fault dam 中文意思是什麼

fault dam 解釋
斷層堤
  • fault : n 1 過失,過錯;罪過,責任。2 缺點,缺陷,瑕疵。3 (獵狗的)失去嗅跡。4 【電學】故障,誤差;漏電...
  • dam : n 1 水閘,壩,堰。2 壩中的水。3 【礦物】坑道堰。4 (牙科用的)橡皮障。5 〈比喻〉障礙。vt 1 築水閘...
  1. The characteristic of chemical grouting material should combind with construstion method directed by the theories, it is necessity guarantee for the good result in some special cases. by cw series material, various complicated engineerings have been successfully handled, such as the treatment of concrete fine cracks in three gorges project ( tgp ), foundation reinforcement to the fault in in three gorges project ( tgp ), and the seepage control and reinforcement for the dam base of jiangya hydropower - station. these illustrations are provided to proof the advantages of modified epoxy resin and its technique

    化灌材料特性與理論指導下的灌漿工藝的全面結合是化灌處理,特別是特殊條件下灌漿效果的必要保證, cw系改性環氧化灌漿材及技術對多種復雜工況工程處理對象成功處理,解決了三峽混凝土微細滲水裂縫防滲補強、三峽工程地質斷層泥化夾層加固以及江埡電站壩基溶蝕帶防滲等一系列工程技術難題,印證了該材料及技術的先進性。
  2. 3d numerical simulation of impact of key fault and fault enhancement on foundation rock mass of guangzhao high gravity dam

    光照重力壩壩基斷層影響及處理的三維數值模擬
  3. Fault tree analysis is used to analyse the high arch dam risk

    摘要利用故障樹分析法對高拱壩進行風險分析。
  4. Through field investigation and analysis indoor, with studying all hydrochemistry data in detail, including macro components and micro components, the author finds out the hydrochemistry feature of ground water. for further specifying the ground water system, with cluster analysis of macro components of surface water and ground water in total 147 samples and the analysis of micro components, including ree, the main ground water systems are distinguished by and large, especially the ground water system main of fault no. 7 and fault no. 15 water bearing belts which have differences at macro and micro components between the two ground water systems, moreover, the main hydrogeochemistry effects are established such as lixiviation, oxidization, precipitation and mixing effect, especially the mixing effect which result in the complexit y of the hydrochemistry of deep bearing tectonic fracture water. based on them, the hydro geological model of upper dam base is established, meanwhile the author summarizes the hydrochemistry feature of weathering crevice water, surface tectonic crevice water and deep tectonic crevice water

    為此,本文以大崗山壩區水文地球化學問題為研究對象,通過野外調查和室內分析,詳細的研究了壩區水化學資料,包括宏量組分、微量組分,查明了壩區地下水水化學特徵,對採集的147個地表及地下水樣的宏量組分進行聚類分析,結合微量元素,稀土元素的研究,並應用二氧化硅地熱溫標確定了深部構造裂隙水的熱源深度,基本區分了壩區各個主要地下水水系,特別是以f7 、 f15斷裂含水帶為主的地下水系,它們的宏量組分、微量組分以及稀土等方面均存在差異,以此為基礎,結合壩區水文地質條件,建立了壩區的上壩址的水文地質模型,同時通過分析了壩區花崗巖區的水化學資料,確立了壩區主要的水文地球化學作用,分別為:溶濾作用、氧化作用、沉澱作用、以及混合作用,混合作用是導致深部承壓裂隙水水化學復雜的主要原因,並總結了壩區風化裂隙水、淺部構造裂隙水、深部構造裂隙水的水化學特徵。
  5. No. 15 fault of yunfeng dam is a low angle one. its space structure is very complex. had not been disposed thoroughly during the period of construction, it has become the control factor in yunfeng hydroelectric project

    雲峰寬縫重力壩右f _ ( 15 )斷層為一個順河向、緩傾角大斷層,空間結構非常復雜,是影響大壩安全運行的控制因素。
  6. According to the geological conditions of baise project, erosive bands and joint fissures, f6 fault and grout curtain are fully simulated to establish 3d numerical model of the dam and its foundation. 3d non - linear fem is used to analyze the stress and strain and to appraise the operation state of both the dam and it ' s foundation under different operation conditions. by overloading the upstream water level and reducing rock strength parameter, the dam foundation ' s degradation process is simulated and the damage pattern and paths are determined, and finally the safety factor is determined

    2 、根據百色的地形地質條件,充分模擬了蝕變帶、節理裂隙、 f6斷層、灌漿帷幕等,較為真實地建立了壩體與地基相互作用的整體三維數值模型;採用有限元法對壩體及壩基在不同工況下的應力應變狀態開展分析,評價各工況下壩基的運行狀態;而後採用超載法和綜合法對大壩穩定性進行分析,模擬壩基的漸進性破壞過程,從而得到壩基在超載和強度下降過程中的破壞模式和破壞發展路徑,最終確定壩基超載安全系數和綜合安全系數。
  7. Study on influence of fault dislocation on a core rockfill dam

    基巖斷層錯動對心墻堆石壩的影響研究
  8. The results indicate that the thermal stress and comprehensive stress of 6aa dam section and f6 fault concrete tuck during construction and operation are all within the allowed concrete tensive strength. the results indicate that the construction scheme of 6aa dam section and the disposal scheme of f6 fault is feasible and meet the need of dam temperature control and crack. prevention

    計算分析表明,施工期和運行期6aa壩段及f6斷層混凝土塞的溫度應力、綜合應力均未超過該工程碾壓混凝土的設計允許抗拉強度,表明6aa ,壩段的施工方案和f6斷層的處理方案在溫控和防裂方面是可行的。
  9. Through the analysis of above result, the distribution law of the temperature field and thermal stress field of 6aa dam section and f6 fault concrete tuck can be generally understood, and it provides scientific reference for the structure design and the selection of construction schemes

    通過分析上述成果,可全面了解6aa壩段及f6斷層混凝土塞的溫度和應力分佈規律,為結構設計和施工方案選擇提供科學依據。
  10. In this paper, temperature field and thermal stress of baise 6aa roller compacted concrete gravity dam section are calculated and analyzed, and the distribution laws of the temperature field and the thermal stress field during construction and operation of 6aa dam section and its foundation whose top is made of f6 fault concrete tuck, are mainly studied

    本論文通過百色碾壓混凝土重力壩6aa壩段溫度場和溫度徐變應力場的模擬計算分析,主要研究6aa壩段及基礎部位f6斷層混凝土塞施工期及運行期的溫度場和應力場的分佈規律。
  11. Three - dimension finite element floating mesh method is used to calculate the temperature field and thermal stress of 6aa roller compacted concrete gravity dam section and f6 fault concrete tuck in this paper. the basic theories adopted include heat conduction theory, elastic theory and corresponding finite element calculation equation

    本文用三維有限元浮動網格法對6aa壩段及基礎部位f6斷層混凝土塞的施工過程進行溫度場和溫度應力模擬計算,計算的基本理論是熱傳導理論和彈性理論以及相應的有限元計算公式。
  12. According to baihetan hydroelectric power station dam shoulders load, side glide planes are fixed on both banks, which is controlled by base cracks on the left bank and by fault f18 and base cracks. and engineering geological characters of side glide planes

    結合壩肩抗力體荷載特點,確定了壩肩抗力體側裂邊界,左岸主要由基體裂隙控制,右岸由斷層f18和基體裂隙共同控制,並研究了側裂邊界的工程地質性狀。
  13. On the base of the study on the hydrogeochemistry at dam area, the author analyzes the last hydrochemistry data of bearing crevice water. from the diagram of piper and the correlation diagram of na / ca and na, it is known that the deep bearing tectonic fracture water is produced by two sources mix, meanwhile it is found out that there is better hydraulic power connection among bore d46, d503, d211, which shows there is better nnw hydraulic power connection at complex zone making up of fault no. 7, no. 15 and no. 2

    在壩區的水文地球化學的研究基礎上,整理分析了壩區以前的承壓裂隙水的水化學資料,從piper圖、 na ca ? na關系圖,說明了壩區深部承壓裂隙水是二源混合的產物,結合聚類分析表明了壩區d46 、 d503 、 d211鉆孔之間存在較好水力聯系,進而說明了在壩區f7與f15斷裂帶以及f2構成的復雜地帶存在北北西向較好的水力聯系。
分享友人