預備工做 的英文怎麼說

中文拼音 [bèigōngzuò]
預備工做 英文
preparations
  • : Ⅰ副詞(預先; 事先) in advance; beforehand Ⅱ動詞(參與) take part in
  • : Ⅰ動詞1 (具備; 具有) have; be equipped with 2 (準備) prepare; provide with; get ready 3 (防備...
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • : 動詞1 (製造) make; manufacture; produce 2 (寫作) write; compose 3 (從事某種工作或活動) do; ...
  • 預備 : prepare; get ready
  1. Dundrum, south, or sutton, north, both localities equally reported by trial to resemble the terrestrial poles in being favourable climates for phthisical subjects, the premises to be held under feefarmgrant, lease 999 years, the message to consist of 1 drawingroom with baywindow 2 lancets, thermometer affixed, 1 sittingroom, 4 bedrooms, 2 servants rooms, tiled kitchen with close range and scullery, lounge hall fitted with linen wallpresses, fumed oak sectional bookcase containing the encyclopaedia britannica and new century dictionary, transverse obsolete medieval and oriental weapons, dinner gong, alabaster lamp, bowl pendant, vulcanite automatic telephone receiver with adjacent directory, handtufted axminster carpet with cream ground and trellis border, loo table with pillar and claw legs, hearth with massive firebrasses and ormolu mantel chronometer clock, guaranteed timekeeper with cathedral chime, barometer with hygrographic chart, comfortable lounge settees and corner fitments, upholstered in ruby plush with good springing and sunk centre, three banner japanese screen and cuspidors club style, rich wine - coloured leather, gloss renewable with a minimum of labour by use of linseed oil and vinegar and pyramidically prismatic central chandelier lustre, bentwood perch with a fingertame parrot expurgated language, embossed mural paper at 10 - per dozen with transverse swags of carmine floral design and top crown frieze, staircase, three continuous flights at successive right angles, of varnished cleargrained oak, treads and risers, newel, balusters and handrail, with stepped - up panel dado, dressed with camphorated wax, bathroom, hot and cold supply, reclining and shower : water closet on mezzanine provided with opaque singlepane oblong window, tipup seat, bracket lamp, brass tierod brace, armrests, footstool and artistic oleograph on inner face of door : ditto, plain : servant s apartments with separate sanitary and hygienic necessaries for cook, general and betweenmaid salary, rising by biennial unearned increments of 2, with comprehensive fidelity insurance annual bonus, and retiring allowance based on the 65 system after 30 years service, pantry, buttery, larder, refrigerator, outoffices, coal and wood cellarage with winebin still and sparkling vintages for distinguished guests, if entertained to dinner evening dress, carbon monoxide gas supply throughout

    一截彎木上棲著一隻馴順得能停在手指上的鸚鵡它吐字文雅,墻上糊著每打價為十先令的壓花壁紙,印著胭脂紅色垂花橫紋圖案,頂端是帶狀裝飾一連三段櫟木樓梯,接連兩次拐成直角,都用清漆塗出清晰的木紋,梯級登板起柱欄桿和扶手,一律用護板來加固並塗上含樟腦的蠟浴室里有冷熱水管,盆湯淋浴,設俱全。位於平臺246上的廁所里,長方形窗子上嵌著一塊毛玻璃,帶蓋的坐式抽水馬桶,壁燈,黃銅拉鏈和把手,兩側各放著憑肘幾和腳凳,門內側還掛有藝術氣息濃厚的油畫式石版畫。另外還有一間普通的廁所廚師打雜的女僕和兼些細活的女傭的下房裡也分別裝有保健衛生設僕役的錢每兩年遞增兩英鎊,並根據一般忠誠勤勞保險,每年年底發獎金一英鎊,對滿三十年者,按照六十五歲退職的規定,發退職金餐具室配膳室食品庫冷藏庫主樓外的廚房及貯藏室等堆煤柴用的地窨子里還有個葡萄酒窖不起泡亮光閃閃的葡萄酒,這是為宴請貴賓吃正餐身穿夜禮服時的。
  2. Simplify work procedures and use different ways to save energy while doing daily housework. for example, you can sit down to do work like ironing, folding clothes and meal preparation etc

    用簡單及節省體力的方法,減輕體力的消耗,例如坐下來某些序,例如坐下燙衫摺衣服菜等。
  3. To make a success of the work, it is necessary for us to change the traditional ideas, take the practicable implement approaches and strengthen the continuing education for the probationary party members

    好重心下移作應轉變傳統觀念,有可行的操作方法,並加強對黨員的繼續教育。
  4. The hospital authority must highly pay attention to the emergency rescue responsibility focusing on personnel training and organization and to have more financial inverstment to set up a well first aid network. the equipment and technology should be up - dated for this purpose. strategic training and technical preparation must be ready for emergency calls and instant response is required at all times around. finally, medical research should also be carried out to ceaselessly improve the potentiality of hospital first aid ability

    指出醫院必須高度重視救援作,健全組織,建立嚴格的應急救援網路和救援案;增加專項投入;更新救援裝,強化應急救援的技術、戰術訓練,切實到人員、裝、物資、技術準充分,平戰結合,常不懈,靈活機動,快速反應;同時還應大力開展救援醫學研究,不斷提高應急救援能力和水平。
  5. As it is difficult to engage linguists, preparatory work can be done first, such as looking for different translation options for each term

    找到語言學家參與作比較困難,因此可以先一些作,例如查找每個術語不同的翻譯方式。
  6. Your cover letter shows that you ' ve done your homework, and you have all the qualifications we ' re looking for

    你的說明信表明你先的準作並且具我們需要的一切資質條件。
  7. Before protection spot works, what preparation work should do

    繼電保護現場作前,應哪些作?
  8. The weapons and equipment maintenance operation management is not only makes the tracking and the management on the equipment state information, but also includes to has maintained the technical personnel resources the balance, the maintenance correlation operation management, maintains the management, maintenance components supply demand work and so on condition realignment, equipment preventive maintenance which the part kept in stock makes the overall situation the decision and the management

    武器裝的維修作業管理並不是只就裝的狀態信息作跟蹤和管理,還包括了對維修技術人員資源的平衡、維修相關作業的管理、維修零件庫存的管理、維修零件的供應需求狀況的調整、裝防保養等出全局的決策和管理。
  9. In order to make a healthy and smooth progress for the " three simultaneity " work, all local agencies and enterprises concerned, at present, should continue to carry out safety responsibility system, strengthen treatment of hidden accidents and supervision of the " three simultaneity " construction projects and earnestly perform review and registry work for safety pre - evaluation report and safety acceptance appraisal report

    為促進電力建設項目「三同時」作健康有序發展,當前,各地和各有關企業要繼續抓好落實企業安全生產主體責任、加大事故隱患整改力度、加強對建設項目「三同時」作的監督指導,以及好安全評價和安全驗收評價報告的評審作。
  10. Microscopic safeguard mechanism includes : establishment of the organizations and agencies repaying loans ; the mechanism of the risk early warning ; completing the engineering project the risk management

    水利利用外資項目還貸的微觀保障機制包括:建立還貸組織機構;建立還貸準金;建立還貸風險警機制;好水利程項目的風險管理作。
  11. According to conference dimensions, define conference budget, amount of meeting wu personnel ; assembly room of make choice of, decide time of conference report, formal meeting ; do good assembly room to decorate, the conference is recieved, the respect such as assembly room service intends the work ; connection solves the problem such as the bed and board that joins meeting staff, traffic

    根據會議規模,確定會議算,會務人員數量;選定會場,確定會議報道、正式會議時間;好會場布置、會議接待、會場服務等方面作;聯系解決參會人員的食宿、交通等問題。
  12. What preparation work does the school before choosing a course, institute basically do

    選課前學校、學院主要哪些作?
  13. While the doctors were busy making final preparations, the little pig shivered and trembled as if it had sensed the danger

    醫生正在緊張地著最後的準作,一旁的小豬在那裡瑟瑟發抖,好象已經感到了危險。
  14. In this module, we focus on an improved 2 - d median - filter and a real time edge detect algorithm which has very regular computational structure. in chapter 4, we use fpga to capture the image data from infrared sensor and create the synchronization signal and output the video to monitor. chapter 5 describes the design of communication interface between dsp, fpga and missile control system, and focus on a new verilog description style called cycle accurate, and finally we design an i2c bus using this description style

    本論文按照處理機的作流程,首先討論fpga與視頻探測器之間的數據通訊模塊的設計,接著介紹了圖像處理模塊,在處理模塊中,重點介紹了一種改進的二維中值濾波方法和一種特別適于硬體實現的邊緣檢測演算法;在第四章,討論了用fpga實現圖像獲取和模擬視頻輸出;第五章,討論了fpga與dsp之間以及fpga與彈上機之間的通訊模塊的設計,接著重點研究了一種新的verilog語言的描述風格,並用此寫法在上fpga實現對外圍設的初始化模塊;最後,對本文所作進行了總結。
  15. It aims at encouraging participants to develop a spirit of adventure and discovery through ventures involving self - reliant journeying in the countryside, on waterways or at sea, conceived with a purpose

    活動前應能未雨綢繆,仔細留意旅程的細節及及統籌的作;活動中應能分合作,從而鍛煉領導能力、合作性及自立性。
  16. Before embedding of the foundation and embedment parts, technical clarificaiton will be don by the engineer in charge and the working group on the basis of design drawing 、 installation documentation 、 design amendment notification and supervision nofification 、 the principle of no impeded the progress schedule 、 the requirement of the relevant regulations and specification, setting out the embedment locaiton applied by the theodolite 、 water level and tape after that carrying on the embedment process and the record will be well kept

    以設計圖紙、設安裝資料及設計修改通知單和監理通知單為依據,按規程規范的要求,以不影響程進度為原則,由主管程師對施班組進行技術交底,利用經緯儀、水準儀和捲尺等測量具放點定位進行基礎及埋件埋並埋記錄。
  17. The project is part of beijing ' s municipal tourism administration ' s preparation for the olympic games next year, when at least 500, 000 foreigners are expected to visit

    這項活動是北京市旅遊局為迎接明年奧運會所的準作之一,屆時,計將有至少50萬名外國遊客來北京觀光。
  18. Pre - activity cost control method employing the theory and method of financing accounting cost control and combining with the reality of liaohe oilfield, we propose the eight preparations for developing crude oil cost control regulations and crude oil fixed cost controlling method and operating cost controlling method. the fixed cost will be controlled mainly by the method of budget controlling method while six out of the fifteen operating cost will be controlled by pre - activity control and the remaining nine operating cost will be pre - activity controlled by flexible budget method

    事前成本控制方法。主要是應用財務會計成本控制理論和方法,結合遼河油田實際,研究提出了制定原油生產成本控制制度前應的八項準作,制定了遼河油田原油固定成本控制方法和操作成本控制方法。固定成本主要是採用算控制方法,操作成本主要是對15項操作成本中的6項採用標準成本進行事前控制,對15項操作成本中的其他9項採用彈性算方法進行事前控制。
分享友人