flood stream 中文意思是什麼

flood stream 解釋
漲潮流
  • flood : n 1 洪水,水災。2 溢流,漲水,潮水最高點,泛濫,洶涌。3 〈詩〉河,湖,海。4 充溢,豐富;大量,一...
  • stream : n 1 河流,小河;川,溪。2 流出,流注;一連串,(人物等的)輩出。3 (事件等的)連續;(財富等的)...
  1. There are five genetic classifications of tidal creeks as follows : tidal creek scoured by the currents of ebb tide ; tidal creek eroded by stream from land ; tidal creek scoured by conflux of rainwater ; new tidal creek formed when the old moving ; tidal creek scoured by the flood

    在形成上共分為四種成因類型,即落潮水流沖刷型、陸源水流侵蝕型、雨水匯流型、潮溝遷移殘留型和潮流輻聚侵蝕型。
  2. So as the enter point of the stream, the income of the reservoir, the time of the flood peak lasted, the quantity of sandiness income and the strobe of the darn. we must do some work to forecast and watch the different density stream. by experiments, we made out that it is impo rtant for us to reduce the water lever in work of the river belongs lots of sandiness

    從異重流試驗看,在正常運用下,水庫產生泥沙異重流的機率較大,能否運動到壩前排出庫外,還要看異重流潛入點位置、入庫流量、洪峰歷時、入庫含沙量、水庫閘門運用等因素,需要做好異重流預報監測工作。
  3. On 18 september 2003, ced s consultant inspected jointly with the contractor the pebbles stockpiled near hau wong temple at tung chung and was advised that the materials belonged to a construction company carrying out " flood protection " works for the stream

    土木工程署的工程顧問,在二三年九月十八日聯同承建商檢視堆存於東涌侯王宮附近的卵石時,獲告知該等物料屬一間在東涌河整治河道的建築公司所有。
  4. The annual average temperature is 8. 6 c ~ 10. 7 c, and the annual average rainfall is 538 ~ 578mm, and the summit appears in july and august, the rainfall in the period of flood accounted for 70 % of the total. we had collected the algae of niangziguan stream for five times in 2002 - 2003

    我們於2002 ? 2003年間對娘子關泉域的藻類植物進行了5次採集,採集地點主要集中在滾泉、水簾洞泉、水上人家泉、五龍泉和平陽湖,共採得藻類植物標本105號。
  5. Since boundary of the lower yellow river bed varies with the flow conditions, main channel of the stream continually shrank and flood control becomes rather difficult

    隨著黃河下游水沙條件的不斷變化,河道的邊界條件也隨之發生變化,主槽嚴重萎縮,泄洪能力日臻下降,防洪問題日益突出。
  6. The plans will be carried out in different stages, which involves 11 key projects, including : taipu river, wangyu river, dyke around the taihu lake, south - drainage in hangjiahu plain, water drainage and diversion in huxi, hongqitong, flood control in east - west tiaoxi, water drainage and diversion in wuchengxi, enlarging lanlugang, dredging liuhe and xietang, north drainage in hangjiahu, and flood prevention in the upper stream of huangpu river

    該方案以流域防洪除澇為主,統籌兼顧供水,航運和環境保護等方面的利益,計劃分期實施包括太浦河、望虞河、環太湖大堤、杭嘉湖南排、湖西引排、紅旗塘、東西苕溪防洪、武澄錫引排、擴大攔路港疏浚泖河及斜塘、杭嘉湖北排通道及黃浦江上游防洪工程等十一項骨幹工程。
  7. Ebinur every stream in the north, merely possess the a little flood water in the summer season to go into the sun dry little lake district, makes the little water area, and the water evaporates in briefly time to to be lost

    艾比湖北部各小河,只在夏季洪水期有少量洪水進入乾涸的小湖區,形成小面積的水域,而且在短時間內蒸發散失。
  8. This stream action mainly include torrent or sheet flood, not other water action

    這種流水作用主要是洪流或片流的作用,而不是其它水流作用。
  9. The results indicated that with the change of water and sand condition and the altitude of tongguan and the development of the industry and agriculture in recent decades, the water environment of wei river had changed largely, which were shown as follow : annual runoff and seasonal flood decreased sharply ; water stream of large discharge decreased and the range of runoff decreased greatly ; sediment load per year decreased generally, sediment concentration of water increased, and the sand silting up was serious ; water channel swung and shrank, and water regime deteriorated ; frequencies of big floods decreased obviously, and hyper concentrated flood increased obviously ; water levels of the same runoff rose universally, and the frequencies of the floods increased and aggravated ; water pollution was very serious

    結果表明,近期隨著水沙條件、潼關高程等的變化及工農業的發展,渭河的水環境發生了巨大變化,表現在年水量及汛期水量銳減;大流量級水流出現次數減少,水量減少幅度大;年輸沙量總體減少,河水含沙量增大,泥沙淤積嚴重;河道向擺動型發展,河道萎縮,河勢惡化;大洪水發生的次數顯著減少,高含沙小洪水明顯增多;同流量洪水位普遍抬高,洪災發生次數增加,洪災加重;水質污染極為嚴重。
  10. However, since the contractor has produced a letter from the tung chung rural committee ( tcrc ), claiming that the materials came from the flood protection project for the stream now underway, the consultant considers that before establishing the " non - legality " of the source, there are difficulties in invoking the terms and conditions of the contract to stop the contractor from transporting such materials to the construction site at its own risk and bearing all consequences and liabilities

    但由於承建商曾出示一份東涌鄉事委員會發出的信件,聲稱石料乃來自進行中的東涌河治河工程,工程顧問表示在未能確定該等石源是非法前,若根據工程合約條款禁止有關承建商在自負所有可能後果及責任的情?下運載石料進入工地,實存在困難。
  11. Complicated hydrologic and geographic conditions, and the large scale of the xiaolangdi hydraulic project on the yellow river are introduced briefly. three desilting tunnels are designed to meet the requirements of flood control, sediment discharge and runoff regulation. according to the performance requirements of desilting tunnels, the tunnel lining down - stream of the grouting curtain is designed to be post - tensional prestressed lining. on the basis of investigation and research, experiements and analysis, the unbonded prestressing system is used. it is the largest unbonded prestressed tunnel lining project in the world, and the first one in china

    簡介黃河小浪底水利樞紐復雜的水文、地質條件以及龐大的工程規模.該樞紐設計有3條排沙洞,擔負著泄洪、排沙、調節徑流和保證進水口不被泥沙淤堵的任務.根據排沙洞的水庫運用要求,灌漿帷幕下游排沙洞洞身段設計為混凝土后張預應力隧洞.通過大量的調研、試驗、分析論證,在施工前確定該預應力方案選用無粘結預應力系統,成為目前世界上規模最大的無粘結預應力隧洞襯砌工程,在國內尚屬首例
  12. Before joining in the project, one of us had a vivid vision of flood waters overflowing like a small river on a road, and fish swimming leisurely in the stream as children innocently played in the water

    在得知這項活動之前,我們之中有一位同修,在夢中預先看到泛濫的洪水淹沒了路面,滾滾洪流形成一條小河,魚兒悠遊其中,還有一些天真的孩童在水中嬉戲。
  13. Based on analyzing discharge data in guide, xunhua, tongren hydrologic station and river course character, propagation time of different discharge in different river course is presented, and prediction period of interval flood, main stream flood during construction and operation period are acquired

    通過對貴德、循化、同仁水文站流量資料以及河道特性的分析研究,得出不同流量在不同河道上的傳播時間,歸納出區間洪水和幹流洪水在施工期和運行期的預見期。
  14. By the 1980s, the steady stream had become a flood

    到了1980年,這股穩定的移民潮才像洪水般湧入。
  15. During the melting ice flood season, any reservoir upstream a river or lake responsible for the control of melting ice flood must obtain the consent of the relevant flood control headquarters and be subject to its supervision when discharging its flow down stream

    在凌汛期,有防凌汛任務的江河的上游水庫的下泄水量必須徵得有關的防汛指揮機構的同意,並接受其監督。
  16. The main conclusions of the research are shown as follows : ( 1 ) with meeting the comprehensive using demands including flood control, ice prevention and water supply of the main stream, aimed at the maximum generation electricity in a period of the reservoir regulation, built up the optimal regulation model of the longyangxia - liujiaxia system and sanmenxia - xiaolangdi system and adopted poa method to solve it, obtained long series compensation regulation results

    論文取得的主要成果如下: ( 1 )在滿足全河幹流防洪、防凌、供水等綜合利用要求的前提下,以水庫調度期發電量最大為目標,採用大系統分解協調方法,建立了龍劉和三小的優化模型,採用逐步優化演算法( poa )求解了該模型。
  17. Since the early nineties last century, machine learning techniques such as artificial neural networks ( ann ) have been attempted in flood forecast areas, such as rainfall - runoff modeling and stream flow forecasting, with some valuable experiences achieved. this paper presents several precise, reliable and practical flood forecast models based on some new style learning machines. their performances were valued in case studies

    本文結合機器學習技術,從尋找易用的、準確的、可靠的、實用性強的洪水預報方法的角度出發,建立了多種基於新型的學習機器的洪水預報模型,並通過這些模型在實例中的表現,對它們的性能進行了評價,提出了幾種基於學習機器的洪水預報解決方案。
  18. Spur dike shore protection project is designed for protection of the roadbed damaged by flood on qingxi reach of dongjiang river, the effect of which is calculated and analyzed by 2 - d mathematical model, to confirm the stream - deflecting and shore - protecting effect, and determine whether the spur dike exerts any influence on navigation

    摘要對東江清溪河段水毀路基河段的保護進行了丁壩護岸工程設計,並採用二維數學模型對其效果進行了計算和分析,以確定工程設計方案的挑流和護岸效果,以及是否對通航造成影響。
  19. Compound collecting of land utilization information in flood control zone of main stream for songhuajiang river

    松花江幹流防洪區土地利用信息復合提取
分享友人