pouring process 中文意思是什麼

pouring process 解釋
澆注法
  • pouring : 澆鑄, 澆注
  • process : n 1 進行,經過;過程,歷程;作用。 2 處置,方法,步驟;加工處理,工藝程序,工序;製作法。3 【攝影...
  1. The wax setting and casting process is complicate process with a series of procedures, including model creating, spruing and construction, rubber mold vulcanization and cutting, wax models injection, stone setting in wax model, wax tree creating, investing, investment mold burning - out, metal melting and pouring, casting cooling and divesting, etc

    蠟鑲鑄造是一個多工序的復雜工藝過程,包括母版製作、開設水線、製作橡膠模、製作蠟模、寶石鑲嵌到蠟模、種蠟樹、製作石膏型、石膏型脫蠟焙燒、金屬熔煉澆注、飾件冷卻清理等。
  2. These physical and chemical couplings lead to a very complex transient process during the concrete pouring

    由於這些物理,化學因素的耦合作用,使混凝土施工過程成為一個十分復雜的時變過程。
  3. The influences of foundry process and method factors on combination effect was investigated including the influences of gating system design, pouring temperature, atmospheric pressure of mould cavity, thickness of cast - penetrated layer and so on

    作者就澆注系統、澆注溫度、型腔氣壓、鑄滲層厚度等工藝參數對鑄滲效果的影響進行了試驗研究。
  4. The research showed that basin is the more important feeding resource than runner in runner type gating system in lost wax casting. therefore, on the basis of the basin as feeding resource, runner and ingate as feeding channel, a new design method for runner type pouring and feeding system in investment casting was developed. the corresponding feeding mathematical pattern and allowable total weight listed for casting cluster with different basin were established after analyzing the practical feeding of basin and the calculating process for design was described in detail

    在熔模鑄造橫澆道型澆注系統中,澆口杯是比橫澆道更為重要的補縮源,因此在立足於澆口杯為補縮源、橫澆道和內澆道為澆注補縮通道的基礎上,開發了適用於熔模鑄造橫澆道型澆注補縮系統設計的新設計方法,在詳細分析了澆口杯的實際補縮情況后,建立了相應的數學補縮模式和不同澆口杯的鑄件組許用鑄件總質量表,並具體介紹了設計計算過程。
  5. The company is located at zhejiang ningbo technology park and it engages mainly in the smelting equipment of magnesium and aluminum allo y, quantitative conveying ana pouring equipment, gas protection device and the magnesium alloy pressure casting parts. the more, it can provide services of technology development, achievements transferring, process revamping, material inspection, computer stimulation, etc. the company is based on the strong technical strength of the military technology and the research institutes and has a large number of senior research personnel. the company owns many patents and know - hows, among which the magnesium alloy smelting, gas protection, quantitative pouringas well as the later on processing technology has reached the world advanced levet. the company sticks to aim of quality first, credit supreme and would like to provide best

    公司位於浙江省寧波市科技園區凌雲路199號,是以生產鎂合金鑄件為主業,包括壓鑄低壓鑄造等,並具備技術開發成果轉化等功能的綜合性科技公司,以兵器工業和科研院所的雄厚實力為依託,擁有自主知識產權的多項專利專有技術和國際一流的技術裝備,擁有教授博士碩士等高級專業研究人員數名在鎂合金鑄造產品研製及后續加工方面,我公司擁有技術領先優勢,目前我公司為電動工具汽車摩托車零部件it行業以及軍工方面提供配套產品配套設備技術咨詢與技術服務技術轉讓及聯合開發,還可以進行工藝改造材料檢測檢驗計算機模擬等多項服務
  6. Performance and usage : they are mainly used to process polgolefin thermoplastics, e. g : plastic basin and barrel ; plastic bottle and can ; plastic hollow container and tool ; woven bag, agricultural film and packaging film materials ; similar leftover bits and pieces of industrial material, pouring materials, etc

    性能用途:主要用於加工聚烯類熱塑性塑料如:塑料盆、桶;塑料瓶、罐;塑料中空容器具;編織袋、農地膜、包裝膜類材料;以及同類邊角余料、澆口料等。
  7. The effect of pouring arch circle to support ' s deformation is studied. the pour sequence of main arch circle is laid down by the principle that support ' s deformation is minimal in the process of pouring concrete

    研究了拱圈澆注對支架變形的影響關系,遵循分段灌注順序應使支架在混凝土灌注過程中變形幅度最小的原則,制定了主拱圈灌注順序。
  8. Liquid - solid extrusion of composite material is a new kind of metal forming process, which has been developed in recent years with a promising practical application prospect for its simple working procedure, low cost and good workpiece performance. through a lot of experiments, the optimization and chosing method of key process parameters ( pouring temperature, mold warm - up temperature, impregnating pressure, impregnating time ) has been mastered. under the precondition of appropriate chosing these parameters, the effective control of extrusion velocity is the key of mading good workpiece. but the control of extrusion velocity remains a handwork, and it is heavily affected by such uncertainties as a handler ' s knowledge and skill about the process. in order to solve the problem, the automatic control of the extrusion velocity is studied, and a computer control system is also designed under existing condition

    通過大量實驗,已掌握了關鍵工藝參數(熔液澆注溫度、擠壓模預熱溫度、浸漬時間、浸漬力)的優化選取方法。在合理選取關鍵工藝參數的前提下,擠壓速度的控制是成形出質量良好製件的關鍵。但是,目前對于擠壓速度的控制仍停留在手動控制階段,利用該工藝制備管、棒材製件的成功與否受操作者對該工藝及其設備的經驗及熟練程度等不確定因素影響很大。
  9. The computing model is optimized according to the model board trolley installation form and the concrete pouring process

    根據現場測量時模板臺車的結構安裝形式和混凝土澆注的施工步驟,反復修整完善計算模型。
  10. Fabrication of the box beam is divided into such parts as reinforcement, formwork, concreting, prestressing, moving and storing of beam, pipe grouting under pressure, end sealing of the beam, water - proof layer on the bridge surface system, protective coating etc. the paper makes description of effective box beam construction technology and workmanship which can be adopted in other projects, such technologies as : manufacturing and fixing of reinforcement, steel reinforcement fixing baseplate, web plate and top plate respectively and lifting the steel skeleton into form, requirements of design and manufacturing and way of utilization for dismantling - erection type formwork and hydraulic formwork, optimization of concrete ratio, concrete pouring process of two ends of beam in priority over the middle, in sequence of first baseplate followed by web plate and top plate at last, concrete pouring in inclined section and in horizontal layer, concrete vibration mainly by external vibrator in assistance with internal vibrator, methods and regulation for steam curing of concrete, dual controls over stress and strain to ensure quality of prestressing workmanship, construction method of effective beam moving by heavy - weight special moving facility, some regulations and key notes about construction of grouting under pressure, beam ends sealing, water - proof layer on the bridge surface system, protective coating

    箱梁製造由鋼筋工程、模板工程、混凝土工程、預應力工程、移存梁工程、孔道壓漿工程、梁體封端工程、橋面防水層和保護層工程等施工環節組成。文中介紹的採用胎具製作和綁扎鋼筋,分底腹板和頂板分別綁扎並吊裝鋼筋骨架入模;拆裝式和液壓式兩種模板的設計、製作要求和使用方法;綜合考慮、優化混凝土配合比,混凝土灌注從兩端至中間、先底板、后腹板、再頂板的施工順序和斜向分段、腹板水平分層、附著式振搗為主、插入式搗固為輔的施工工藝,蒸汽養護的方法和規定;應力應變雙控制確保預應力施工質量的施工技術;採用重物移運器有效移梁的施工方法;壓漿、封端、橋面防水層和保護層施工的一些規定和注意事項等都是對箱梁製造行之有效的施工技術和施工方法,並可為以後類似施工作借鑒。
  11. In order to simulate the construction process and the effect of concrete pouring temperature and outside temperature on temperature field and thermal stress field in the dam, temperature field and thermal stress field are calculated layer by layer. the calculation step during construction is 0. 25 day, and during operation the diffusion of hydration heat of concrete is over and elastic modulus is basically stable, changeable step is used

    為了研究施工進度、混凝土澆築溫度、外界溫度對壩體溫度場和應力場的影響,按碾壓混凝土施工方法每澆築一層(層厚0 . 3m ,澆築時間6小時)計算一次溫度場和應力場,這樣,施工期計算步長為0 . 25天,運行期因混凝土水化發熱已結束,且彈模基本穩定,故採用變步長計算。
  12. Using proper baking and pouring process for plaster mold, the castings with qualified size and good surface quality could be obtained

    在此基礎上,對工作石膏型採用合理的烘烤和澆注工藝,得到了尺寸合格、表面質量好的鑄件。
  13. The epc process used for producing of cast iron grinding balls was introduced including : chemical composition of grinding balls, melting process, production of eps patterns and ball patterns assembling process, pouring process, as well as equipment and investment

    摘要介紹消失模鑄造磨球的化學成分、熔煉工藝、磨球生產工藝流程、 eps模的製作和組串工藝,澆注工藝,以及設備和投資。
  14. The defect of crack in the engine block of 8170 diesel engine has beem researched and analyzed, which can be solved and avoided through the following measures : optimizing the structure of engine block casting, improving alloying technology, perfecting pouring process and adopting normal inoculation before furnace and metal - stream inoculation during the period of pouring

    摘要對8170缸體裂紋缺陷進行了探討分析,通過優化鑄件結構,改進合金化工藝,完善澆注工藝以及隨流孕育與爐前孕育工藝相結合等措施,使裂紋缺陷解決。
  15. The alloy component and the process parameters of the precision casting ( including the exit temperature from furnace, pouring temperature, mould preheating temperature, holding time, cooling form ) have a certain influence on the problem of the blade brittles

    摘要合金含量、精鑄工藝參數(出爐溫度、澆鑄溫度、模殼預熱溫度、保溫時間、冷卻方式)對葉片脆性問題存在一定的影響。
  16. The casting dimension accuracy reached ct10 class and even higher b adopting following measures : controlling foaming agent content, strictly controlling pattern manufacture, patterns welding and assembling, filling sand and moulding, as well as controlling pouring process

    採用控制發泡劑含量和嚴格模樣製作、粘結和組模工序、填砂造型工序和澆注工序中各關鍵技術措施,使產出的鑄件尺寸精度達到了ct10級以上。
  17. We adopt the semi continuous pouring process and mainly manufacture the products marked 1xxx 3xxx 4xxx 7xxx 8xxx and the like by means of 1500 hot - rolling mill, 1400 cold - rolling mill, 1400 mill of aluminum strip and foil, 800 roughing or finishing aluminum foil mill

    產品介紹本公司採用半連續澆鑄工藝,經1500熱軋機, 1400冷軋機, 1400鋁帶箔軋機及800鋁箔粗中精軋機等鋁材,主要生產1xxx , 3xxx , 4xxx , 7xxx , 8xxx等系列牌號。
  18. Because the changes of the concrete structure dynamics properties will happen during pouring process, the responses are the transient responses

    由於混凝土的力學特性隨施工齡期變化,導致響應的時變性,如彈性模量。
  19. Abstract : the pouring process of the beer pouring production line was analyzed in this paper, brought about the intelligent control for constant of beer and get to a fine control results by means of pressure sensor

    文摘:本文分析了啤酒灌裝生產線的啤酒充裝過程,提出用壓力傳感器,實現對啤酒恆量灌裝的智能控制,獲得較好的控制效果。
  20. The surface cracks of concrete dam in the fengman projects were surveyed and detected with non - damage detection methods in the fields. the pouring process of the concrete was simulated with finite element method, and then the stress distribution in the dam was computed

    對豐滿大壩溢流壩段新澆混凝土裂縫進行了現場調查、無損性態檢測;採用有限元法模擬澆築過程中混凝土內的應力分佈。
分享友人