drainage tunnel 中文意思是什麼

drainage tunnel 解釋
排水洞
  • drainage : n. 1. 排水,放水;排水法;逐漸流出。2. 下水道;排水設備,排水系統。3. 水系,排水區域,流域。4. 陰溝水,(排出的)污水。5. 【醫學】引流,導液(法)。
  • tunnel : n 隧道;地道;坑道;管道,煙道,風洞;【礦物】石巷,平峒。 tunnel warfare 地道戰。vt (〈英國〉 l...
  1. In view of the natural conditions in loess area of gansu, in the light of investigation conditions of seepage of built loess and weak rock highway tunnels in this area and classification of water gushing conditions for railway tunnels, and by engineering analogism, the classification of tunnel water gushing types suited the structure design of highway tunnel waterproof and drainage, and the three methods for checking and subdividing water gushing types are presented

    摘要針對甘肅黃土區的自然條件,依據該地區已建黃土及軟巖公路隧道滲漏水調查情況和鐵路隨道涌水狀態分類,運用工程類比法提出適合該地區公路隧道防排水結構設計的隧道涌水類型劃分及對涌水類型校核與細分的三種方法。
  2. E plumbing : including tunnel, platform. . etc. water supply and drainage system ; totally water pump

    給排水:包含隧道月臺等之給排水系統,給水泵共763馬力污排水泵共141了馬力
  3. Including tunnel, platform. . etc. water supply and drainage system ; totally water pump 763hp, waste and drainage pump 1417hp

    給排水:包含隧道、月臺等之給排水系統,給水泵共763馬力、污排水泵共141了馬力、
  4. The thermal dynamic analysis of tunnel drainage hole in the perennial frozen soil

    多年凍土中隧道泄水洞熱動態分析
  5. Technical code for waterproofing and drainage of railway tunnel

    鐵路隧道防排水技術規范
  6. It is applied to drill heavy duty pretension anchor holes at side slope of water power station, railway or highway projects, to drill drainage holes and grouting pile holes on roof of tunnel gallery

    適用於水電站鐵路公路邊坡大噸位預應力錨固孔排水孔隧道口管棚孔的施工,以及預防滑坡巖石坍塌等地質災害治理工程。
  7. The conclusion is that the extrusion presses between primary and secondary linings, elasticity of the waterproof layer and unblocked drainage layer are the vital factors influencing the waterproof layer of spraying - on acrylate membrane in tunnel composite linings

    試驗結果表明,襯砌間的擠壓應力、防水層的彈性恢復能力、通暢的排水層對丙烯酸鹽噴膜防水層在隧道復合式襯砌中的防水效能發揮重要作用。
  8. First, on the base of investigating geleshan geologic environments, the author carefully analyzes them, studies their water storage structure, discusses the relationship of underground water dynamic changes and tunnel drainage by desiccation ; secondly, the author makes the dynamic analysis, regression analysis, routine hydrochemistry analysis, isotope analysis, so draws to guan - yin gorge anticlire east and west slot ' s karst developing features, alternated conditions underground water and supplying drain ways ; thirdly, by stating the fissuring ' s surveying data, the author calculates the seeping tensor

    作者在進行歌樂山地質環境調查的基礎上,仔細分析了大量觀測資料,研究其儲水構造,掌握地下水動態變化與隧道施工涌水的關系,及補給受降雨的影響情況。對隧道周圍的地下水進行動態分析、回歸分析、常規水化學分析以及同位素分析,得出觀音峽背斜東西翼槽谷的巖溶發育特徵,及地下水的循環交替條件、補給排泄途徑;統計分析裂隙測量數據,計算滲透張量。
  9. In order to solve some technique problems of waterproof and drainage of tunnels based on controlling drainage, model tests, numerical simulations and site investigations were performed by use of two cases longtan tunnel and baiyun tunnel

    摘要針對控制排放的隧道防排水技術中一些關鍵問題,以龍潭隧道和白雲隧道為依託,採用模型試驗、數值模擬、現場調查等方法進行了系統研究。
  10. The water - proof and drainage system within the tunnel has adopted the comprehensive treatment project of the combined linings and setting the pvc pellicle in the middle, the connection of the longitudinal, loop pipes and the rubber - sealing belt

    洞內防排水採用復合式襯砌中間設聚氯乙烯薄膜結合縱向、環向盲管及橡膠止水帶的綜合治理方案。
  11. Design and construction of waterproofing and drainage utilizing combined lining at yanlieshan tunnel of jiujiang - jingdezhen road

    九景公路雁列山隧道復合式襯砌防排水的設計與施工
  12. ( 2 ) the method of finite element discrete and optimal parameter back analysis is adopted. ( 3 ) concentrated on the question of high external water pressure of the deep - lying tunnel, the basic theory and method calculating external water pressure are systematically studied. ( 4 ) based on jinping cascade 2 hydropower station, numerical simulation rain infiltration of seepage field under different drainage pattern and grouting pattern are studied, also, the high external water pressure is analyzed and studied and some seepage control measures are put forward

    ( 2 )採用有限元離散?優化法進行參數的反演分析; ( 3 )針對深埋隧洞的高外水壓力問題,進一步分析和研究了襯砌水荷載及外水壓力的作用機理和計算方法; ( 4 )以錦屏二級水電站深埋長引水隧洞作為本文的主要研究對象,採用考慮降雨入滲滲流場分析的方法對排水方案和灌漿封堵方案不同情況下的滲流場的水頭分佈進行了數值模擬,並對其外水壓力進行了分析和研究,提出了滲流控制的具體措施。
  13. Drainage improvement in northern hong kong island - hong kong west drainage tunnel

    港島北部雨水排放系統改善計劃港島西雨水排放隧道
  14. Prevent drainage construction technic and the prevention and cure step to common fault of twin - tunnel

    雙聯拱隧道防排水施工技術與通病防治措施
  15. Synthetic construction technology of waterproofing and drainage for a double - arch tunnel on beijing municipal railway

    北京城市鐵路雙連拱隧道防排水綜合施工技術
  16. Research on reasonable section configuration of waterproofing and drainage in loess and soft surrounding rock road tunnel

    黃土軟巖公路隧道防排水合理結構型式研究
  17. The middle wall of a double - linked - arch tunnel is the key component of the structure ; it also has a great influence on waterproof and drainage of the tunnel, so it is very important to select the proper from of the middle wall

    摘要雙連拱隧道的中墻是結構受力的關鍵構件,又對隧道防排水有較大影響,因此,合理選用中墻形式至關重要。
  18. Proposed works for drainage tunnel in tsuen wan

    荃灣雨水排放隧道的擬建工程
  19. Application of grouting deep mixing piles to soft foundation treatment of city drainage tunnel engineering

    漿噴深層攪拌樁在城市排水渠工程軟基處理的應用
  20. Announcing the details of the research excellence series and explaining the modelling of the proposed hong kong west drainage tunnel on monday will be professor cy jim, member of the university research committee and professor joseph lee, director of the croucher laboratory of environmental hydraulics

    大學研究事務委員會委員詹志勇教授及裘槎環境水力實驗所所長李行偉教授將于簡報會上介紹港大卓越研究系列及有關香港西區地下排水管道的設計,詳情如下:
分享友人