flood fill 中文意思是什麼

flood fill 解釋
不知該如何翻譯
  • flood : n 1 洪水,水災。2 溢流,漲水,潮水最高點,泛濫,洶涌。3 〈詩〉河,湖,海。4 充溢,豐富;大量,一...
  • fill : vt 1 注滿,裝滿,裝填,填充。2 (風)張滿(帆),使(帆背)受風。3 充滿,充實(知識等);普及。4 ...
  1. The key objectives of the workshop were to : provide an overview of flash flood prediction capabilities ; identify weak links in establishing operational flash flood warning systems and the ways to fill these gaps ; showcase best practices and case studies ; share knowledge, tools and technology ; present project briefs for establishing or improving flash flood forecasting services ; and open dialogue with donor and finance organizations

    工作坊的主要目的為: i檢視現今暴洪預報的能力ii辨識業務暴洪警報系統的弱點和研究改善方法iii展示成功的運作模式和案例iv分享知識工具和科技v為建立或改善暴洪預報服務匯報和倡議計劃vi與資助及撥款機構展開對話。
  2. For example the concrete faced rock - fill dam in frigid zone is distinctive in terms of frost resistance and durability, cushion material seepage prevention and frost heave, adaptability of darn filling with season coordination among construction diversion, flood discharge and the whole construction schedule etc. lianhua construction which is situated in mudanjiang basin of heilongjiang province firstly creates the successful record of construction of large - size faced rock - fill dam in frigid zone, a series of internal and external problems not having a precedent to go by have been solved

    如在面板的抗凍耐久性、墊層材料防滲和凍脹特性、壩體填築與季節的適應性、導流和度汛與總體進度的協調等方面,寒冷地區混凝土面板堆石壩均有其獨特之處。蓮花工程位於黑龍江省牡丹江流域,首創了高寒地區修建大型面板堆石壩的成功記錄,解決了一系列國內外均無先例的難題。
  3. In this paper, regarding the analysis of stability factors of majiatian tailings fill dam, namely regional geologic structure, rock - soil body of dam foundation, poor geology phenomenon, leach consolidation and chemical consolidation of tailings, seepage water of dam body and king - size flood water of majiatian tailings reservoir, a preliminary demonstration on probability of earthquake liquefaction and seepage failure of dam bodys tailings sand soil, of the dam body failure resulted from abutment landslide and of the flood water overflowing crest, as well as on the contribution of leach consolidation and chemical consolidation of tailings to the stability of dam body has been performed

    通過對馬家田尾礦庫區域地質構造、庫區不良地質觀察、尾礦淋濾固結和化學固結、壩體滲透水和庫區特大洪水等因素對馬家田尾礦堆積壩體穩定性影響的分析,初步論證了壩體尾礦砂土的地震液化、滲透破壞、壩肩滑坡使壩體失穩和洪水漫頂的可能性,以及尾礦淋濾固結和化學固結作用有助於壩體的穩定性。
  4. In this paper, regarding the analysis of stability factors of majiatian tailings fill dam, namely regional geologic structure, rock - soil body of dam foundation, poor geology phenomenon, leach consolidation and chemical consolidation of tailings, seepage water of dam body and king - size flood water of majiatian tailings reservoir, a preliminary demonstration on probability of earthquake liquefaction and seepage failure of dam body ' s tailings sand soil, of the dam body failure resulted from abutment landslide and of the flood water overflowing crest, as well as on the contribution of leach consolidation and chemical consolidation of tailings to the stability of dam body has been performed

    通過對馬家田尾礦庫區域地質構造、庫區不良地質觀察、尾礦淋濾固結和化學固結、壩體滲透水和庫區特大洪水等因素對馬家田尾礦堆積壩體穩定性影響的分析,初步論證了壩體尾礦砂土的地震液化、滲透破壞、壩肩滑坡使壩體失穩和洪水漫頂的可能性,以及尾礦淋濾固結和化學固結作用有助於壩體的穩定性。
  5. Impermeable wall made up by mixing grout and dike fill can greatly enhance the flood - resistant ability of the exiting dam. the quality of impermeable wall is affected easily by many factors, so it is very necessary to detect the quality of impermeable wall

    防滲墻施工質量由於受地質條件、施工技術等多種因素影響容易出現問題,因此需要進行檢測以便及時發現問題並採取相應措施,保證堤壩在防汛期間的安全。
  6. The drainage services department ( dsd ) contractor of the flood prevention project has without authorisation allowed the construction and demolition ( c & d ) materials to be used by a private land owner as fill materials in a private development

    (一)有關渠務署防洪工程承建商是在未有獲得該部門批準下把拆建物料給予私人土地的業權人用於私人發展填料用途。
  7. I set this layer to ‘ color and flood fill with a mid blue

    我設置這個層為色彩圖層填充為中藍色。
  8. Experimental results show that speed of the proposed algorithm is over 20 times faster than that of flood fill algorithm

    由於採用查表代替了排序操作,相位展開速度獲得了極大的提高。
分享友人