double control cable 中文意思是什麼

double control cable 解釋
復式操縱索
  • double : adj 1 兩倍的,加倍的。2 雙的,二重的,雙重的;對,雙,兩,復。3 雙人用的;折疊式的。4 (意義)雙...
  • control : n 1 支配,管理,管制,統制,控制;監督。2 抑制(力);壓制,節制,拘束;【農業】防治。3 檢查;核...
  • cable : n 凱布爾〈姓氏〉。n 1 【造船】錨鏈,錨索,(周長10英寸以上的)左捻三根三股索;粗索,巨纜;鋼絲繩...
  1. The main building is 25 - storied and has high - class single - bed room, high - class double - bed room, deluxe single - bed room, deluxe double - bed room, deluxe suite, and deluxe business suite, luxuriously decorated and the equipments are consummate, all guestrooms are facilitated with gorgeous european palace styled furniture, large - screen tv set, safe, refrigerator, wideband cable and satellite tv programs, as well as the full - intelligent remote control system for the guestroom, including intelligent temperature control, intelligent light control, electronic door key system, audio system, etc. the bathroom of the guestroom is equipped with luxurious steam room and imported massage bathtub

    主樓高25層,擁有高級大床房高級雙床房豪華大床房豪華雙床房豪華套房豪華商務套房。客房裝修豪華設備完善,均配有華麗的歐洲宮廷式傢俱大螢幕電視保險箱冰箱寬頻網線及衛星電視,可遙控全智慧化的房間控制系統,包括智慧溫控智慧燈控電子門鎖系統音響系統等,客房浴室配豪華蒸氣房和進口按摩浴缸。
  2. Specification for ball - ends, double shank in corrosion resisting steel swaged on type, control cable - dimensions and loads

    操縱鋼索的旋鍛耐蝕鋼雙柄球形端頭規范.尺寸和負荷
  3. According to the design theory of the cable - stayed bridge and to the feature of the cantilever construction the authors propose a construction control method called optimum completion state method ( ocsm ) for rc cable - stayed bridges in the proposed method, the optimum completion state is regarded as the final target of the construction control, and the optimum construction state at each construction stage is taken as the technical route the key of the method is to properly choose or adjust the cable forces the objectives function of optimization is to minimize the elevation error of the girder under the constraint condition that the internal forces ( bending moments ) of the girder are bounded the optimization variables are the cable forces on the basis of the above principles, a optimum model for a construction step is established and cable force adjustments can be found for each construction step in this model, the creep and shrinkage effects of concrete have been considered a bridge example is given which shows that the final state of the bridge is very close to the design aim and that this method is much better than the so - called double - control method the example is a good illustration of the soundness and practical value of the proposed method

    根據現代斜拉橋結構設計理論和懸臂施工方法的特點,提出了以最佳成橋狀態作為施工控制的最終目標,以實施最佳施工階段為技術路線,以索力調整為核心內容的斜拉橋施工控制理論,簡稱為最佳成橋狀態法;以斜拉橋主梁標高誤差最小為目標函數,以主梁內力(彎矩)為約束條件,以索力為優化變量,建立了最佳施工階段的索力調整計算模型;推導了考慮徐變收縮效應的索力調整計算公式;用最佳成橋狀態法對一實橋工程進行了施工控制全過程計算研究,得到的成橋狀態與設計目標相當接近,優于該橋以「雙控」為控制目標的實測結果,有力地證明了本文方法的正確性及其工程實際價值
分享友人