flood dam 中文意思是什麼

flood dam 解釋
防洪壩
  • flood : n 1 洪水,水災。2 溢流,漲水,潮水最高點,泛濫,洶涌。3 〈詩〉河,湖,海。4 充溢,豐富;大量,一...
  • dam : n 1 水閘,壩,堰。2 壩中的水。3 【礦物】坑道堰。4 (牙科用的)橡皮障。5 〈比喻〉障礙。vt 1 築水閘...
  1. After the first flood, we planted 300 olive and almond trees behind each dam.

    第一次洪水之後,我們在每個水壩後面補種了300棵橄欖樹和巴日杏樹。
  2. On the basis of collecting and arranging a large amount of projects experience, conbined with construction diversion flood passing measures design and hydraulic model test of lihua hydraulic pawer station in 1995 and 1996, the dissertation studies the issues related with characteristics of concrete face rockfill dam including the selection of construction diversion flood passing standard and measures, flood passing during construction period and embankment stage, coffer dam design, construction scheme and general schedule etc. and present preference for project construction

    本文在搜集整理大量工程經驗的基礎上,結合蓮花水電站在1995年及1996年導流渡汛工程措施設計及水工模型試驗,對混凝土面板堆石壩的導流渡汛標準、導流方式及其選擇、施工期渡汛及壩體填築分期、圍堰設計以及施工方案及總進度等與混凝土面板堆石壩特點有關的問題進行研究,為工程建設提供一定的參考。
  3. The dam was in danger because of the rising flood. .

    洪水猛漲,大壩告急。
  4. For jiangpinghe double - curved arch dam, 3 - d elasto - plastic fem is made, in which the point safety factors of the dam - abutments system and the safety margin for coefficients of sliding resistance on 7 potential sliding blocks of the dam before and after the reinforcement of the dam are calculated under the conditions of the normal storage level and the design flood level respectively based on the results from the analysis made with fem

    摘要對江坪河雙曲拱壩進行了三維彈塑性有限元分析,利用有限元應力成果分別計算了正常蓄水位、設計洪水位等3種工況下加固前後壩體壩肩系統的點安全系數和7個可能滑動塊體的抗滑富餘系數。
  5. By the scale of 1 : 35 flood - relief model test, combined the structures built and the pump entrance will be built of baishan dam, to decide the overall arrangement of the water cushion

    通過1 : 35比尺的整體泄洪模型試驗,結合白山已建的建築物及籌建的白山大泵進水口,選定水墊塘的總體布置方案。
  6. On the basis of the previous studies, a systematical study on the test and analysis of the atomization model is made herein based on both the prototype test and model test for jiangya dam, and then the data processing system for the atomized water particle size is developed as well ; which is a new trial carried out for the model law for the intensity of rainfall from atomization of flood - discharging flow

    摘要在以往的研究成果基礎上,結合江埡大壩原、模型測試成果,對霧化模型的測試分析技術進行了系統研究,開發了霧化粒度數據處理系統,對泄洪霧化雨強的模型律進行了新的探索。
  7. In the program, the effect of lamination placement, construction interval, elastic modulus change, thermal insulation change, surrounding temperature change, concrete creep and autogenous volume change on thermal stress are considered. and such temperature control measurement as water pipe cooling, heat preservation of the dam surface, the pouring temperature control, the overflow across the dam top during flood season can also be simulated by numerical method

    該程序在編制過程中考慮了混凝土分層澆築、施工間歇、彈模變化、絕熱溫升過程、環境溫度的變化、混凝土徐變、自生體積變形等因素對壩體溫度場及溫度應力場的影響,同時也考慮了水管冷卻、壩體表面保溫、控制澆築溫度、施工汛期壩頂面過水等各種溫控措施的數值模擬。
  8. It elucidates the grade and layout of the construction diversion structures, testifies the technical rationality and economic advisability that the alternative of the cofferdam uses to dam up the discharge ( p = 10 %, q = 275. 2m3 / s ) during the post - flood period, was made by hydraulic calculation, structural design, investment comparison, progress analysis and investment risk analysis

    文中說明了施工導流建築物的等級、水工布置。通過水力學計算、結構設計、導流方案投資比較、進度分析和投資風險分析,說明了四湖溝水利樞紐工程採用圍堰擋汛后時段洪水導流方案的合理性和經濟性,為施工決策提供理論依據。
  9. Spatial elastoplastic analysis of reinforcing outlets in flood release dam section of tgp

    三峽泄洪壩段孔口配筋方案空間彈塑性分析
  10. ( 5 ) the maximum water level risen by the enclose tideland cultivation around the reservoir is 0. 66m, the responding quality is 2000mvs, which heavily effect the environment around the reservoir. the reservoir " s water level is risen because cross section and flood canal become narrow, which caused by building dam, this makes groundwater unsmooth, drainage, even flow from a lower to a higher space and soil salinized

    66m ,且為2000m 』兒的常年洪水,對庫區周邊環境的影響較大,因打壩築堤縮小過水斷面和行洪通道造成水庫水位進一步抬升,致使庫區周邊灌區地下水排水不暢,乃至倒灌,型成士地鹽堿化。
  11. Application of dynamic compaction to foundation improvement of a flood - prevention dam in yibin

    強夯法在城市防洪工程地基加固中的應用研究
  12. For example the concrete faced rock - fill dam in frigid zone is distinctive in terms of frost resistance and durability, cushion material seepage prevention and frost heave, adaptability of darn filling with season coordination among construction diversion, flood discharge and the whole construction schedule etc. lianhua construction which is situated in mudanjiang basin of heilongjiang province firstly creates the successful record of construction of large - size faced rock - fill dam in frigid zone, a series of internal and external problems not having a precedent to go by have been solved

    如在面板的抗凍耐久性、墊層材料防滲和凍脹特性、壩體填築與季節的適應性、導流和度汛與總體進度的協調等方面,寒冷地區混凝土面板堆石壩均有其獨特之處。蓮花工程位於黑龍江省牡丹江流域,首創了高寒地區修建大型面板堆石壩的成功記錄,解決了一系列國內外均無先例的難題。
  13. Study on plunge pool concrete lining stability for flood dischare of a high arch dam

    高拱壩泄水墊塘襯砌穩定性研究
  14. Study on repair technique of sluice and dam destroyed by flood

    水毀攔河閘壩修復修補技術研究
  15. Experimental research on crest spillway flood energy dissipation for the double - curvature arch dam

    雙曲拱壩壩頂表孔泄洪消能布置試驗研究
  16. The dam was not strong enough to hold back the flood waters.

    水壩不夠堅固,擋不住洪水。
  17. When the model is applied to a historical dam - break flood, the computational results agree well with hydrographic station records and flood tracking investigation

    依據水量平衡原理及水流連續性條件,建立了支流蓄泄庫容關系和支流倒回灌數學模型。
  18. Some critics believe sedimentation is growing at a faster rate, which could eventually make the dam unable to contain a flood crest

    不過有意見認為,泥沙淤積的速度在加快,並最終會導致大壩無法承受洪峰。
  19. In this paper, regarding the analysis of stability factors of majiatian tailings fill dam, namely regional geologic structure, rock - soil body of dam foundation, poor geology phenomenon, leach consolidation and chemical consolidation of tailings, seepage water of dam body and king - size flood water of majiatian tailings reservoir, a preliminary demonstration on probability of earthquake liquefaction and seepage failure of dam bodys tailings sand soil, of the dam body failure resulted from abutment landslide and of the flood water overflowing crest, as well as on the contribution of leach consolidation and chemical consolidation of tailings to the stability of dam body has been performed

    通過對馬家田尾礦庫區域地質構造、庫區不良地質觀察、尾礦淋濾固結和化學固結、壩體滲透水和庫區特大洪水等因素對馬家田尾礦堆積壩體穩定性影響的分析,初步論證了壩體尾礦砂土的地震液化、滲透破壞、壩肩滑坡使壩體失穩和洪水漫頂的可能性,以及尾礦淋濾固結和化學固結作用有助於壩體的穩定性。
  20. In this paper, regarding the analysis of stability factors of majiatian tailings fill dam, namely regional geologic structure, rock - soil body of dam foundation, poor geology phenomenon, leach consolidation and chemical consolidation of tailings, seepage water of dam body and king - size flood water of majiatian tailings reservoir, a preliminary demonstration on probability of earthquake liquefaction and seepage failure of dam body ' s tailings sand soil, of the dam body failure resulted from abutment landslide and of the flood water overflowing crest, as well as on the contribution of leach consolidation and chemical consolidation of tailings to the stability of dam body has been performed

    通過對馬家田尾礦庫區域地質構造、庫區不良地質觀察、尾礦淋濾固結和化學固結、壩體滲透水和庫區特大洪水等因素對馬家田尾礦堆積壩體穩定性影響的分析,初步論證了壩體尾礦砂土的地震液化、滲透破壞、壩肩滑坡使壩體失穩和洪水漫頂的可能性,以及尾礦淋濾固結和化學固結作用有助於壩體的穩定性。
分享友人