預先磁化 的英文怎麼說
中文拼音 [yùxiāncíhuà]
預先磁化
英文
premagnetization-
On the base of the analysis on the advanced technology of hard ferrite in foreign country, the main procedures of preparing hard ferrite pre - sintering material are determined as follows : first, the ferrite oxides coming from the main cold rolling line and strontium carbonate are conveyed to storage tank by gas power and weighed automatically according to the demands of constituent composition. and then they are mixed and grinded by using method of wet treatment. finally the mixtures is transported to the devices of storage by transporting pump
在分析國外先進的永磁鐵氧體生產工藝的基礎上,確定了生產高檔永磁鐵氧體預燒料的主要過程:首先,利用攀鋼冷軋鐵紅為主要原料,將氧化鐵紅及碳酸鍶採用氣力輸送至貯料料倉,經自動稱量裝置,按工藝配方稱量後分別由氧化鐵紅及碳酸鍶發送罐氣力輸送進入預混攪拌筒加水攪拌,然後再送入混磨機濕法混磨;最後,混合物經輸送泵輸送至料漿存儲裝置,經定量進料泵定量輸送至回轉窯進行濕法預燒,預燒料經緩冷至室溫后,再球磨。Based on netomac, a software package for power system simulation, the model and algorithm of pre - dispatch schedule in generation markets, excitation system parameter setting, and power system small signal stability anaylsis are studied in this thesis. the main work is as follows : a model of pre - dispatch schedule is proposed, whose target is to minimize the market purchasing price ( mpp ) in the whole pre - dispatch period. then according to the characteristics of pre - dispatch schedule, the model of pre - dispatch schedule is simplified to minimize the mpp in each pre - dispatch time, and a three - step algorithm of pre - dispatch schedule is designed : dealing with the optimal problem in the whole period of pre - dispatch with static planning method, solving the problem of combination of machines with pr1 method, resolving problem of optimal power flow ( opf ) with modified powell method
本文基於netomac模擬軟體,以發電市場預調度計劃模型及演算法、勵磁系統參數整定和電力系統小擾動穩定性分析為研究內容,主要做了以下工作:建立了以整個預調度計劃周期內的市場購電價格最小為目標的發電市場預調度計劃模型,並根據預調度計劃問題狀態數多、變量多、混合整數、非解析的特點,將預調度計劃模型的目標函數簡化為各時段的市場清算電價最小,設計了三段式預調度演算法:用靜態規劃法求解整個預調度計劃周期內的優化問題;用優先級法求解機組組合問題;用改進的powell法求解最優潮流問題。Many data such as m / g, em and seismic have been arranged, processed and interpreted in shengli oilfield, in which, the interpreted data ( 2 - d ) are 64 lines with 1800km. the techniques such as integration of process and interpretation, joint interpretation of m / g, em and seismic, variable velocity mapping, pressure prediction, constraint inversion without well and special process have been applied. the comprehensive researches on geology and physical exploration have been carried out in the whole block
該區油氣勘探始於50年代,勝利油田在該區塊先後部署、處理、解釋了重、磁、電、震等多種資料,其中解釋地震資料( 2d ) 64條、 1800多公里,才用了處理解釋一體化、重、磁、電、震聯合解釋、變速成圖、壓力預測、無井約束反演、特殊處理等技術,對整個探區進行了地質、物探等綜合研究,發現兩個有利構造帶,落實了13個圈閉構造,提交了兩口探井井位。It is the very reason that many scientists try to make the prediction of geomagnetic storms by analyzing gcrs variation properties before the commencement of a geomagnetic storm
正是由於這個特性,國際上很多科學家試圖利用磁暴前銀河宇宙線強度變化的先兆特徵來進行地磁暴預報。分享友人