頂面板 的英文怎麼說

中文拼音 [dǐngmiànbǎn]
頂面板 英文
topanel
  • : i 名詞(人體或物體的最上部) crown; peak; top Ⅱ動詞1 (用頭支承) carry on the head 2 (從下面拱...
  • : Ⅰ名詞1 (頭的前部; 臉) face 2 (物體的表面) surface; top 3 (外露的一層或正面) outside; the ri...
  • : Ⅰ名詞1 (片狀硬物體) board; plank; plate 2 (專指店鋪的門板) shutter 3 [音樂] (打拍子的樂器) ...
  • 面板 : [機械工程] face plate; panel; panel board; frontpanel; face ply [veneer]; surface veneer; skin pl...
  1. In the process of work, according to complex geological conditions such as huge thick soft clay in site and top surface of possible pile foundation supporting course fluctuating in large amplitude, we adopted many advanced exploratory methods ( just as high accuracy exploration of shallow earthquake, crosshole wave velocity test, vane shear test, pressuremeter test, etc. ), we found out that there is an ancient groove of yangzi river in former plant site, therefore we suggested in time that plant site should properly be moved eastwardly, only this item saved nearly about 50 million for pile foundation project cost

    在工作過程,根據廠址區軟粘土厚度大、可能作為樁基持力層起伏變化大等復雜地質條件,採取了多種先進的勘探手段(如高精度淺層地震勘探、跨孔波速試驗、十字剪切試驗、旁壓試驗等) ,查明了原廠址區存在一個長江古凹槽,並及時建議廠址適當東移,僅次一項就節省樁基工程費用近5000萬元。
  2. 2 both the hanging wall and the footwail rock of ore bodies are garnet biotite schist, protoliths are alkaline volcanic rocks ( tracyh andesite ). according to characteristics of trace elements assemblages and the setting of tectonics, these alkaline volcanic rocks were derived from the lower degree melting of metasomatic and enriched mantle ( eml ) in the initial stage of middle proterozoic epoch. they strongly enriched in large ion lithophile elements ( lile ), such as ba

    2 、礦體、底圍巖(石榴石黑雲母片巖、鈉長黑雲母片巖等)的原巖為堿性火山巖(粗安山巖) ,相對富集大離子親石元素ba 、 cs 、 rb 、 k 、 lree及貧zr 、 sr 、 ti 、 hf 、 hree ,為早元古代末期-中元古代早期交代富集地幔低程度部分熔融所形成的堿性火山巖。
  3. The main elevator parts which we can provide are below : controller , gearless machine, led ceiling, interphone cop ; and the designing and manufacturing for some special ( luxury type ) cabin

    我公司提供的主要電梯部件有:控制櫃、主機、 led吊、對講機、操作及特殊(豪華型)的轎廂的設計和製造。
  4. Yuanfeng new building material co., ltd. is one of the biggest thermal insulation material producers in south china with annual output at 2 million square meters. established in 2000, the water - proof roof laminboard, purifying laminboard and other products made by the company are widely used in roof and wall panels for big span structure factory building, exhibition hall, purifying workshop, warehouse, combined house, indoor partition, building top attachment, refrigerator, automobile painting room, refrigeration frame and other buildings

    源鋒新型建材有限公司是華南地區最大的隔熱材料生產廠家之一,年產量達200萬平方米,始創於2000年,所生產的防水屋夾芯、凈化夾芯等產品廣泛用於大跨度結構廠房、展館、凈化車間、倉庫、組合房屋、室內間隔、樓加層、冷庫、汽車?漆房、製冷風櫃等建築的屋及圍墻等方
  5. Software design includes the following : firstly stb part - bottom drive : including front - end drive, flash drive, the receiving software of the front board key - press and remote control signal

    盒部分底層驅動程序,包括:前端驅動、 flash驅動、前按鍵接收軟體和遙控信號接收軟體等。
  6. Fire test standard for class 1 : a insulated wall or walls and ceilings or roofs ; b plastic interior finish materials ; c plastic exterior building panels ; d wall and wall and ceiling coating systems ; e interior or exterior finish systems

    1級防火試驗標準: a絕緣墻或墻壁和天花或屋; b塑料內部終飾材料; c塑料外部建築; d墻和墻和天花塗覆系統; e內部或外部終飾系統
  7. Adhesives for wall and ceiling boards

    和吊用粘合劑
  8. The pattern of the roof deck panels should be set out in accordance with the design of the finish mosaic tile layout in order to minimize clashes between the open joint lines and the mosaic tile joint lines

    為減小開放介和馬賽克瓷磚接縫的沖突,樓的圖案應按照完工的馬賽克瓷磚的布局來進行安排。
  9. Then, it summarizes the present situation of geophysical methods, and presents an introduction to some methods such as mine direct current method, mine transient electromagnetic method and geological radar exploration

    本文簡要介紹了我國煤礦生產的發展趨勢,說明地質構造及煤層、底水問題是當前煤礦深部開采中所臨的主要地質問題。
  10. Use electrical lift on the feeding table. top of the board and feeder are maintain at the same level, easy for feeding

    送紙臺採用電動升降裝置,使紙與進紙口保持同一高度,便利於送紙。
  11. Horizontal construction joint shall be set at the top of the slab

    5施工縫留設:水平施工縫留置於
  12. Steel furrings for wall and ceiling in buildings

    建築物中墻和棚用鋼制罩
  13. Guided with the theories of plate tectonics and complex hydrocarbon system, based on the analysis of geological factors of hydrocarbon pools in the northern area of tarim basin, the author puts forward the geological background favorable for and the possible areas most suitable for the formation of complex traps. the identification and description of complex traps lead to the recognization of five large and four middle or small complex traps, by the means of the main techniques and methods include the detailed interpretation of seismic profiles, drilling, logging, map compiling based on the depth of sealing surface and on the superimposed relation of stratigraphic lithology over and beneath the unconformity surfaces, and the the use of the reversion of jason and 3d coherent data. at the same time, the major controlling factors of complex trap oil pool have been analyzed based on the case study of typical oil pools in the paper

    目前,復合圈閉勘探及研究工作在我國還比較薄弱,本文以塊構造學、復式含油氣系統等理論為指導,通過對塔北地區石油地質特徵的整體解剖,從動態的角度,綜合分析和探索了塔北地區復合圈閉形成的地質背景及發育的有利區帶和領域,根據鉆、測井及地震剖精細解釋成果,採用封閉編圖、不整合地層巖性疊置關系編圖方法和jason及三維相干數據體等地球物理反演技術,發現大型復合圈閉顯示2個,中小型復合圈閉4個,復查落實大型復合圈閉3個,並通過典型油氣藏解剖,分析了塔北地區復合圈閉成藏主控因素分析。
  14. Research of the mine electricity penetration method

    礦井瞬變電磁法探測工作含水構造
  15. The wuhan university of technology and dongzhou sfrc inc bring forward lsfrc pavement together. lsfrc pavement is a type of new composite pavement by putting certain quantity of steel fiber in the bottom and top of the pavement

    該路是在普通混凝土路的底部和部一定厚度內撒布一定量的鋼纖維鋪築而成的路,是一種新的復合路形式。
  16. And it can be concluded that cracks on top floor ' s walls are caused by the temperature difference between floor or wall ' s inner and outer surface and the temperature difference between floor and walls. if the floor and wall ' s thermal resistance is appropriate, the cracks issue on cscbb can be solved

    分析表明,砌體建築層墻體的裂縫主要是墻體、屋內外表溫度差異和屋、墻體之間的溫度差異所致,因此如果墻體和屋的保溫隔熱措施合適,砌體建築的溫度裂縫問題是可以解決的。
  17. Standard specification for non - asbestos fiber - cement roofing shakes, shingles, and slates with designed varying profiles and thicknesses

    設計成可變輪廓和厚度的無石棉纖維水泥屋和石的標準規范
  18. Corrugated sheets and roofing sheets, surface coated - dimensions, masses and static values

    鍍塗的波紋薄材和屋材.尺寸質量和靜壓
  19. Installation of a roof, din socket installation, the installation of pcb sockets or face planting installation

    部安裝din插座安裝pcb插座安裝或插座安裝
  20. Roofs must be given sufficient fall to drain water off quickly and adequate gutters formed in the concrete to discharge the water in heavy storm

    必須有足夠的坡度,以利迅速排水,同時混凝土屋必須有足夠的雨水槽,以利暴雨時排水。
分享友人