electric plan 中文意思是什麼

electric plan 解釋
電氣設備分布圖
  • electric : adj. 1. 電的;帶電的;起電的,導電的,發電的,電動的。2. 令人激動的,緊張的,驚人的。3. 〈美口〉(樂曲的)用電吉他演奏的。n. 〈口語〉1. 帶電物體。2. 電動車輛。
  • plan : n 1 計劃,設計,方案,規劃;方法;進程表;時間表。2 圖,圖面;平面圖,設計圖;示意圖;圖表;(街...
  1. During recently 3 years, i mainly engaged in mechanical vocation ' s plant planning. i attended 25 projects, which including feasible reports, preliminary designing and working drawing designing, ranged over establishment or technology reforming of machine tool factory, gear factory, tractor factory, automobile manufactory, electric pump factory, electromechanics factory, electric cable factory, the highest investment of them is 160 million yuan, total design work expand over 850 million ( no repeat calculate ). for i have professional ability and well up in developmental situation of mechanical vocation and it ' s situation inside jiangsu province, these projects what i designed were all authorized by leading department and expert, introduced into national plan and bring into operation. these projects bring both economic profit and society profit for the factory ' s technical advancement, product ' s update. as the director of these projects in these designing and consultation work, i generally organize and operate these and earn the higher valuation of leading department and consumer

    近三年來主要從事機械行業工廠工程設計,先後參與二十五個項目的可行性研究報告編制,初步設計和施工圖設計.涉及機床廠,齒輪廠,拖拉機廠,汽車製造廠,電泵廠,電機廠,電纜廠的新建或技術改造,其中單項投資額最高的為1 . 6億元,總計完成投資額為8 . 5億元(未重復計算)的設計工作量.由於對機械行業發展狀況和省內狀況較為熟悉,具有一定的專業水平,這些設計項目均經有關領導部門,專家審定列入國家計劃,得以實施,為工廠的技術進步,產品更新換代,生產發展創造較好的經濟效益和社會效益.在這些設計,咨詢中,本人均任項目負責人,全面組織,實施設計工作,得到主管部門和用戶較高評價
  2. In this paper, we analyze and practise the enterprise - level application of b / s structure developed on j2ee platform, which is in the information - flattop plan proposed by yunnan electric power company

    本文針對雲南電力集團公司提出的「信息航母計劃」 ,對在j2ee平臺上開發b s結構的企業級應用程序進行了一定的分析、研究和實踐工作。
  3. The top widely give or get an electric shocks to wait the evd of the actual shipments the predominances measure to all compare to expect to want little, up widely give or get an electric shock the first shipment 2000 set, ratio in advance conceive big for the shrinkage. machine business enterprise of another 7 greatest discses within evd alliances, now haven t take outed the kind machine, and more have no a substance action on the market. created the even to put off the evd production plan, and start all over again to beat to build the high and pure dvd ; grow the to now return at hesitate the stage ; ten thousand benefits reach a business enterprise is then directed to throw the center of gravity to face philip get the engraving of the dvd ; even if is a top to widely give or get an electric shock, and also apparently diligently not, recent capital increase 577 ten thousand usds used for to engrave the production of the dvd with develop

    上廣電等evd主導者的實際出貨量都比預期要少,上廣電首批出貨2000臺,比預先設想大為縮水。 evd聯盟中的另外7大碟機企業,目前還沒有拿出樣機,在市場上更沒有實質性的動作。創維甚至擱置了evd的生產計劃,另起爐灶打造高清dvd長虹目前還在觀望階段萬利達等好幾家企業則直接將重心投向了飛利浦領銜的刻錄dvd即便是上廣電,也似乎用心不專,最近增資577萬美元用於刻錄dvd的生產和研發。
  4. Have administrative staff no. 15 now, have people 300 more than staff, existing advanced electric motor car platforms wait for 200 of equipment already at first - phase, the plan expands the scale to 600 within the year, estimate when the time comes that the annual output will reach 100 million yuan

    現有管理人員15人,首期已有員工300多人,現有先進的電動車臺等設備200臺,計劃年內將規模擴大至600臺,屆時預計年產值將達到人民幣1億元。
  5. The handing capacity of tian jin port has been raised to 95 million tons at the end of the " 95 plan " from the 46 million tons at the beginning of the " 95 plan ", which is not separated with the safe and reliable electric power system guarantee. it is that tian jin port pays attention to the development of the electric power system, the modernization of the power supply system of tian jin port is realized today

    天津港電力系統現代化水平是隨著天津港的發展而不斷提高的,天津港的吞吐量從九五初4600萬噸到九五末9500萬噸,是和安全、可靠的電力保障分不開的,也正是天津港對港口電力發展的重視,才得以實現港區今天的供電系統的現代化。
  6. Saying specifically, about taxation kinds, the thesis discusses the planning ways of value added ta business tax and income tax ; with regard to tax planning of the operating process, the article makes research into the tax planning of enterprises of electric power construction enterprises of power supply enterprises of power sale and enterprises of power transmission in the course of generating electricity to consuming electricity. finally, the thesis discusses that enterprises of electric power make use of preferential policies to plan paying taxes concerning investment areas investment industry and financial results

    具體地來說,從稅種上,主要論述了增值稅、營業稅和所得稅的納稅籌劃;關于營運過程中的納稅籌劃,本文主要對「電」的產生到消費過程中涉及的電建企業、發電企業、售電企業和輸配電企業的納稅籌劃進行了研究;本文最後從投資地區、投資行業和財務成果三個方面論述了電力企業利用優惠政策進行納稅籌劃。
  7. Power network energy loss rate ( " line loss rate " for short ) is an important technical & economic indicator for electric power enterprises, which reflects the comprehensive capability in network plan, design, operation and management

    摘要電網電能損耗率(簡稱線損率)是電力企業一項重要的技術經濟指標,綜合反映電網規劃設計、生產運行和經營管理水平。
  8. From 1996 to 1998, as a project manager, i finished the studies on simple constructed venturi water film scrubber desulphurization technology and equipment for small and medium _ sized coal _ fired power plant. such studies are one of the projects required to rack one ' s brain with emphasis by ministry of science and technology in " ninth _ five _ year " plan. on the basis of the aboved researches, being entrusted with jiangxi provencial electric power bureau and guizhou provincial electric power bureau, we conducted the engineering feasible researches and preliminary design for nanchang power power plant and guixi power plant in jiangxi province, guiyang power plant in guizhou province, yongji power plant and taiyuan thermal power plant no. 2 in shanxi province to use venturi water film scrubber simple constructed desulphurization technology. the major technical targets of above consultation are around 70 % of desulphurization rate and improved dust removal efficiencies comparing with original efficiencies. the key features of this new technology are advanced and practical, low in investment cost, small in land occupied, suit for renovating the existing power plant and suited to chinese conditions

    1998年完成了"九.五"國家科技攻關項目< >的開發工作.在此基礎上,受貴州省電力局,江西省電力局,山西省電力局的委託,分別對貴陽發電廠,南昌發電廠,貴溪發電廠,永濟發電廠,太原第二熱電廠等進行了簡易脫硫技術的工程可行性研究以及初步設計等.上述咨詢內容中的主要技術指標是脫硫效率達到70 %左右,並可提高原除塵器的除塵效率.有投資低,佔地面積小,適合老廠改造,技術先進實用等特點
  9. Plan design guide for the rural electric power network

    農村電力網規劃設計導則
  10. According to the actural experience and comparison with two repair plan to electric bucket tooth, a reasonable one is provided

    根據現場工作實踐,分析了修復電鏟斗齒的二個方案,並進行對比論證,提出了有效的斗齒修復方案。
  11. Abstract : according to the actural experience and comparison with two repair plan to electric bucket tooth, a reasonable one is provided

    文摘:根據現場工作實踐,分析了修復電鏟斗齒的二個方案,並進行對比論證,提出了有效的斗齒修復方案。
  12. In charge of one of major subjects of the national eighth five - year plan, i. e. " study on shotcreting techniques of polyacrylate emulsion cement mortar for impermeability coating of pu ding rcc dam ", the achievement of which has been appraised by the ministry of electric power and evaluated as reaching national leading level. 2. in charge of the major subject aided by the committee of national natural science funds, " study on durability of high bolumes of fly ash concrete ", the first phase achievement of which has been commended by the committee. 3. in charge of one of major subjects of the national ninth five - year plan, i. e. " study on high performance concrete in marine engineering, design and construction ". 4. acting as one of editors - in - chief of " technical specification for abrasion and cavities resistance of concrete in hydraulic structures ", which is issued by the ministry of water resources. 5. by providing the repairing and strengthening schemes on seepage and cracks of the basement of nanjing lukou international airport, the air traffic opening of the airport was ensured as scheduled. 6. consulting services on techniques of high performance and abrasion - erosion resistance concrete for three - gorges project, anti - corrosion of reinforced concrete strutures for the ore port of shanghai baoshan iron and steel works, mass fly ash concrete for jiangyin yangtze river bridge and pumping concrete for nanjing yangtze river second bridge

    主持國家「八五」攻關項目「普定碾壓混凝土壩上游面丙乳砂漿防滲層大面積施工工藝研究」 ,成果通過部級鑒定,評價屬國內領先水平; 2 .主持國家自然科學基金重大項目「高摻量粉煤灰混凝土的長期性能研究「 ,階段成果獲國家自然科學基金委通報表彰與獎勵; 3 .主持國家「九五」攻關項目「海工高性能混凝土成套技術研究」 ; 4 .水利部「水工混凝土抗沖磨防空蝕技術規范」的主編之一; 5 .為南京祿口國際機場地下室修漏與裂縫補提出技術方案被采納並實施,為機場如期通航作出貢獻; 6 .為三峽工程抗沖磨高性能混凝土技術、上海寶鋼礦石碼頭鋼筋混凝土防腐蝕技術、江陰長江大橋大體積粉煤灰混凝土技術、南京長江二橋泵送混凝土技術等提供咨詢建議。
  13. Put forward is the future plan on the improvement of the forge - weld hbbb, which is helped to research and design of the hbbb for the ss7 - type electric locomotive and other electric - driving locomotives in the future

    提出了鍛焊抱軸箱體攻關工作的進一步設想,對今後韶山7型電力機車抱軸箱體的進一步攻關及其它電傳動機車抱軸箱體的設計和研究,有一定的借鑒作用。
  14. Abstract taking the project of a government apparatus building in beijing as an example, the paper analyses some general problems about electric energy conservation in office buildings, and puts forward a feasible energy conservation plan according to the result of survey

    摘要本文以北京市某單位電氣節能診斷的實際工程為例,分析了普通政府機構辦公建築中較常見的電氣節能方面的問題,並根據工程實測結果設計了具體可行的電氣節能整改方案。
  15. Under some conditions, although for passive materials, when a plan wave incidents to the interface between a layered lossless material and a layered lossy material, the reflection coefficient of electric field may be greater than unity

    在某種條件下,即使在無源媒質中,電磁波在有耗媒質和無耗媒質的交接面上,其組合反射系數可能會大於l 。
  16. Currently. development in this field is still in pioneering exploration in china, management information system of relay protection consists of such modules as equipment management, operation management, statistic analysis, countermeasure and plan management, office management, and technical exchange. to meet the demands from zitong power supply bureau of mianyang electric power bureau

    繼電保護信息管理系統,主要由設備管理、運行管理、統計分析,反措與計劃管理,事務管理和技術交流等模塊組成,本文主要以四川省綿陽電力局梓潼供電局的需求提出並以該局變電站為藍本,對這一系統的基本部分進行動態數據訪問開發。
  17. In order to push forward sustainable development of wind power generation, " the research of the mw - scale stall - regulated wind turbine generators and the key parts " has been ratified by the ministry of science and technology as one of the national high technology research and development plan ( 863 plan ). we shall form self exploit ability soon by ourselves developing and trackling some key technology, such as the total design, electric control system ( ecs ) and the design of the rotor blades, etc. during the process of localization of mw - scale wind turbine generators ( wtgs )

    為了進一步推動我國風電事業的持續發展,國家科技部將「 mw級失速型風力發電機組及其關鍵部件研製」列入「十五」國家高技術研究發展計劃( 863計劃) ,通過自行研製和技術攻關,掌握mw級風力發電機組總體設計技術、單機電氣控制技術和葉片設計技術等關鍵部件的設計和製造技術,盡快形成自主開發能力。
  18. Abstract : this paper discussed two mathematical models for the problem of selecting an expansion plan over a planning horizon for an electric utility system. one of which is the model of optimal sequencing of power plants which is solved using lagrangian relaxation. another is the model of operation. the paper explicated concrete application of the lagrangian relaxation method in calculating block diagram for sloving the scheduling model and considered variable operating expense when calculating

    文摘:運用系統工程方法,建立了火電站興建次序優化模型及火電站運行方式模型,採用拉格朗日鬆弛法研究火電站興建次序的優化,並給出了火電站興建次序優化模型的拉朗日鬆弛法計算.在優化計算過程中考慮了可變運行費用問題
  19. In this paper, researching and producing on current waveform control system of inverter carbon dioxide welding machine is given. the overall plan, the design of hardware structure, the programming and debugging of software is described in detail. the bang - bang and alterable structure discrete pid synthetic control algorithm are used to modulate the width of pwm signal in real time, to acquire the fiat character by driving and controlling the opening and shutting time of igbt, the technology of " double impulse " is adopted to realize electric current waveform control

    本文介紹了逆變波形控制co _ 2焊機控制系統的研製,詳細闡述了總體方案的制定、硬體研製及軟體的編寫與調試,採用變結構、離散型pid + bang - bang復合控制演算法、實時調節輸出pwm信號的脈沖寬度,驅動控制用於逆變的大功率開關管igbt的開通與關斷時間,獲得逆變焊機平外特性。
  20. It comes out the plan of gz40 qinling long tunnels electric supplying & distribution auto - technology and the plan of communications and controlling

    針對gz40陜西境內秦嶺特長隧道群機電設計中供配電自動化控制、提出了相應的通信和控制方案。
分享友人