geological investigation 中文意思是什麼

geological investigation 解釋
地質調查
  • geological : adj. 地質學的,地質的。 a geological survey 地質調查。adv. -ically
  • investigation : n. 1. 研究,調查;審查。2. 研究論文,調查報告。
  1. Code of geological investigation for levee project

    堤防工程地質勘察規程
  2. Muir wood r., 1984. problems of estimating earthquake recurrence from geological investigation in thrust fault terrains. proc. int. comp. on seismic microzonation, ech - cheliff algerea. 1, 147 - 159

    國家地震局地質研究所, 1994 .廣東第三核電廠沙環廠址設計基準地面運動確定
  3. In the meantime, the data of geodetic measurement, geological investigation and test are also analyzed, and the analytic results show that the local motion of fushun segment on hunhe fault is caused by coal extraction

    同時,對大地測量結果、地質勘察及試驗結果進行了討論,結果表明:煤田開采誘發了渾河斷裂撫順段的局部活動。
  4. So far as the water conveyance project of dahuofang reservoir is concerned, a summary is made herein on the topography, geomorphy, regional structureal stability, stratigraphic lithology, geological formation, hydrogeological condition and the main engineering geological problems based on the geological investigation achievements got from the design phase of the project in combination of the actual geological condition revealed during the excavation concerned

    摘要主要針對大夥房水庫輸水工程,根據其設計階段的地質勘察成果,同時結合施工中已開挖揭露的實際地質情況,對地形地貌、區域構造穩定性、地層巖性、地質構造、水文地質條件、主要工程地質問題等進行了綜合評述,以期關心本工程的人士能對隧洞的工程地質條件有初步了解和認識。
  5. Code for water resource and hydropower engineering geological investigation

    水利水電工程地質勘察規范
  6. Code for geological investigation of water resources and hydropower engineering

    水利水電工程地質勘察規范
  7. According to the data of drilling and other geological investigation on the lpg storage of jinzhou, and taking into account main factors that affecting stability of the storage and other classification standard, this paper selects five evaluating factors. using pattern recognition method and muti - step fuzzy classification clustering method to classify

    根據錦州lpg洞庫的地質勘察資料,考慮到影響洞庫圍巖穩定性的主要因素,結合已有的分類標準,本文選取了5個評價因子,用模式識別法與多級模糊聚類法來進行場地巖體的穩定性分類。
  8. Application of quot; 3s quot; technology in mine environmental geological investigation

    技術在礦山環境地質調查中的應用
  9. 2. rock mass structure analysis and stereographic projection are basic methods in rock slope stability analysis. this paper used these methods to analyse the stability of the fourteen slopes based close geological investigation and engineering analogy, and get some scientific conclutions

    2 、赤平投影法和巖體結構分析法是邊坡巖體穩定性分析的基本方法,經過詳細地質調查和工程類比,本文運用這些基本方法對沿線的14個高陡邊坡進行了穩定性分析,得出了較為科學的結論。
  10. Engineering - geological investigation of tailing pond in karst region : an example of banxia tailing of pingguo aluminium mine in guangxi

    以廣西平果鋁礦板下排泥庫為例
  11. Base on the definition of active fault and its meaning to engineers, this paper reviews some geological aspects and problems, such as the application of dating results in determination of active faulting ages, seismo - tectonics background studying on moderate - strong earthquakes, estimating earthquake recurrence from geological investigation, and probabilistic evaluation of the ground offset of active fault

    摘要本文在對活動斷層的工程涵義進行了簡要分析后,討論了斷層物質測年的工程應用進展及其斷層活動時代鑒定問題,並就如何加強中強地震發震構造判別、應用地震地質資料評估大地震年平均發生率、以及活動斷層地表斷錯位移的概率評價等問題作了初步探討。
  12. Technical specifications for remotes sensing of hydro - geological investigation of water supply

    供水水文地質勘察遙感技術規程
  13. Based on geological investigation in the mineralization concentration area and a lot of analytical data in the laboratory, this paper includes volcanic magmatic activity and magmatic distributing ; the petrology, element geochemistry features of the magmatic rock series in different areas in lanping basin ; the relationship between magmatic activity and mineralization

    本文以野外實地調研及室內測試數據為依據,研究了蘭坪盆地礦集區火山巖漿活動及巖漿巖分佈、不同區域巖漿巖巖石學特徵與元素地球化學特徵,探討了巖漿活動與成礦的關系。
  14. This article introduced the method of geological investigation of nanling tunnel karst disease, elaborated the tunnel engineering geology conditions, especially the karst water, the karst water power channel and the harm of karst water, and analyzed the cause that produced the karst disease

    摘要南嶺隧道巖溶地下水活動造成地表坍陷、洞內泥砂淤塞等病害,其原因在於隧道施工遺留的導洞長期疏排巖溶水,採用地質測繪、物探、鉆探、水文地質試驗等綜合勘察方法,查明地下水通道位置、地下水流速、流向,針對病害原因,提出攔截、封團、疏排、填充等綜合整治方案。
  15. Based on geological investigation in the field and a lot of analytical data in the laboratory, this paper has discussed settings of the regional geology and structure, the ore - forming geochemical process of cu - ag polymetallic mineralization field of lanping baiyangping, yunnan province

    本文以野外地質研究及室內測試數據為依據,研究了雲南蘭坪銅銀多金屬礦田成礦的地質構造條件和成礦的地球化學過程。
  16. Geological investigation and reflection on the expansive soil in nanning - youyiguan highway

    南友路膨脹土塹坡滑坍的地質調查與思考
  17. The stability of the landslide is a critical problem for feasibility of the project, and has a direct influence upon the operation of the lower reservoir and the power system. the sliding mass has been studied by some designer in geological investigation. the study showed that guishan sliding mass is in stabilization under natural condition, is not in stabilization under vii earthquake intensity

    在前期的研究中曾對滑坡體的穩定問題進行了研究,研究結果認為從宏觀定性分析,滑體處于穩定狀態,但經過計算,在度地震烈度下,處于極限平衡或不穩定狀態,為確保工程安全,對推動式的龜山滑坡體採取削坡減載的開挖方式將是行之有效的方案,這樣可以提高滑坡體在地震條件下的穩定性,因此,研究龜山滑坡體在不同開挖方式方案條件下的穩定性問題具有非常重要的實際意義。
  18. Because of the engineering geological happening, the magnitude losing have often taken place on the process of design actualizing and engineering building practicality running though the designing is provided with engineering geological investigation measure of the field on engineering exploitation activity of the subaqueous delta of yellow river

    在黃河水下三角洲開發的工程活動中,盡管設計都是針對具體場地的工程地質勘察資料進行的,但在設計方案實施和工程構築物實際運行中,常因始料未及的工程地質事件發生,造成巨大的損失。
  19. The institute is a geological prospecting organization with independent legal person qualification, integrated with the solid minerals prospecting, geological investigation of hydrological engineering environment, survey construction, rock mineral appraisal and testing, topography, engineering survey, geotechnical survey, foundation construction, geological disaster disposal, risk assessment, mine reclaiming and management etc ; now it has the geological prospecting qualification certificate approved by ministry of land and resources, surveying & mapping qualification certificate approved by hebei bureau of surveying and mapping, accreditation and metrology certification qualification approved by committee on state accreditation and approval, geotechnical engineering survey qualification certificate and foundation construction qualification certificate approved by ministry of construction ; now it has 435 staff with specialized technician 21 % ; advanced geological prospecting equipment and construction machinery and equipment, testing instruments, suitable for large - scale geological prospecting projects ; it has undertook several national and hebei, shanxi provincial largesize minerals prospecting projects, and won many awards such as science & technology progress, and geological prospecting etc

    中化地質礦山總局河北地質勘查院是集固體礦產勘查、水工環地質調查、勘查工程施工、巖礦鑒定與測試、地形、工程測量、巖土工程勘察、基礎工程施工、地質災害勘查治理、危險性評估、礦山恢復與治理等為一體的具有獨立法人資格的地質勘查單位;現擁有國土資源部認定的地質勘查資質、河北省測繪局認定的測繪資質、國家認證認可監督管理委員會認定的計量認證合格實驗室資質,建設部認定的巖土工程勘察資質、基礎施工資質;現有職工435人,專業技術人員占職工總數的21 % ;擁有先進的地質勘查裝備和施工機械設備、測量實驗儀器,能夠滿足大型地質勘查項目的施工要求;曾承擔多項國家和冀晉兩省的大型礦產勘查項目,並獲科技進步、地質找礦等獎項。
  20. Through these studies and analysis, following conclusions could be drawn : ( 1 ) it is necessary to study on harness engineering of landslide and dangerous rock since the main representations of this geological hazard are landslide and dangerous rock through geological investigation ; ( 2 ) it can be concluded though stability analysis that the dingzhuang landslide is stable naturally, which is identical to the in - situ investigation ; ( 3 ) through stability analysis, the landslide would slide if the water level dropped down from 175. 10m to 156. 0m and it rained successively after the three gorges reservoir work. ( 4 ) according to the results of calculation and the characteristic of the landslide, it is suggested that such measures as unloading at upper part, anchorage and pile supporting system and drainage system should be used on the landslide. ( 5 ) according to geological investigation, there are three kinds of dangerous rock in the engineering, those are failing - down rock, collapsing rock and sliding rock

    因此有必要對滑坡進行治理; ( 4 )根據滑坡推力計算結果和本滑坡屬牽引式滑坡的特點,滑坡體上部相對較穩定,中下部處于基本穩定或不穩定狀態,因此建議此滑坡治理採用上部削坡減載與錨拉抗滑樁、擋墻進行支擋結合的處理方法,同時結合截排水等措施進行綜合治理; ( 5 )根據地勘資料,通過對危巖體的形態、規模、基座和底界層及分佈特點和分析,將本工程危巖體失穩崩塌的方式歸納為墜落式、傾倒式和滑塌式三種類型並分別提出相應的穩定性計算方法; ( 6 )分別對本工程中的危巖體進行了穩定性計算,並且發現其都處于不穩定狀態,因此根據實際情況分別提出相應襯砌支撐和清理等加固治理措施,最後還對加固后的危巖體進行了校核計算,滿足要求。
分享友人