post of verification 中文意思是什麼

post of verification 解釋
檢查站
  • post : n 1 (被指定的)地位,崗位;職位,職守。2 【軍事】哨所,站;哨兵警戒區;〈轉義〉哨兵,衛兵。3 基...
  • of : OF =Old French 古法語。
  • verification : n. 1. 證實,證明,確定;核驗,驗證,核對;檢驗,校驗。2. 【法律】訴狀[答辯書]結尾的舉證說明。
  1. Neighborhood committees shall implementing investigation and verification of the filled application form and post the list of guarantee object and accept supervision of mass

    (二)居委會對其填寫的申請表進行調查核實,並以居委會為單位張榜公布保障對象名單,接受群眾監督。
  2. If you submit the application by post or via drop - in box, you are required to provide photostat copies of your hong kong identity cards, and the consenting parent or legal guardian s hong kong identity card or valid travel document where applicable upon submission of application. you should produce the original copies of such documents together with your previous passport, document of identity for visa purposes or certificate of identity for verification upon collection of your passport

    如以郵遞或投遞方式交申請,須遞交你的香港身份證副本,及同意這項申請的父母或合法監護人的香港身份證或旅行證副本如適用者,在領取新?照時必須出示該等證件及你的舊?照簽證身份書或身份證書正本以供核實。
  3. During the digital video post - processing project adapting scientific verification flow we apply verification theory and skills, which makes satisfied quality of design

    驗證獨立化也為驗證的質量管理提供基礎。通過提高驗證流程的質量來保證驗證的質量是全面質量管理的核心思想。
  4. It presents the verification strategy used in the whole eda design flow of the chip. the simulation on module level ( inc. post - layout ) uses the software event - driven simulator, the simulation of the associated modules or whole system uses cycle - based simulator and hardware emulator, for the gate - level netlist produced by using top - down design flow, the sta tool can analyze the static timing, and more formal verification is used to ensure the correct function

    本章還提出了系統在整個eda設計流程中的設計驗證策略方法:模塊級的模擬(包括布線后的模擬)全部採用事件驅動式的軟體模擬工具來驗證,各大模塊的聯合模擬及整個晶元的功能驗證(寄存器傳輸級與門級)使用基於周期的模擬工具和硬體模擬器;對于採用top - down的設計方法得到的門級網表使用專門的靜態時序分析工具來進行時序分析以及採用形式驗證來保證正確的功能。
  5. Box 68777 ". after verification of the request, hongkong post will send you a new pin envelop and arrange to reset your e - cert pin at a designated post office

    當審批程序完成後,香港郵政另行寄上新的密碼信封及安排你到指定郵政局重設密碼。
  6. Special operators in charge of safe production in mining enterprises must receive special training ; they may take up a post of such duty only after they have obtained a certificate of operation qualification after passing due examination and verification

    礦山企業安全生產的特種作業人員必須接受專門培訓,經考核合格取得操作資格證書的,方可上崗作業。
  7. These efforts are supplemented by regular visits by department of commerce experts, who spend several days at a time in hong kong conducting pre - shipment and post - shipment verification checks

    加強檢查的另一做法是商務部專家經常前往香港,每次用幾天時間做發貨前和發貨后的核實檢查。
  8. And the process of functional verification consists of the implementation of rtl ( register transfer level ) simulation, gate level simulation and post - layout simulation in the process of design

    驗證最關鍵的是測試方案的制定,而功能驗證的過程是在於在設計過程中實施rtl級模擬、門級模擬和后模擬。
  9. Postgraduate : pu liangtao supervisor : professor shang shouing senior engineer huang gang the research on influence of the post - casting section of continuous rigid bridge suffered vibration of train travelling is preseated in this thesis according to related project. based on theorize analysis, expriments of material properties and members under deformed vibration, verification of isolating and reducing vibration in building as well as construction technology and quality control, the effect of post - casting section suffered deformed vibration is studied thoroughly. through the analysis of 28 tests of shear strength with post - casting section under deformed vibration, the related laws are deduced. and the analysis of finite element method, the studies of quality control and construction technology are also completed

    通過現場測試、模型和試塊的模擬振動成型試驗、加載破壞試驗、理論分析、現場減振隔振試驗、施工工藝和質量控制等一系列全面、系統的研究工作,認真、深入地研究了現澆混凝土受火車行駛振動的影響,特別是在約束構件后澆濕接頭區段內現澆混凝土受火車行駛振動影響研究方面作出了開創性的工作,完成了振動使濕接頭區段受到彎曲變形影響條件下的構件模擬振動試驗、抗剪強度試驗。
  10. The design flow includes the construction of basic cell libraries, placing & routing, layout verification and post - layout simulation, etc. moreover, the layout design of basic cells and functional modules, the measures of circuit protection and methods to reduce the parasitic effect are also been discussed

    這個流程介紹了與intelm80c287協處理器完全兼容的協處理器的後端設計過程。介紹了協處理器設計過程中基本單元和一些主要功能模塊的設計,以及設計中的保護措施和減少寄生效應的設計方法。
分享友人