龍編橋 的英文怎麼說

中文拼音 [lóngbiānqiáo]
龍編橋 英文
cau long bien
  • : Ⅰ名詞1 [動物學] (古代傳說中的神異動物) dragon2 (古代巨大的爬行動物) a huge extinct reptile:恐...
  • : Ⅰ動詞1 (編織) weave; plait; braid 2 (組織; 排列) make a list; arrange in a list; organize; gr...
  • : 名詞1. (橋梁) bridge 2. (姓氏) a surname
  1. Considering to the continuous rigid - frame bridge construction characteristic, putting forward the idea of reverse to optimize prestressed steel. according to different construction phases, the paper gets the formual of the cantalever phase, join two section of a bridge phase and the vertical prestressed steel, and works out corresponding program

    考慮大跨徑預應力混凝土連續(剛構)施工的特點,提出了基於倒裝方法的預應力靜定束、合束以及豎向束的優化設計理論,並制了相應的計算程序。
  2. The ansys, a kind of fea program, was used to build model of small carriage. the procedure of gantry beam bump with secondary beam of bridge was reappeared by running nonlinear calculation and loading program which was written by apdl program language. the closest deforming result was gotten, and the deforming of main beam, secondary beam and end beam and inner stress distribution status were calculated

    採用大型三維有限元軟體ansys對該起重機以及小車架等進行了建模、應用apdl語言寫加載程序、進行非線性計算,再現門橫梁與起重機副梁碰撞過程,最後得到與實際變形結果最接近的一種狀態,得出起重機架主梁、副梁、端梁的變形以及其內部的應力分佈情況。
  3. Abstract : the paper introduces the erection of the steel box girder of a long - span steel box - concrete composite bridge using broad double guide beam without affecting the normal operation of electrified railway and marshalling yard under the bridge, including construction plan, design of gantry crane and guide beam, as well as key points of construction technology

    文摘:介紹在保證電氣化鐵路、組站場正常運營情況下,運用寬幅式雙導梁解決大跨度鋼箱混凝土結合梁的鋼箱梁架設技術難題,重點闡述了施工方案,門吊、導梁設計,工藝要點等。
分享友人