bridge span 中文意思是什麼

bridge span 解釋
橋跨
  • bridge : n 1 橋,橋梁;【造船】艦橋,船橋。2 鼻樑;(假牙上的)齒橋;【音樂】弦柱,弦馬;【電學】電橋;【...
  • span : n 1 一?〈手指張開時,拇指尖至小指尖的長度,通常九英寸〉。2 (常有短的涵義的)一段時間;很小的間隔...
  1. As a new special bridge type, self - anchored suspension bridge has won more and more engineering ’ s favors with its beauteous build, economy performance and striving adaptability of geology and topography feathers. it has become a very competitive blue print of the urban bridge with the span from 100m to 400m

    自錨式懸索橋作為一種特殊的橋型,以其結構造型美觀、經濟性能較好、對地形和地質狀況適應性強等優點,越來越受到工程界的青睞,成為城市裡100 - 400m跨徑范圍內極具競爭力的橋梁方案。
  2. Design of half - through steel pipe bowstring concrete arch bridge of long - span, and knowledges to it

    大跨度中承式鋼管系桿混凝土拱橋設計和體會
  3. The great new orlean bridge represents modern contemporary long-span steel cantilever construction.

    新奧爾良大鋼橋表現出了現代大跨徑鋼橋懸臂施工的技術。
  4. Under the background of a long - span rigid - framed flexible cfst arch bridge, the catholicity method to compute the ultimate capacity is brought forward

    以某大跨度剛性梁柔性鋼管硅拱橋為例,總結了具有較普遍意義的大跨度橋梁極限承載力計算方法。
  5. The following are the large projects undertaking by haifeng company : crude oil electricity plant project of north china oil field hydroelectricity factory, apartment ( 22 stories ) of yuanda real estate company of dalian shipping group, helios hotel of helios group in dalian development zone, tilt aqueduct bridge of shanxi hongqi reservoir ( total span : 267m ), supply and sale building and city construction building ( both are antique architectures ) of shanxi heyang city, sea drainage pipe of hainan fudao fertilizer factory ( 1520 ), 8 oilgas docks of hainan haiyan oilgas company, basha condensable gas transfer station of haiyan company, 10, 000m3 oilgas storage tank of arco company ( usa ) in hainan nanshan, gas pipe and fuel gas installation project of hainan nanshan electricity co., ltd, base and accessory project of hainan gas company, bei da huang cereal and oil market in harerbin, hainan cross island pipe, changhuajiang river pipe crossing project, taihangshan mountain earthwork project ( the 19th section of west - to - east gas transmission project )

    海南海峰公司承建大的工程項目:華北油田水電廠原油發電站工程;大連船泊集團遠達地產公司的遠達公寓( 22層) ;大連開發區香港太陽神集團的太陽神大酒店;陜西紅旗水庫斜拉渡槽工程(全跨267m ) ;陜西合陽供銷大樓及城建大樓(均為仿古) ;海南富島化肥廠排海管線( 1520 ) ;海南海燕油氣公司八所油氣碼頭;海燕公司白沙液化氣中轉站;海南南山美國阿科公司儲油氣萬立米大罐工程;海南南山電力股份有限公司天然氣管線及燃氣安裝工程;海南南海天然氣有限公司基地及配套工程;哈爾濱北大荒糧油批發市場;海南環島管線;昌化江穿越工程;西氣東輸十九標段,太行山土石方工程。
  6. A case study for nanning bridge, the first long span unsymmetrical extroversion arch bridge with curve beam in the world is given

    利用幾何方法推導了空間鋼箱拱肋節段拼裝誤差在拱肋最大懸臂端的累積規律。
  7. Free vibration analysis of long - span suspension bridge scheme and effects of structure parameter

    既有橋梁的技術檢定試驗研究
  8. The spectacular vermilion orange span of the golden gate bridge

    這是橙紅色金門大橋橫跨海上的壯觀場面。
  9. With resonable calculating model and dynamic analysis method, the construction control elevation can be decided and so the precompression difficulty of support can be solved in the construction of large - span arched bridge

    採用精確的計算模型和動態分析技術,一次性給出施工控制標高,解決了大跨度拱橋有支架施工中支架需要預壓的問題。
  10. Erection of segmental bridge at viaduct c6 span 1

    正在進行安裝工作臺已完成的高架橋
  11. It was a steel bridge of a single span and there was a sentry box at each end.

    那是一座單孔鐵橋,兩端各有一個崗亭。
  12. The zhaozhou bridge built in the daye period ( 605a. d. -618a. d. ) of the sui dynasty ( 581a. d. - 618a. d. ), with a clear span of 37 metres and small arches within the main arch, was the earliest spandrel arch bridge and also the longest stone arch bridge in the world.

    中國隋朝大業年間(公元605-618年)建成的趙州橋,凈跨37米,主拱圈上敷設小拱,是世界上最早的空腹拱橋,也是當時世界上跨度最大的石拱橋。
  13. The stonecutters bridge, planned as a cable - stayed structure, will have a span of about

    昂船洲大橋屬斜拉橋式設計,跨距約為
  14. Construction technique of pressure filling concrete to still pipe inner arch of 75m span tie bar arch bridge

    系桿拱橋鋼管拱內混凝土的壓注施工工藝研究
  15. This paper presents the structural design of the main bridge of lhasa river bridge, makes a deep - going study of the key techniques for design of the bridge, such as the reasonable span length ratio of each span of the 5 - span girder and arch hybrid structure, mechanical behaviour of the dual arch ribs, and section of the continuous girder tie beam, and also works out rigidity and stress conditions of the continuous girder tie beam and stress conditions of the concrete - filled steel tube arches of the main bridge

    摘要介紹了拉薩河特大橋主橋結構設計情況,對於五跨梁拱組合橋梁各孔跨合理的跨度比、疊拱的受力行為及連續梁系桿截面形式等設計中的關鍵性問題進行了深入的研究,給出了主橋連續梁系桿的剛度和應力情況、鋼管混凝土拱的應力情況。
  16. Seismic response analysis of long span railway steel truss bridge

    大跨度鐵路鋼桁橋地震響應分析
  17. A new type bridge named long - span cable - truss bridge ( lsctb ) was created which can combines advantage of cable and truss structure

    該橋型一方面利用纜索的抗拉性能;另一方面利用桁架結構剛度大的優點。
  18. As a result of increasing bridge span, deck flexibility and structure complexity, earthquake analysis of long span cable - stayed bridge becomes one of the most concern and challenge problems in bridge engineering field

    隨著橋梁跨度、橋面柔性和構造復雜性的增加,大跨度斜拉橋的地震動研究已經成為橋梁工程界最關心、最具有挑戰性的課題之一。
  19. Railway bridge span series

    鐵路橋梁跨度系列
  20. In this paper, an approach of the systematic artificial neutral net was introduced into the analysis on the ship - against - bridges probability with a computer programs. based on the basic data of the present 12 typical bridges as the sample, 4 chief influential factors as the input coefficient, such as the bridge span, the water flow rate, the incline angle between water flow direction and the direction normal to bridge axis, and the curve in the course near the bridge area, with the ship - against - bridge probability as the output coefficient, the intelligent judging system of the ship - against - bridges probability reflecting the influence of the above input parameters is obtained after training

    本文首次將人工神經網路系統方法引入了船撞橋概率的研究當中,編制了計算程序,成功地以現有12座典型橋梁的基礎數據為樣本,以橋梁跨徑、水流流速、水流方向與橋軸法線的夾角以及橋區航道彎曲度等4個船撞橋主要影響因素為輸入參數,以船撞橋概率為輸出參數,經訓練得到了能較好地反映上述輸入參數影響的船撞橋概率判斷系統。
分享友人