multi-project scheduling 中文意思是什麼

multi-project scheduling 解釋
多項目進度安排
  • multi : 並聯的,多路系統
  • project : vt 1 投擲,拋出;發射(炮彈等);噴射。2 使突出,使凸出。3 設計,規劃,計劃,打算,籌劃。4 投影;...
  • scheduling : 編排;調度
  1. This dissertation studies the resource - constrained multi - project scheduling

    研究多型號資源能力平衡方法。
  2. In this project that comes from shanghai inventec inc we investigate the multi - task scheduling algorithm mostly. and for the policy and technique of some in common use and classical algorithms, we study that emphatically

    本課題來源於上海英業達股份有限公司嵌入式開發項目,在實際系統設計中,我們主要以嵌入式實時系統多任務調度演算法為核心,在內核的實時性和多任務處理方面進行了深入研究。
  3. Aimed at the characteristics of multi - project production, multi - project production scheduling mode, based on two - level coordination, is developed to control plans inside enterprise by extending mrpii / opt in the single project to multi - project enterprise. the hybrid framework of multi - agents based multi - project production scheduling system is presented so that complex multi - project production scheduling problem is decomposed and predigested. excellent scheduling algorithms can be integrated on this supporting flat

    針對多型號生產的特點,將單型號內部的mrpii / opt擴展到整個多型號企業,提出基於二級協調的多型號生產調度運行模式,以便更有效地控制企業內部的計劃;提出基於多agent的多型號生產調度系統模型,使復雜的多型號生產調度問題得以分解和簡化,並為進一步有效集成其它優良的調度策略和演算法建立一個支撐平臺。
  4. Based on deep analysis of current research literature on production scheduling optimization methods and artificial intelligent techniques, aiming at multi - project cross - parallel production 、 pressure of critical resource shared and environmental incertitude, this dissertation proposes solutions to several key techniques of multi - agents based multi - project production scheduling system and develop a prototype system. this dissertation studies agent model and its construction methods for multi - project production scheduling mode

    本文結合國防科工委項目「支持erp的軍工企業ptm2系統」 ,在深入分析生產調度優化方法與人工智慧技術的國內外研究現狀基礎之上,針對多型號企業的多型號交叉并行生產、共享關鍵資源的壓力以及環境的不確定性,提出了基於多agent的多型號生產調度系統中若干關鍵技術的解決方案,在此基礎上開發了mppss系統。
  5. To satisfy the requirements of muliti - layer network scheduling and planning in aeorautic project, develops the present two - stage network planning and puts forward the multi - stage network planning model and its time parameters calculation model

    結合航空企業項目進度計劃的多層次性需求,對現有的兩階網路計劃技術進行了擴展,提出多階網路計劃模型,並給出了時間參數計算的數學模型。
分享友人