預應力張拉臺 的英文怎麼說

中文拼音 [yīngzhāngtái]
預應力張拉臺 英文
casting bed
  • : Ⅰ副詞(預先; 事先) in advance; beforehand Ⅱ動詞(參與) take part in
  • : 應動詞1 (回答) answer; respond to; echo 2 (滿足要求) comply with; grant 3 (順應; 適應) suit...
  • : Ⅰ名1 (力量; 能力) power; strength; ability; capacity 2 [物理學] (改變物體運動狀態的作用) forc...
  • : Ⅰ動詞1 [書面語] (給弓或樂器上弦) fix (a bowstring); string (a musical instrument) 2 (分開;...
  • : 拉構詞成分。
  • : 臺名詞(指臺州) short for taizhou (in zhejiang province)
  1. Products are : super high pressure electric, pneumatic, manual oil pump ; pre - stress jack for the use of coal mine and construction ; steel bar and cable scissor ; all kinds of bolt for safety supporting and bolting ( km19 and km22 bolt have all got the certificate of “ ma ” in china. ) ; cable anchor and bolt test stand ; hydraulic nut scissor and etc

    產品有防爆式超高壓電動、風動、手動油泵;煤礦、建築用千斤頂;鋼筋、鋼絞線切斷器;安全支護用各種錨具( km19 、 km22錨具在國內率先取得煤安證書) ;錨索錨具靜載伸試驗;液壓螺母破切器等。
  2. The tower shafts, most of which are hollow and varying in cross section, and altitudinal construction bring trouble to the form work and the stress of strand wire. and the cracks on the crossbeams will be caused by the following - deformation of the bracing structure joints, elastic deformation , uneven settlement and temperature changes. the additional stress of the base slab and the foundation is caused by the deviation of cable bent tower construction

    但大跨度橋梁混凝土索塔施工設備進場及現場管理都比較困難;塔柱多為空心變截面,且為高空作業,給模板工程及帶來一定困難;支撐系統連接的間隙變形、彈性變形、不均勻沉降以及環境溫差可導致橫梁裂縫;索塔施工偏位會引起的承和基礎的附加,對加勁梁的架設影響大;懸吊結構未完體系(架設時)施工階段的風致振動往往影響到施工的安全和質量;實心塔柱部分體積較大,易產生溫度裂縫。
分享友人