reservoir volume 中文意思是什麼

reservoir volume 解釋
貯氣容積
  • reservoir : n. 1. 貯藏所;貯氣筒;貯水池,水庫;貯水槽,水槽;貯存器;貯油器,油筒,油箱;貯墨管;【解剖學】貯液囊。2. (知識、精力等的)貯藏,蓄積。vt. 貯藏;在…設貯藏所[貯水槽]。
  • volume : n. 1. 卷,冊;書籍;【歷史】書卷,卷軸。2. 〈常 pl. 〉大塊,大量,許多。3. 體積;容積;分量,額;【物、樂】音量;強度,響度。
  1. In order to reduce the re - deposit volume of the dredged channel, the method must be based on decreasing the oncoming sediment, changing the mouth site, builting the sediment control dam and raising the reservoir level

    為了最大限度地減小疏浚挖槽的回淤量,必須依靠控制上游來沙量、調整入水口門位置、加設防淤堤及提高庫水位等手段,而不能通過調整挖泥槽寬度、位置及數量等措施來達到目的。
  2. Finite volume method is appilied in numerical modeling of the flow in no - pressure tunnel of high water reservoir in this paper. i select standard k - turbulence modeling that put forward by launder and spalding in 1972 by weighted poly - turbulence modeling. the difficulty is that there is free surface in flow, but free surface problem ' s calculating region is indefinitely

    本文利用有限體積法對高水頭下水庫無壓泄水洞水流進行了紊流數值模擬,根據多種紊流模型的優缺點進行比較,選擇了launder和spalding於1972年提出的標準的k ?紊流模型。
  3. Baf has many advantages, such as small volume, little covering earth and hydraulic retention time ( hrt ), high treatment efficiency and effluent water quality, low investment and running cost etc. baf has been used widely for many years in the world and been used to treat several wastewater in our country. in this paper, baf was studied on guanting reservoir water source treatment with pilot scale and homemade expanded clay as filtration media

    曝氣生物濾池( biologicalaeratedfilter ,簡稱baf ,或biologicalfiltrationoxidizationreactor ,簡稱biofor )工藝具有體積小、容積負荷高、水力負荷大、水力停留時間短、所需基建投資少、處理出水水質好等特點,國外已廣泛應用,國內也在多個行業的水處理中成功應用。
  4. The summer flood reason is the key period for reservoir controlling flood and achieving benefit because this stage is longer and the volume of flood is larger

    對水庫春汛的防洪風險進行了定性分析。水庫夏汛時間長,洪量大,是水庫確保防洪安全和實現興利效益的關鍵時期。
  5. The water often changes, and the volume of flow has difference between year of abundance and year of drain. so the asset of reservoir is not a defined thing

    但由於水庫中的水資源的數量在豐水期和枯水期差異較大,使得水域的深度、廣度總是處于不特定之中,因此,水庫財產具有不特定性。
  6. The whole project comprised the building of the dam, a 2, 428 - yard tunnel driven through the wong nai chung gap valley and a 5, 500 - yard brick and stone aqueduct to connect the reservoir with the storage tank and filter beds at albany road. each day the volume of water being conveyed reached 7 million gallons. the 6 filter beds of the project were situated on the eastern side of the albany nullah ; measuring 3, 245 sq

    除水壩外,其他配套的工程包括: (一)一條長達2 , 428碼、貫穿黃泥涌峽谷的隧道; (二)一條長5 , 500碼的引水道,可連接水塘隧道的亞賓尼濾水池及配水庫,該引水道用石及磚砌成,每天可輸水700萬加侖; (三)位於亞賓尼水渠東部的六個過濾池,該濾水系統面積廣達3 , 245平方碼,深30尺,每天可過濾570萬加侖水,原水過濾后,經一條直徑18寸鐵水管,流入花園道與寶雲道交界的配水庫。
  7. For the reasons of accumulated soils and sands and the amount of precipitation, the volume in the reservoir is dynamic. if the volume in the reservoir is not dispatched correctly, it will result in the overflowing of the dam bank of the reservoir, even in the collapsing of the darn

    庫容又是水庫調度不可忽視的問題,而庫容又與水庫的橫、縱斷面、水位、水深有關,由於泥沙淤積、降水量多少等原因,水庫水量是動態的,不對水庫水量正確調度,會在大洪水時,造成水庫堤壩漫溢甚至垮壩。
  8. Be aimed at the characters of fluvial layered pool, such as serious intrastratal and interlayer heterogeneity, small water flooding volume and low oil displacement efficiency in its high water - cut stage, the fine research work on reservoir heterogeneity model are carried out, and the research is done on the base of geological, logging, production testing materials and production date and with a center of the research of remaining oil. the west 7th block, gudong oilfield is in case. the forming mechanisms of remaining oil and its distributing feature in this area are revealed

    本文針對我國陸相沉積層狀油藏層內及層間儲層非均質性嚴重、高含水期水驅波及體積小、驅油效率低等特點,以剩餘油研究為中心,藉助于數學地質統計及聚類分析等方法,綜合利用孤東七區西的地質、測井、生產測試資料和生產動態信息等,深入開展了儲層非均質模型的精細研究,揭示了在不同規模非均質模型上剩餘油的形成機理和分佈特徵。
  9. The second stage of the uprating engineering works were implemented after the signing of the agreement in august 1979 endorsing the planning report for the second stage extension of the dongshen water supply system. the main works were to extend the pumping facilities at matan, tongxia, zhutang, shaling, shanpu and yantian, and to increase the height of the main dam of shenzhen reservoir by 1 metre. the new works included the construction of a new pumping station - the dongjiang pumping station at the intake point at the riverbank of dongjiang to increase the volume of supply

    第二期工程於1979年8月簽訂《東江深圳供水工程第二期擴建規劃報告》協議后進行,主要是再擴大原工程在馬灘、塘廈、竹塘、沙嶺、上埔及雁田的抽水站,加高深圳水庫主壩1米,新建的工程則包括于新開河口興建東江抽水站,提高供水數量。
  10. Because of inner - layer, interlayer and areal heterogeneity of reservoir, after a long period of water flooding, injected water circulates in high permeability channel, sweep volume cannot be enlarged, and injected water volume of per ton increases a lot

    摘要由於儲層層內、層間及平面不均衡性,經過長期注水開發,導致注入水沿高滲透條帶循環,很難進一步擴大波及體積,使得噸油注水量大幅度增加。
  11. This paper deduces the material balance equation with high content of h2s considering the sulfur deposition, and provides tile material balance equation for the constant volume gas reservoir with high content of h2s

    在考慮硫沉積的基礎上,推導了高含硫氣藏的物質平衡方程,針對定容氣藏的情況,得到了定容高含硫氣藏的物質平衡方程。
  12. And it is also possible to analyze the reservoir property in reservoir framework. taking the reservoir of zonation 6 - 10 in s32 of pucheng oil field in henan province as an example, we founded the detailed reservoir stratigraphic framework through base - level correlation. in the strata frame, sediment distribution and its development are discussed based on sediment volume partitioning and facies differentiation analysis

    依據基準面變化中的過程?沉積響應,分析沉積過程中沉積物體積分配及與其相伴生的相分異,進行等時地層對比,建立精細地層格架,預測儲層空間展布及其非均質性的思路為儲層精細描述提供了新的方向。
  13. Traditionally, the saturated zone is modeled as a simple lumped continuity equation :, dsitqsdt where t is time, s is the total storage in the reservoir, i is the spatially integrated volume of incoming wa - ter, and q is the discharge subsurface runoff which only depends on the total storage s. this kind of subsurface runoff model has many different parame - terizations 10 12, however it has a very common char - acteristic that the subsurface runoff is just a sin - gle - valued storage - discharge function

    對于大尺度水文模型而言,目前常常採用的是集總式的地下徑流機制,其連續性方程一般可表示為d , dsitqst ? 1這里t是時間, s表示整個流域潛水面土壤層的飽和區域總的水分儲存量, i t表示t時刻土壤的非飽和區域向整個潛水面的水分補充量, q s表示僅依賴於水分儲存量s的地下徑流量量
  14. The scour and silting situation of the reversed equalizing pond of shimen hydropower station and the capacity of regulating volume after the flexible dam restored are expounded, the operation mode for shimen reservoir is put forward

    根據實測結果,闡明了石門電站反調節池沖淤形態和橡膠壩恢復后的水量調節能力,提出了石門電站運行調度的基本模式。
  15. With this installation, a supply of irrigation water can be proactively managed depending on usage, as compared to a fixed volume of an inland reservoir, thus consuming water in a more effective manner

    化淡廠完成後,灌溉用水將可因應情況來控制供水量。跟固定容量的蓄水庫相比,用水將可更加有效率。
  16. Members of the public have told me that the volume of vehicular traffic on the tai tam reservoir dam is very high every day. they are concerned that the aged dam may thus be overloaded and collapse

    有市民告知本人,大潭水塘的堤壩每天行車次數頻密,他們擔心該建成已久的堤壩會因不勝負荷而倒塌。
  17. Look back generally to elaborate the development and present situation of the stress - strain model of soil. according to a great deal of data of the test and research of zipingpu reservoir concrete faced rockfill dam ' s material, suggest the more reasonable stress - strain - volume change equation to contain strain softening, dilatancy ( shrinkage ) of the no viscous moraine and gravel. suggest the method to gain the model ' s parameter

    較全面回顧闡述了土體本構模型的發展和現狀,根據紫坪鋪面板堆石壩築壩料的大量試驗研究,提出相對合理的應力應變關系方程,以反映土體的應變軟化、剪脹性,並提出模型參數的求取方法,求取模型參數。
  18. Guishan sliding mass is located just above the intake ( outlet ) of the lower reservoir of the proposed baoquan pumped storage reservoir, being 550 - 800m long from east to west, 260 - 350m wide from south to north, 110m thick in average and up to 210m thick, with a total volume of 21 million cubic meter

    龜山滑坡體位於寶泉抽水蓄能電站引水發電系統下庫進出水口的上方,滑坡體長550 800m ,寬260 350m ,最大厚度210m ,平均110m ,總方量2100 10 ~ 4m ~ 3 ,形成於距今14 21萬年,其穩定性如何直接影響下庫及整個電站的安全。
  19. Analysis on transferable surplus water volume from danjiangkou reservoir for s - n water transfer

    南水北調中線引丹江口水庫棄水可調水量分析
  20. Bulk reservoir volume

    儲層總容積
分享友人