電站組件 的英文怎麼說
中文拼音 [diànzhànzǔjiàn]
電站組件
英文
powerhouse module- 電 : Ⅰ名詞1 (有電荷存在和電荷變化的現象) electricity 2 (電報) telegram; cable Ⅱ動詞1 (觸電) give...
- 站 : Ⅰ動詞1 (站立) stand; be on one s feet 2 (停下來; 停留) stop; halt; pause Ⅱ名詞1 (停車點) st...
- 組 : Ⅰ名詞1 (由不多的人員組成的單位) group 2 (姓氏) a surname Ⅱ動詞(組織) organize; form Ⅲ量詞(...
- 件 : Ⅰ量詞(用於個體事物) piece; article; item Ⅱ名詞1. (指可以一一計算的事物) 2. (文件) letter; correspondence; paper; document
- 電站 : power station電站船 generating ship
- 組件 : assembler
-
Because of the technical complexity of the turbine for the three gorges project and on the basis of several important technical problems which have been defined in the international bidding documents for 14 generating units in the left bank power station, the owner of the project has decided another some important technical problems based on appraisal and comparison in the bid appraisal stage after the bidding documents are analyzed and the tender documents are cleared by the tenderers
由於三峽工程水輪機技術上的復雜性和挑戰性,在左岸電站14臺機組國際招標文件已明確了若干重大技術問題的基礎上,在機組議評標階段,對招標文件進行分析和投標商對投標文件進行澄清說明后,經評議比選,業主又決策了幾個重大技術問題,主要有:水輪機設計水頭的確定,負傾角葉片水輪機的應用,兩套水力設計,舍棄初期轉輪,蝸殼進行水壓試驗等。As one kind of key equipment in piping work of large - scale turbo - generator set in power plant, the machine is especially applicable to various welding bevels, flat end and angle of outer & inner diameter of ascending pipe, elbow pipe, bend, flange and etc., which greatly meets demands in pipe processing of construction site and manufacturers
本機床是電站大型汽輪發電機組的管道施工的關鍵設備,對直管、彎管、彎頭、法蘭等管體的各種型式焊接坡口,端平面,內外徑過緩斜度及直口,能滿足施工現場和製造廠家對各種管件的加工要求。After many years of civil construction and facility renovation, shmp become a modern large enterprise with complete management organization, strong technical ability, sufficient manufacturing facility, advanced procedure, perfect testing method to finish design and manufacturing of heavy equipment for power industries, metallurgy and rolling industries, forging and pressing industries, minery and cement industries, water conservancy, and also high quality heavy casting and forging
我公司經過多年的基本建設和技術改造,現已成為一個組織管理機構健全,技術力量雄厚,加工設備齊全,工藝手段先進,測試方法完善,可以獨立設計、製造大型電站、冶煉、軋鋼、鍛壓、礦山、水泥建材設備和大型優質鑄鍛件的現代化大型企業。The transformer substation survived the blast with relatively minor damage to the essential components.
經爆震波襲擊后未被毀壞的變電站的重要組件受到較小的損壞。Superfine eva encapsulation system with multilayer backsheet, assembly by advanced al - frame around, can effectively resist humidity and seawater erosion
太陽能電池組件能有效滿足不同用途的客戶需求,包括家庭太陽能發電系統、工業太陽能發電、邊防站、海島、牧場、山村等。Nuclear power plant air - cleaning units and components
核電站空氣凈化組件和元件Meet various requirement from dients, including solar power system for home using, industrial solar power station, frontier defence station, island, farm, remote village, etc
太陽能電池組件能有效滿足不同用途的客戶需求,包括家庭太陽能發電系統、工業太陽能發電、邊防站、海島、牧場、山村等。The reactor protection system reliability analysis of daya bay npp is an important branch of the probabilistic risk assessment project of daya bay nuclear power plant. the purpose of probabilistic risk assessment of reducing reactor trip is to discover all the signals and the components which can result in reactor trip potentially, to assess the safety and reliability of systematic design, to find the potential design drawbacks and take effective measures to reduce such events
大亞灣核電站反應堆保護系統是大亞灣核電站pra項目的重要的一個分支,大亞灣核電站減少緊急停堆pra (概率安全分析)是要找出各種可能引起機組緊急停堆的信號和部件,評價系統設計的安全性和可靠性,找到可能存在的設計缺陷,採取有效的防範措施,減少此類事件。Through repairing the worn parts of four hydropower stations of xinzhuang, zaoqi, suide and qiemo, and taking some comprehensive anti - abrasion measures, such as checking and repairing the runner blade, cutting the head of blade into round shape, adding an apron to the outer edge of blade and increasing a guiding plate in the head of blade, a good effectiveness has been gained so that it increases the output of generating unit and enhances the abrasion resistant capacity
通過對新莊、棗渠、綏德、且末4個水電站的磨蝕破壞部件的修復、轉輪葉片測型與修型、葉片頭部割圓角、葉片外緣加裙邊、頭部加導流板等抗磨蝕措施的綜合治理,取得較好效果,使機組出力增加、抗磨蝕能力提高。Spreadsheet component is a web control that allows your web site visitors to enter text and numbers into a worksheet
電子表格組件允許web站點的訪問者將文本和數據輸入工作表。Qualification of class 1e connection assemblies for nuclear power generating stations
核電站1e級連接組件的鑒定Standard for qualification of class 1e connection assemblies for nuclear power generating stations
核電站1e級連接組件的質量鑒定標準And then, the paper simulates the work status and the failure status of each component in photovoltaic station, and puts forward the criterion to repair photovoltaic array, and calculates reliability indices of the stand - alone pv system
接著本文運用蒙特卡羅序貫的方法,模擬了光伏電站內部各元件的工作及故障檢修的順序,提出了陣列組件的檢修判據,並模擬計算了獨立光伏系統工作的各項可靠性指標。It just pursued net - site design and realized transaction in line. enterprise need charge all of business in line by virtue of outside service institution or inside specialized ec sector. the new application ca n ' t share information with the existing system, or develop groupware at the same time, or integrate unitive database
以往這方面的研究總是偏重於電子商務方面,往往脫離了企業內部信息系統建設,片面的追求網站的設計和網上交易功能的實現,常需要藉助外部各類服務功能體系或成立專門的電子商務部門專門主管一切事務,無法直接與內部信息系統間實現信息共享,組件開發和集成,集中統一數據庫。The geologic condition of side slope is complex. it is composed of soil and intense weathering rock on the surface and slightly weathering rock under the surface. further more, it has many faults, fissuring and weak intercalations
其水電站尾水渠高邊坡所處區域地質條件復雜,邊坡表面由幾米至十幾米厚的坡積土和強風化破碎巖石組成,下部是弱風化和微風化巖石組成,且斷層、節理和軟弱夾層分佈廣泛。Ganfa has over 50 years experience of designing and manufacturing and has many items of patent techninque. the synchronous generators and permanent magnet generators which are manufactured with advanced technology and excellent machining equipement, will be able to meet the requirement of different technical condition which matched with various type turbines. ganfa has manufactured the generators of 0. 1 to 20mw in capacity which have been put into operation at present and owns the capability to manufacture the following generators : the capacity per unit up to 180mw, the stator outer diameter of generator up to 9, 000mm, the speed of vertical type generator up to 750r min, and thespeed of horizontal type generator up to 1, 500r min, both the b - grade and f - grade insulation class, the terminal voltage can up to 13. 8kv. ganfa manufactured 34, 500kw water turbine generator sets for the donghewan power station, yongchang, gansu, china which is located in 2. 868. 5m height above sea level, and has successfully solved the difficult problems such as plateau corona - shielding. ganfa is equipped with the generator test station and insulation material laboratory which are advanced test facilites and testing means to make each item electrical performance of products meet designing requirements from purchasing to delivering
公司具有50年的設計製造經驗,擁有多項專利技術,生產的同步發電機永磁機技術工藝先進,製造精良,能滿足與各式水輪機配套的不同技術條件要求。目前公司已製造投產的發電機容量范圍為0 . 120mw ,具備生產單擊容量50mw的能力,發電機機座號最大可達9000mm ,立式機最高轉速750r min ,臥式機最高轉速達1500r min ,絕緣等級有b級和f級,圈式線圈最高電壓達13 . 8kv ,公司製造的甘肅永昌東河水電站34500kw水輪發電機組,海拔為2868 . 5m ,成功解決了高原防暈等難題。公司擁有電機試驗站絕緣材料試驗室等先進的實驗室設施和測試手段,使產品從原材料進產,到成品出產的各項電器性能測試均能滿足設計要求。If you register for a newsletter, log on to certain who sites, order a book, request information, provide feedback, apply for a job, join a discussion group or join an electronic mailing list, you will be asked to provide personal information such as your name, postal address and e - mail address
如果你登記訂閱一份通訊、登錄特定的世界衛生組織網站、訂購書籍、索取信息、提供反饋、申請就業、參加一個討論組或參加一個電子郵寄清單,將要求你提供個人信息,例如姓名、郵寄地址和電子郵件地址。Asme boiler pressure vessel code - section 11 : rules for inservice inspection of nuclear power plant components ; 2005 addenda july 1, 2005
Asme鍋爐和壓力容器規范.第11部分:核電站組件在使用中進行檢驗的原則.補充件2005It is therefore necessary to have an accurate knowledge of low - cycle fatigue ( lcf ) behavior demonstrated by zirconium alloys in order to run the reactor safely, and it becomes in immediate need of the detailed knowledge when the new fuel assembly in request is being developed to reduce the cost of nuclear electricity
因此,要保障核電站水冷動力堆的安全運行,就要對鋯合金的低周疲勞行為有詳盡的了解和認識。特別是當要求研製新型高性能的燃料組件以降低核電成本時,對鋯合金低周疲勞行為的研究就顯得尤為迫切。According to the characteristic of nine - area diagram of substation vol / var coordinated control, this system gives the defination of fuzzy sets and the degree of membership of input / output variables, and designs corresponding control rules. the results of simulation demonstrate the system can satisfy the constrains of the day - adjusting times of the switching of on - load transformer and paralleled compensation capacitors, and ensure voltage quality, reactive power basical balance. considering the var requirement in different load time period and the control demand in load saltation, a improved control scheme is provided. the results of simulation show the improved scheme can meet the demand of vol / var in different load time period, protect the wrong operation when either voltage or reactive power appears saltation, and decrease the times of regulation of the switching of on - load transformer and paralleled compensation capacitors finally, a background software module of substation vol / var coordinated control is designed, based on the supervisory control and data acquisition system of substation
模擬結果證明該系統能在各種負荷條件下確保電壓合格和無功基本平衡,且能滿足變電站對有載調壓變壓器分接頭日調節次數和並聯補償電容器組的日投切次數的限制。通過考慮不同負荷時段對無功功率的需求和負荷突變情況下的控制要求,對上述模糊控制策略進行了改進,模擬結果證明改進后的控制策略能滿足不同負荷時段對電壓和無功的要求、抑制電壓或無功突變情況下的誤動作,且有效地減少了有載調壓變壓器分接頭和並聯補償電容器組的調節次數。最後基於變電站scada系統設計了一后臺電壓無功綜合控制軟體模塊。分享友人