高水位量 的英文怎麼說

中文拼音 [gāoshuǐwèiliáng]
高水位量 英文
high water discharge
  • : Ⅰ形容詞1 (從下向上距離大; 離地面遠) tall; high 2 (在一般標準或平均程度之上; 等級在上的) above...
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ名詞1 (所在或所佔的地方) place; location 2 (職位; 地位) position; post; status 3 (特指皇帝...
  • : 量動1. (度量) measure 2. (估量) estimate; size up
  • 水位 : stage; water level
  1. In order to reduce the re - deposit volume of the dredged channel, the method must be based on decreasing the oncoming sediment, changing the mouth site, builting the sediment control dam and raising the reservoir level

    為了最大限度地減小疏浚挖槽的回淤,必須依靠控制上游來沙、調整入口門置、加設防淤堤及提等手段,而不能通過調整挖泥槽寬度、置及數等措施來達到目的。
  2. So this article analyses deeply in the method of ensur ' my designing food rolume which is an important element to affect the " designimy height of bridge " it brings forward an " arverage optiminmy suiting line " method which is a bondage discommode series at the same time it puts forward a ensurmy principle for rough coefficient " and " fallimy flood proportion which are both suitable to heilongjiang province at last this article introduces the " three - days rainimy rolume " method

    本文立足於黑龍江省各種河流的洪特點,結合以往工程實際,對影響跨河橋梁設計度的主要因素? ?設計洪及其相應洪的確定方法加以詳細分析。提出有約束不連序系列的加權優化適線法及適合於黑龍江省的河流粗糙系數和洪比降的確定原則,並介紹了三日降雨法。
  3. Hangzhou yuhang chengnan line factory organized in 1993, was located the beautiful hangjiahu plain of hangzhou yuhang disctrict linping town, the close neighbor no. 320 national highways and the huhang highway near linping exit, the geographical position superior, the transportation was extremely convenient, this factory area amounted to 2, 500 square meters, the floor space reaches 700 even aspects, at present the staff has 29 people, technical personnel had 3, the factory main equipment has the dye vat, the system line machine and so on the special - purpose supplementary equipment, the fixed asset more than 2 million yuan, at present main production ribbon product and so on black silk ribbon line, nylon line, real silk thread, produces high mainly sells to hangzhou, shanghai, and the peripheral locality, the product quality deeply user communities ' faith, this factory by the science management, the rich experience and the advanced technology and the craft, had guaranteed this factory product high level, the high quality, simultaneously continuously pursue the good prestige, take the customer demand foundation of as the enterprise survival, welcome the new old customer to come this factory service discussion, communal development

    杭州餘杭成楠制線廠創辦於1993年,於美麗的杭嘉湖平原杭州市餘杭區臨平鎮,緊鄰320國道及滬杭速公路臨平出口處,地理置優越,交通十分方便,該廠佔地面積達2500平方米,建築面積達700平方面,目前職工有29人,其中技術人員有3名,工廠主要設備有染缸、制線機等專用配套設備,固定資產200多萬元,目前主要生產絳綸線、尼龍線、真絲線等產品,產品主要銷往杭州、上海、及周邊地區,產品質深受廣大用戶的信賴,該廠以科學的管理,豐富的經驗及先進的技術和工藝,保證了該廠產品的平、品質,同時一直追求良好的信譽,以客戶的需求為企業生存之本,歡迎新老客戶前來該廠業務洽談,共同發展。
  4. At first, this paper analyzes the factors of water - sand influencing water level of yellow river and the feasibility just using the factors of water - sand to study water level, and collects the corresponding data ; secondly, because there are strong nonlinear relation in the corresponding data, by meticulous theory analysis, this paper integrates basic nonlinear analysis method, theory of random analysis, method of least squares and so on. it puts forward a method which can get the high accuracy simulation of the data, perfects the multi - factor analysis of variable ( over three factors ) of the statistic ; thirdly, it applies the method to the approximation of corresponding water level process which belong to the capacity of sand of middle - high and middle - low, and get the high - accuracy simulation about the typical nonlinear relation ; at last, this paper definitudes the main influence mode that the capacity of sand. it mainly unite with other factors to work on the water level in the yellow river lower reaches ; mor eover, this paper analyzes the difficult point and the direction of improvement to realize the accuracy forecasting of the flood level of erodible - bed channel

    首先,系統分析了影響黃河沙因素,及僅用沙因素有效研究的可行性,並按變對應思想採集它們的相應數據;其次,由於相應過程數據中含極強的非線性關系,本論文經細致的理論分析,將基本的非線性分析方法、統計建模方法、隨機分析理論、最小均方誤差原則等等數學理論及方法有機揉合,提出了能有效實現這類數據精度擬合的分層篩選法,並改進了統計學中多因子(三個以上)方差分析法;再次,將這一方法用於黃河中及中低含沙類洪相應過程的擬合,實現了這一典型非線性關系的精度擬合,各年汛期上下游相應洪過程的擬合誤差都較小;最後,明確黃河下游含沙的主要影響方式,即含沙主要是與其它因素聯合對作用;另外分析了要實現變動河床洪過程準確預報的困難所在及改進方向。
  5. Soil at field capacity has a high water potential

    土壤處於田間持時通常有很
  6. ( 4 ) the maximum water quantity becomes greater, the better is the filtering bed permeability, the higher the river hydraulic conductance, the higher the river level, the larger the water - collecting area and the bigger the distance between collecting pipes. the water quantity varies directly with drawdown

    ( 4 )濾床的滲透性能越好,河床力傳導系數越,河,取面積越大,取管之間的間距越大,則最大取越大;降深與取成正比關系。
  7. The flood damage exposes the contradiction between people and flood, population explosion results in that people need more and more land for farming, a lot of flood - plain, flood - plain protection, retarding basin, and ever floodway are occupied by farmers for agricultural purpose. so that major or even middle and small flood can not be smoothly discharged in the river

    這場洪災暴露了建國以來治淮工作中久而未決的一個問題,即局部地區為了解決人多地少的問題,大侵佔河道行洪灘地,與洪爭地,不給洪出路,使得本已不堪重負的河道,即使是中、小洪來臨,也處在狀況下運行,加劇了中、下游地區的防洪風險。
  8. One method of preventing seawater intrusion is to reduce offtake to a planned level.

    防止海入侵的一種方法是減少開采使其達到設計的地下
  9. Through the analysis of hydrological yeologys features by analyzing the gielding water of mining section, the critical value of waterhead, the critical thickness of water - resisting layer and othr hydrological geology factors concerned, the researches on the feasibility of the extraction of eastern mine area liyi mine at - 660m under ground with the menance of high - level limestone water have been done

    主要通過文地質特徵分析,從采區涌、臨界頭值及臨界隔層厚度及相關的文地質因素對李一礦- 660m平東翼采區在灰巖威脅下開採的可行性進行了研究。
  10. According to pump performance curve shown we can get that the distance h is changed with the rotate speed n in the same point q, and the flux q is changed with the rotate speed n in the same point h. from the curve we can get the rule that the distance and rotate speed are in direct with ratio at the same flux point, and the rotate speed and the flux are also in direct with ratio at the same distance point

    根據相似定律:流與轉速的一次方成正比;揚程與轉速的二次方成正比;功率與轉速的三次方成正比。即在降低轉速,調低泵出揚程的同時,功率下降的幅度非常大,從中可以節省相當大的電能。完全應在時降低泵機組轉速,從而使電機的輸出功率隨著轉速下降值與轉速原值商的三次方關系下降。
  11. At the same time, a lot of electrical energy is wasted when the level is high and the working curve is displaced. so urgent affairs are choosing right timing ways to rebuild the pumps. applying frequency conversion timing to wind machines and pumps is an important technology in our country

    設計都按照長江、漢百年一遇最低選擇泵出揚程,這樣在時往往由於揚程太大而偏離泵的工作效區,浪費了大電能,選擇合適的調速方式對泵船泵機組進行節能改造,成為當務之急。
  12. After registering sub - capacity offerings, itlm will monitor the use of all sub - capacity licenses via their part numbers and will record the monthly high water mark which represents the maximum copies of the sub - capacity supported product run concurrently

    在注冊隨需添加解決方案之後, itlm將通過他們的部件登記號監視所有隨需添加許可的使用情況,並記錄每個月的標記,這表示支持隨需添加的產品同時運行的最多副本數
  13. Based on the data recorded of the highest water level in the three survey stations of huangpu river, we give out the parameters estimates by using the eight estimate procedures mentioned above respectively, then we calculated corresponding values of likelihood and goodness - of - fit. we reach the conclusion that maximum - likelihood method performs better and more stable than the others

    本文基於黃浦江三個文觀測站的歷年最資料,分別利用這八種估計方法,求出了參數估計值,然後分別計算似然函數值和擬合優度度值w ~ 2 ,對這八種方法進行了比較分析。
  14. A water power generating facility makes use of the energy difference between two different levels of flowing water by transferring the water from natural bed of the stream at the higher level to the bed at the lower level and effectively extracting its potential energy, which is then made available at the rotor shaft for further use

    通過利用河流中不同之間的能來驅動螺旋泵的轉軸,在將流輸送到低的過程中汲取流中儲存的能,將其轉化成電能。
  15. ( 2 ) the water level ascending value effected by enclose tideland for cultivation dyke is reverse proportion to flows below 2000m ' / s, water level has surpassed the top of dam when flow is above 2000m3 / s, water level ascending value is declassing in the same flow level caused by enclose tideland for cultivation dyke

    ( 2 ) 2000m ~ 3 s以時,圍墾堤影響的值隨流增大而增大差逐漸減少,在2000m ~ 3 s以上時,已經超過圍墾堤堤頂,圍墾堤所引起的同級流值逐漸減少。
  16. The lining of a tunnel in the area with high groundwater table does not bear high external water pressure in - normal, the surrounding rock reinforced by intrusion concrete does it. in the case, the groundwater through reinforced rock accumulated in the space between lining and rock must be drained in time

    一般鐵路隧道通過區時,不用襯砌直接承受較的外壓力,要實現這個設計目標必須做好襯背的排工作,使通過加固圈滲透過來的及時排走,及時削減累積的
  17. Experimentation of sewage pumping station based on predictive control with vvvf is carried out. the experimentation result shows that the sewage pumping station predictive control system can be running under the condition of high water level. by using this control mode, inflow sewage is pumped out entirely

    在模擬研究基礎上,搭建了模擬試驗系統,在實驗室條件下,對污泵站排放系統進行了結合變頻調速的預測控制模擬試驗,試驗結果表明,採用預測控制,可以使系統運行在低揚程的工況下,使流入泵站管網的污排出,實現了節能無污的控制目標。
  18. For example, when the design flow of upward of the peace bridge of upward of the east - one main canal is 45m3 / s, the actual flow quantity is 23. 8m3 / s on the 30th of september in 1989, the water level of the transition region terminal of the mouth of hao wan flume of the east - one main canal had gained the design level of 4. 3m, and the level between downstream and shang tian yuan tunnel was generally higher. it says that the actual discharge capacity now is only about 24m3 / s which is half of the design value. this not only make the benefit of the irrigation district abnormal, but also greatly hinder the economic development of the irrigation district, and lead to the canal run frequently at small flow, high water level, lengthen the discharge duration

    如東一乾渠上段太平橋以上設計流45m ~ 3 s , 1989年9月30日實測通23 . 8m ~ 3 s時,東一乾渠郝灣渡槽出口漸變段末端已達到設計4 . 3m ,其下游至上天院隧洞也普遍偏,即東一乾渠上段目前僅能通過流24m ~ 3 s左右,只有設計值的50左右,不僅使灌區效益得不到正常發揮,嚴重阻礙了灌區范圍內的經濟發展,而且使渠道經常處于小流運行,延長了次通時間,大大增加了渠道工程的安全管理難度。
  19. Note 4 : installation dimension used in the cable and pole transmitter, if measuring range of well water - level is 10 m, installation dimension is 11 m, then extra 1 m use to installation regulating, actual measurement is 10 m and does not notice. cable type approves height regulation is 1 m pole type users should be detail noted the installation dimension

    注4 :安裝尺寸在纜式及桿式變送器使用,如測程10m安裝尺寸11m ,則多出1m作安裝調節用,實際測為10m ,不註明,纜式默認1m度調節,桿式用戶應詳細註明安裝尺寸。
  20. Note 3 : installation dimension used in the cable and pole transmitter, for example measuring range in water - level of well is 10 m, installation dimension is 11 m, then extra 1 m acts as installation regulating use. actual measurement is 10 m and does not notice. cable type approves height regulation is 1 m, pole users should be detail noted the installation dimension

    注4 :安裝尺寸在纜式及桿式變送器使用,如測程10m安裝尺寸11m ,則多出1m作安裝調節用,實際測為10m ,不註明,纜式默認1m度調節,桿式用戶應詳細註明安裝尺寸。
分享友人