電站容量 的英文怎麼說

中文拼音 [diànzhànróngliáng]
電站容量 英文
generating capacity
  • : Ⅰ名詞1 (有電荷存在和電荷變化的現象) electricity 2 (電報) telegram; cable Ⅱ動詞1 (觸電) give...
  • : Ⅰ動詞1 (站立) stand; be on one s feet 2 (停下來; 停留) stop; halt; pause Ⅱ名詞1 (停車點) st...
  • : 量動1. (度量) measure 2. (估量) estimate; size up
  • 電站 : power station電站船 generating ship
  1. Along with the a enhancing proportion of hydroelectricity in the whole electricity system in our country, the increase of the single unit capacity, the faults ratio of the large - scale hydropower units is more and more important to the whole system safe operation, if we do n ' t manage it well, it will cause the collapse of the whole system and bring a great loss of country ' s economy, hi addition, accompany with " to dispart plant and grid, connect to the grid according to the price " put into practice, how to control the production cost of the power plant has to be put into consideration

    隨著我國水在系統中所佔比重的增加及單機的增大,大型水和機組的故障率對系統的安全運行也越來越重要,如果處理不好,甚至會引起整個系統的崩潰,給國家帶來巨大的損失。另外,隨著我國「廠網分開,競價上網」的逐步實施,如何控制發廠的生產成本,也將提上各個廠的議事日程。
  2. The way of taking one nth out of capacitor ' s the first harmonic capacitive reactance as its nth harmonic impedance is verified whit the data from tang7c. according to the approximately estimating method, the first harmonic impedance of 220kv system is calculated. on the basis of the models, this paper gives the harmonic equivalent circuit of substation and gives the b ( n ) function of the harmonic time n. when the capacitors has different combination, b ( n ) ' s value will also change, with the inputting local measurement data, the paper studies the series and parallel resonance at the substation, and deduces that the reason the capacitor ' s fuse of tang6c is frequently interrupted is that its capacitor current contains a large number of 5th harmonics, and that the reason the discharging pt of tang7c capacitor being exploded is also that the 7th and 9th harmonic currents are amplified

    據此,對該進行了串聯諧振分析和並聯諧振分析,並結合測試數據和有關變的運行記錄,指出了導致該器湯6c頻繁燒保險的主要原因是5次諧波流含偏高,引起湯7c放pt爆炸也是因為7次和9次諧波流被放大。針對這些導致湯陰變補償器故障的原因,提出了相應的諧波治理措施,包括針對湯6c器5次諧波流含偏高的原因,提出了停運湯6c器或者通過把湯sc器的部分併入湯6c器(湯sc其餘部分停運)以增加湯6c諧波承受能力的措施;針對# 2變低壓側7次和9次諧波流被放大的現象,提出了在湯7c器上加裝一定百分比的串聯抗器的措施。
  3. Static benefits are generated from peaking and valley - filling, which are further divided into capacity benefits and coal saving benefits. dynamic benefits come from its fast starting and flexible operation, including frequency regulation, synchronous condenser operation, fast coverage of steep load gradient and synchronous spinning reserve. as for the calculation of static benefits of pumped storage plant, the alternative coefficient method is normally adopted at present

    目前在抽水蓄能的靜態效益計算中,一般採用替代系數法,即用抽水蓄能的裝機乘以替代系數( 1 . 05 1 . 1 )計算抽水蓄能的替代;用抽水蓄能的發乘以替代系數( 1 . 05 )計算替代的發,再根據循環效率的大小計算抽水蓄能的燃料消耗。
  4. Study on relation between energy output with power unit ' s capacity of three - gorge hydroplant

    三峽單機與發的關系研究
  5. Wuhan boiler group ltd. is the groop which designs and manufactures large capacity and high parameter power plant boilers and pressure containers

    武漢鍋爐集團有限公司是國內設計和製造大、高參數鍋爐和壓力器的大型企業集團。
  6. The problem about neutral - point - grounding mode is an all - around technical problem which associated with not only power system reliability , insulation coordination , electromagnetic interference , but assault safety 。 in china , the neutral grounding modes of the 10kv net involved of none grounding, grounding by arc suppressing coils, resistance grounding or reactance grounding in the past 。 with the development of civic power network , low resistance grounding mode was used to restrain the over voltage, particularly in guangzhou, shanghai , beijing , and zhuhai etc. it was reported that the over - voltage level of low resistance grounding mode is lower than that of arc suppressing coil mode, but the operation carried out the other way 。 at substations in guangzhou and shanghai it was found that the low resistance grounding mode is successful 。 but in some areas , such as zhuhai , substations grounding with low resistance revealed some problems , including power supply reliability rapidly dropping , transmitting line often tripping ; and person safety being threatened 。 so interiorly the grounding mode selection of the 10kv network was disputed, which mainly focused on the fault form of 10kv net grounding, the apply area of suppressing arcing coil grounding mode, power supply reliability level of the two modes, person safety, communication interfere and the workload of maintenance

    爭議點主要是在10kv網接地故障的形式、消弧線圈接地的應用范圍、兩種運行方式供可靠性的高低、人身安全、通訊干擾和運行維護工作等諸多方面。 11 17本論文就是針對以纜為主的城區10kv網中性點接地方式的選擇問題進行研究。論文首先對10kv網的中性點運行各種方式進行分析,比較各方式的特點,然後以重慶儲奇門變10kv網的實際參數來建立數值計算模型,在考慮了網接地流變化、中性點阻取值大小、接地點接地阻值變化等多種影響因素的情況下,對中性點經消弧線圈接地和經小阻接地方式下網的過壓水平和接地點短路流大小進行了數值計算,其計算結果與科院所作現場試驗進行了比較。
  7. With the development of the electric power system, static - state reactive power compensators ca n ' t have met the requirements of the actual production and operation, and the trend to the fast and dynamic compensation for reactive power become greater and greater. since ertan hydroplant and 500kv transmission systems in sichuan power system have been operated, many power plants of load center are forced to halt during the high - water period, because the great deal of power is transmitted to far - distance load center. thus the load center loses voltage sustentation and the level of the system stabilization is debased greatly

    四川網的二灘水和500kv輸變系統投入運行后,由於二灘水的大力遠距離輸送至負荷中心,迫使負荷中心的火機組在豐水期大停機,使負荷中心失去壓支撐,大大降低了網的壓穩定水平;同時,因為四川網中的無功補償裝置全為靜態無功補償器(或抗器) ,這些設備只能在系統正常運行狀態下起到無功補償和壓支撐的作用,而在網出現事故時,不但不能起到壓支撐作用,反而會促使壓崩潰事故的發生。
  8. This paper elaborates the parameters selection of the 700mw turbine for laxiwa power station located upstream yellow river, which is coming into construction soon. through statistical calculation of specific speed for turbines with large capacity, high operating head in domestic and oversea power station, utilizing turbine homologous theory. adopting regression statistic calculation method, it has got specific speed statistic equation., the demonstration of primary parameters selection, and the primary target parameters suitable for laxiwa power station

    本文針對黃河上游即將開工建設的拉西瓦水700mw水輪機的參數選擇進行了研究,通過對國內外的大、高水頭水輪機的比轉速統計計算,利用水輪機的相似理論,採用回歸統計計算方法,統計出了比轉速統計方程,並進行了水輪機主要參數選擇論證,提出了適合拉西瓦水水輪機的主要目標參數。
  9. Nuozadu hydraulic - power station will be built in lantsang river in yunnan province, has a oversize hydraulic power project, its highest height of the design dam achieve 260 meter, and its installed capacity arrive 5, 600, 000 kilowatt

    雲南省瀾滄江糯扎渡水,最大擬建壩高260m ,裝機560萬千瓦,屬特大型水工程。
  10. Dinghu are mainly relied on the power supply of the power grid of guangdong province, there are four 110, 000 v transmit and transformer substations, one thermal power plant with a total installed capacity of 3000 kw in the first duration, and a total capacity of power supply of 75000000 kw and a daily load of 15000 kwh in the district, the power grids are perfect and cover the whole district

    鼎湖區主要依靠廣東省大網供,全區擁有4個11萬伏輸變和一家首期3000千瓦的火力發廠,總供能力超過7500萬千瓦,日負荷達1 . 5萬千瓦時。區內代網路齊全,供民線路覆蓋城鄉。
  11. The axial flow type turbines are available for hydrauric power resources of medium and low heads. ganfa manufactures both the propeller type fixed blade type and the kaplan type adjustable blade type turbines. the propeller type turbines are suitable for hydropower stations with small or medium capacities and heads, and relatively stable loads. the kaplan turbines are suitable for hydropower stations with medium or large capacities and heads, and relatively unstable loads

    軸流式水輪機適應于開發中低水頭水力資源。我公司生產的軸流式水輪機按轉輪結構分為定槳zd轉槳zz兩種,定槳式一般適用於中小及水頭負荷變化較小的的水轉槳式多用於大中型及水頭負荷變化較大的水
  12. The overhaul of power units are arranged in terms of peaking capacity balance and the power loads are dispatched based on the principle of equal incremental coal consumption rate in the new method, which is anticipated to solve the economic operation of the power system

    實際上,抽水蓄能效益與網的負荷水平、負荷曲線形狀和常規水的比重有關,而節煤效益除與負荷水平、負荷曲線形狀有關外,還與網的源結構、火機組的動力特性有關。
  13. When was this power station built ? how about its installed capacity

    這個是什麼時候建的?裝機是多少?
  14. The developed resource is 82, 200 kw, the investors for 10 designed hydropower stations have not yet to be practicable

    已開發建成裝機8 . 22萬千瓦,規劃未落實業主的有10座。
  15. The state invests 600 million yuan in this project, which is scheduled to start operation with an installed capacity of 90, 000 kilowatts in 1995

    國家為這一工程投資6億元,裝機9萬千瓦,預計到1995年並網發
  16. Annual synthetical cost or power loss, etc. ) with physical constraints, such as load demand, line ' s capacity, substation ' s capacity etc. as we know, it is difficult to get differential function of a nonlinear objective function, so for simplifying the problem, a layered optimal strategy for multi - constrained substation positioning is proposed

    址優化是在滿足諸如負荷需求、線路、變電站容量等約束的情況下,尋優新建變的位置坐標,使某目標值(例如,年綜合計算費用、線損等)達到最優。
  17. Ganfa has over 50 years experience of designing and manufacturing and has many items of patent techninque. the synchronous generators and permanent magnet generators which are manufactured with advanced technology and excellent machining equipement, will be able to meet the requirement of different technical condition which matched with various type turbines. ganfa has manufactured the generators of 0. 1 to 20mw in capacity which have been put into operation at present and owns the capability to manufacture the following generators : the capacity per unit up to 180mw, the stator outer diameter of generator up to 9, 000mm, the speed of vertical type generator up to 750r min, and thespeed of horizontal type generator up to 1, 500r min, both the b - grade and f - grade insulation class, the terminal voltage can up to 13. 8kv. ganfa manufactured 34, 500kw water turbine generator sets for the donghewan power station, yongchang, gansu, china which is located in 2. 868. 5m height above sea level, and has successfully solved the difficult problems such as plateau corona - shielding. ganfa is equipped with the generator test station and insulation material laboratory which are advanced test facilites and testing means to make each item electrical performance of products meet designing requirements from purchasing to delivering

    公司具有50年的設計製造經驗,擁有多項專利技術,生產的同步發機永磁機技術工藝先進,製造精良,能滿足與各式水輪機配套的不同技術條件要求。目前公司已製造投產的發范圍為0 . 120mw ,具備生產單擊50mw的能力,發機機座號最大可達9000mm ,立式機最高轉速750r min ,臥式機最高轉速達1500r min ,絕緣等級有b級和f級,圈式線圈最高壓達13 . 8kv ,公司製造的甘肅永昌東河水34500kw水輪發機組,海拔為2868 . 5m ,成功解決了高原防暈等難題。公司擁有機試驗絕緣材料試驗室等先進的實驗室設施和測試手段,使產品從原材料進產,到成品出產的各項器性能測試均能滿足設計要求。
  18. In recent years, there are some important changes on sps, such as rapid increase of the electricity implement with the capacity increase of sps and single generator. the operation of sps becomes great complication

    近年來,船舶發生一些重要變化,如器機械迅速地增加,電站容量和發機單機也隨之增大,操作大大復雜化。
  19. In this article, a 74500dwt bulk carrier being built in our shipyard is taken for example. based on the calculations for the capacity required, two generator sets and a shaft generator are arranged for the power station on this ships. analyses are made on different units of each generator set, and some reliability tests have been carried out at the same time

    本文通過對工廠建造的74500t散裝貨輪電站容量的計算,配置了兩臺柴油發機組,並在主機的後部中間軸上安裝了一臺軸帶發機,並對各發機組的各個環節進行分析,進行必要的可靠性試驗,並確定運行過程中的維修方案,從而確保船舶的正常可靠運行,而簡單的操作方法、簡便的維修、運行的低消耗,體現了該船舶的實用性。
  20. Two tariffs are gradually being carried out in the electric systems, and marginal capacity cost and marginal quantity cost are regarded as capacity price and quantity price and are used to calculate hydroelectric economic benefit

    考慮目前力系統中正在逐步推行的兩部制價(價與價) ,研究中分別計算了已運行水最優等效替代位置的邊際成本和邊際成本,並將其分別作為已運行水優化運行中各時段(刻)經濟效益計算的價格與價格。
分享友人