的輸入條件下,模擬結果與實際生產物流的時間分佈規律基本吻合,達到了模擬軟體設計的預期目標;若以攀鋼提釩煉鋼廠現工藝的鐵水輸入作為全連鑄后的輸入條件,則現工藝的物料供應能力可能以滿足全連鑄生產的要求;連鑄機的連澆計劃對轉次計劃的編制有很的要求,合理安排來料、煉鋼與澆鑄三者間的物流平衡關系將是保證全連鑄作業的重要條件;當出現設備異常情況時,可以利用混鐵與lf站前等待作為物流緩沖池,通過延長系統的平均物流時間來緩解因設備檢修和故障等擾動所造成的影響,確保生產的順利進
  4. Abstract : to realize pulverized coal injection for smelting blast furnace femn, the technical difficulties are analysed on chinese large injection value of pulverized coal for blast furnace femn using advanced experiences in all over the world, the feasibility and appropriate measures are also probed into

    文摘:為了早日實現冶煉錳鐵噴煤,借鑒國內外噴煤的先進經驗,分析了中國錳鐵大噴煤量的技術點,對錳鐵大噴煤的可性及相應措施進了探討。
分享友人