line of section 中文意思是什麼

line of section 解釋
剖面線
  • line : n 1 線;繩索;釣絲;測深度用繩,捲尺。 a fishing line 釣魚線。 be clever with rod and line 會釣魚...
  • of : OF =Old French 古法語。
  • section : n 1 (外科、解剖的)切斷;切割;切開。2 【外科】切片,【金相】磨石。3 (果子的)瓣。4 【數學】截...
  1. The thesis has summarized the development of the oblique - pull bridge, its construction technology and the importance of bridge construction control, then has introduced project general situation, and has narrated detailed regulation, organization construction, the major work and difficult part of this bridge construction control. the following is the key part of this thesis, firstly, it has introduced the experiment work of early stage, structural calculation and its theoretical result : the absolute altitude of each operating mode, the absolute altitude of building mould in each section and the absolute altitude after pouring concrete ; then, it has discussed the method and content of the line shape control of the main beam, actual absolute altitude of building mould is put forward, and it has described the method of structural stress monitoring, how to arrange measure point and collect data, and how to analyze data. it has also narrated the method of rope force detection and structural temperature inspection

    本論文在總結了斜拉橋的發展及其施工工藝,並指出了橋梁施工控制的重要性之後,簡要的介紹了工程概況,敘述了炳草崗金沙江大橋監控細則、組織機構及監控的主要工作和難點部分;論文的核心部分,在介紹了炳草崗金沙江大橋施工控制與監測工作的前期實驗工作和施工各工況標高、各節段支模標高、澆注混凝土后的標高的結構計算和其理論計算結果之後,詳細論述了主梁的標高線形控制方法和內容,實際支模標高的提出,結構應力監控的方法、布點、測讀及其對測讀數據的合理分析方法,索力檢測和結構溫度監測的方法。
  2. Combined with the real example of monitoring pressure on the supporting system in the long span underground space of dk7 + 692 section at jiao - xin line of chongqing light railway, it is set forth the methods about choosing the support system and its parameter, digging methods of underground space, measuring and testing methods for the stress of the support system ; the testing results and variation pattern were analyzed for the stress of the initial supporting i - steel axial stress of bolt, stress of shot - concrete, supporting pressure of temporary i - steel and stress of steel of the second lining, then, the reason for deformation of the support system induced by sharp increase of i - steel was determined

    摘要結合重慶市輕軌較新線大坪車站大跨度地下空間dk7 + 692斷面施工支護體應力監測的工程實例,闡述了該大跨度地下空間支護結構的參數選擇、地下空間的開挖方法、支護體結構的應力量測方法及測試手段;分析了支護體初期支護工字鋼拱應力、錨桿軸力、噴射混凝土內應力、臨時工字鋼支撐應力、二次襯砌鋼筋應力等測試結果和變化規律;確定了工字鋼拱應力急劇增大而可能引起支護體系失穩的原因。
  3. In essence in terms of political line, this section talked of some revolution ; however in practice it assumed a reformistcharacter and moved along in a pseudo - reformist direction

    實質上,這一派在政治路線的術語上談論一些革命,然而在實踐中卻表現出改良主義的性質,並沿著假革命-改良主義的方向發展。
  4. Furthermore, we own a section of special - used railway line of 0. 864km with an available length of 400m as well as 48 platform cargo spaces. additional, the company is equipped with 3 sets of forklifts, crane trucks, and shaoxian cranes each, 8 belt - conveyers of all specifications

    高溫保鮮冷庫四棟1250平方米設有一條0 . 864km的鐵路專用線,有效使用長度400m ,站臺貨位48個,叉車汽車吊少先吊各3臺,各種規格皮帶運輸機8臺。
  5. Article 61 for those who violate the provisions of section 2 of article 11 of this law by illegally occupying or utilizing the land for substation facilities, transmission line corridors, and cable channels, the local people ' s governments at and above the county level shall order them to rectify within a given time period ; if a rectification is not made within the specified time, the obstacles shall be forcefully eliminated

    第六十一條違反本法第十一條第二款的規定,非法佔用變電設施用地、輸電線路走廊或者電纜通道的,由縣級以上地方人民政府責令限期改正;逾期不改正的,強制清除障礙。
  6. This process is as follows : firstly, the data of different section contour and of section line have been obtained by reverse - engineering ; secondly, non - uniform b - spline approximation algorithm is used to fit the discrete data ; then the data have been optimized and reduced by adopting adaptive sampling of key points of the fitted curve based on vertical distance, sequently the adaptive sampling data is transformed into the format of the. ibl file of the famous 3 - d design software pro / e. therefore we reconstruct the surface and a model is generated ; lastly, the effectiveness of the adopted algorithm and modeling approach are demonstrated by the experiments

    建模型的過程中,首先運用逆向工程測量方法,獲得曲面物體上不同截面輪廓線的測量數據點列,接著對測量數據點進行平滑處理,用最小二乘法求解基於數據點列的控制多邊形,以非均勻三次b樣條曲線擬合截面輪廓曲線;然後利用基於垂距的數據采樣演算法,對擬合曲線上的數據點進行重新采樣,達到優化數據點的分佈及減少描述曲線數據量的目的。
  7. In the paper, the transmission power of section constituted by the assigned branch is seen as objective function, assigning the adjustable generators both in sending system and receiving system, assigning the faults set, including the constraint conditions such as the differences between the angles of rotor and the inertia center angel of the whole system, the thermal stability of branch and node voltage, obtaining the results by using interior - point solution and line - predominant jordan

    本文提出的考慮暫態穩定約束的可用輸電能力演算法是以指定線路組成的斷面的傳輸功率為目標函數,指定送端系統和受端系統中參考調節的發電機,指定故障集情況下,以發電機轉子相對全系統慣性中心的角度差、線路熱穩定、節點電壓等構成約束條件,採用內點法和行主元約當逐行消去法求解問題的最優解。
  8. In order to generate tool - path quickly, another method is presented. it can generate interference free tool - path directly from the section line of the triangulated surface model. search each vertex of the model to get the triangles which may be interfered using the radius of the cutter

    為了解決這一問題,本文又提出了基於加工曲面的截平面法,通過刀具投影和曲面模型節點坐標的位置關系確定可能發生干涉的小三角片的集合,以加快乾涉檢測的速度,然後在這個集合上生成無干涉刀位點。
  9. A department store manager pleaded guilty before judge line of the district court today january 17 to two charges on signing incorrect returns, contrary to section 82 of the inland revenue ordinance

    一名百貨公司經理今日一月十七日在區域法院承認兩項簽署不正確報稅表的蓄意逃稅罪行,違反稅務條例第82 1 d條。
  10. Customers from huizhou, shenzhen and dongguan should pass humen bridge and the nansha dadao of panyu district to shiqiao, then drive on the guangzhou ? zhuhai line of 105 national road until you reach the traffic post of midea group in beijiao ( the crossing of sanhong bridge ), then turn right to sanle lu and drive along to lecong crossroads, turn left and drive along for 200m and you will reach sunlink north section furniture city of lecong ; or you can drive in the direction to foshan through guangzhou - shenzhen highway until you reach shunde lunjiao crossroads ( longzhou lu ) where you can drive to foshan and longjiang

    惠州、深圳、東莞方向客人,經虎門大橋番禺南沙大道到市橋走105國道廣珠線到北?美的集團交通崗(即三洪橋大橋路口)右轉?三樂路直行到樂從立交橋左轉200米即到樂從順聯北區家私城,或走廣深高速往佛山方向,在順德倫教立交橋(龍洲路) ,可往佛山、龍江方向。
  11. The author also uses the computation by tabulation to test the to all kind of possible planning schema of section station, and figure out the cost of transportation by the component of car flow from the viewpoint of economical evaluatioa at last, a feasible planning schema about section station of xiang - shi line is drawn

    並採用行車組織中慣用的表格計演算法分析驗證各種區段站設置方案的優劣,又從經濟評價的角度計算各種區段站設置方案條件下可能產生的有調中轉車流和無調中轉車流的數量,計算出各種方案的運輸成本費用,進一步論證襄石線區段站設置方案的可行性。
  12. Successful application to many station jobsites of the fu - ba line of beijing metro program shows that using the cavern - pile method in loose soft stratum for excavating shallow buried large section tunnels is practicable. therefore it has broad prospect for application

    在北京地鐵「復一八線」多個車站工程中的成功應用,充分證明採用淺埋暗挖洞樁法在鬆散軟弱地層中進行淺埋大斷面洞室的開挖是可行的,具有良好的發展前景和推廣價值。
  13. In chapter 1, the aim of the study is proposed. the development and present situation of section processing, straighten anti - curve line method and visual inspect technology are introduced. at last, the main content of this paper is proposed

    本論文共六章,具體內容為:第1章概述了國內外船體型材加工的現狀、逆直線法的研究現狀以及視覺檢測技術的發展狀況,論述了進行本課題研究的目的及意義,提出了本文研究的主要內容。
  14. Due to the road width shortfall on section 4 of wufu road and west river road, this section is planned as a single track 3. 14 kilometers long. this lrt line is planned to be mainly of the at - grade type, except for the area at the intersection of section 3 of chushan road and section 4 of kishon road, as well as on the north side of genko bridge over the love river, where underground sections are planned

    另考量政府財政負荷,與施工對於市區交通沖擊太大,並經分析評估后建議優先興建路網,路線總長20 . 07公里,其中紅線15 . 96公里,設19座車站;綠線4 . 11公里,設5座車站,以88年幣值估算,總建造成本約需新臺幣90億元。
  15. Due to the road width shortfall on section 4 of wufu road and west river road, this section is planned as a single track 3. 14 kilometers long. this lrt line is planned to be mainly of the at - grade type, except for the area at the intersection of section 3 of chushan road and section 4 of kishon road, as well as on the north side of genko bridge over the love river, where underground sections are planned. there will be 23 stations on the double - rail sections and 9 stations on the single rail sections

    並提出其輕軌系統優先發展路網,建議路線全長約9 . 6公里,設置9個車站,總成本以88年幣值估算,約需新臺幣86億,包括2 . 2公里高架,佔全長之23 , 2個高架站; 0 . 7公里地下,佔全長之7 , 1個地下車站;其餘6 . 7公里為平面型式,佔全長之70 , 6個地面車站。
  16. There are five sections in this paper. in the first section, the definition of the welfare costs of inflation is introduced and a brief summary about the previous researches is done to show where this line of research stands today. in a word, an assessment of the welfare costs of inflation requires a sound understanding of the benefits of monetary exchange relative to alternative payment arrangement or, equivalently, a theory of why money is useful

    第一部分給出了平穩通貨膨脹(各期的通貨膨脹水平保持相同)下,通貨膨脹福利成本的定義,即在某一通貨膨脹水平下,需要補貼給公眾多少收入,才能使他們的效用水平與帕累托最優狀態下的效用水平保持一致;並對前人關于這一問題的研究做了較為詳細的綜述。
  17. When you select this sign, all subsequent lines up to the matching closing brace collapse under the top - most line of this section, and a plus - sign symbol appears

    選擇此符號時,該行以下一直到含有匹配的大括號右半部分( " } " )的行中所有的行都會被折疊到此代碼段的最頂行之下,同時出現一個加號( + ) 。
  18. According to the situation that the map cracking appears in some fill section in the first stage construction of the connecting line of bay bridge in zhanjiang city, this paper makes the experimental analysis on it and advances some corresponding measures

    根據湛江海灣大橋連接線一期工程某些填方路段出現龜裂的情況,進行了試驗分析並提出了相應措施。
  19. The sequence to solve a overcurrent line of a feeder is : load transference to another feeder, reduction the reactive power and finally increase the section of the cable

    規劃一個饋線線路(設備)的一條過流主幹路的順序是:了解負荷轉移至另一個饋線線路(設備)過程中,將無功功率降低最終就要增加電纜。
  20. According to the rheological properties of melted abs filament during extrusion from fdm ' s nozzle, on the basis of research on extruded filament section shape, the compensation model of ideal contour line is established, and a new technique for compensating inner or outer contour line of workpiece is put forward, which should depend on the real width of extruded filament ( instead of nozzle radius ) and the real dimensional shrinkage of workpiece

    根據abs絲從噴頭擠出過程中的流變性能,在研究fdm工藝噴頭擠出絲截面形狀的基礎上,建立了理想輪廓線的補償模型,並提出了根據擠出絲實際寬度(而非噴嘴孔直徑)和零件尺寸實際收縮量補償零件內、外輪廓的新方法,驗證試驗結果表明該補償模型和補償方法正確可行。
分享友人