risk project risk 中文意思是什麼

risk project risk 解釋
風險項目風險
  • risk : n 1 風險,危險;冒險。2 【保險】(損失的)風險(率);保險金額;被保險人,被保險物。vt 冒…的危險...
  • project : vt 1 投擲,拋出;發射(炮彈等);噴射。2 使突出,使凸出。3 設計,規劃,計劃,打算,籌劃。4 投影;...
  1. At present, the project risk management of china is in the ascendant

    目前,我國工程項目風險管理方興未艾。
  2. Take the example of ghazi - barotha hydropower project in pakistan, the article illustrate the basic principle and application of project risk management

    文章結合巴基斯坦巴羅塔水電站工程的實例,闡述了項目風險管理的基本原理和具體應用。
  3. It is not only influnce the survival of valin group but also influnce the industrialization progress of hunan province. this book appraised the foreground of the product market, raising money and using money, budget and potential risk of this project by using the method of project evaluation, analysised avail factor and disadvantage factor, then bring forward measures of evading project risk to help erector and bank who provide a loan

    本文運用項目評估方法,對華菱薄板項目的產品市場前景、資金籌措與運用、財務預測與分析及項目潛在風險等方面進行評價,分析項目建設的有利因素和不利影響,得出評估結論,提出規避項目風險的措施,為項目建設單位及項目資金承貸銀行提供指導和幫助。
  4. Meanwhile, the method can be easily popularized. apart form the real estate industry, it can be applied to multi - project risk decision - making in various economic scopes

    同時,該方法具有較強的推廣性,除房地產外,還可以運用於很多經濟領域中的多方案風險決策。
  5. After analyzing the character of risk, i introduce data mining method into risk management, to solve the contradiction between great capacity of data and lack of information, the methods include mathematics statistics and artificial neural network ( ann ). then, i study on the methods of risk management in risk identification, risk evaluation and risk disposal, what is advanced, fault tree analysis method based on fuzzy probability, stochastic simulation method and the topsis method based on interval number all consider the characteristic of risk. finally, i discussed the application of information system ( mis ) in project risk management, and developed a risk management information system

    論文在深入分析了風險特徵之後,將數據挖掘技術引入風險管理,用以解決海量數據與貧乏信息之間的矛盾,所採用的技術有數理統計和人工神經網路( ann )兩種方法;接著,論文對風險識別、風險評價、風險處理中的風險管理方法進行了研究,所提出的基於模糊概率的故障樹技術、隨機模擬技術和基於區間數的topsis方法都體現了風險管理的特點;最後,論文對信息系統( mis )在工程項目風險管理中的應用進行了探討,開發出一個風險管理信息系統。
  6. Then, by means of system analysis, the paper discusses the elements of a construction project. it is from construction project risk ' s source, main body, effect for purpose, the reason, generant modality, and so on. the comprehensive risk management is divided into risk analysis and risk management in this paper

    對工程項目風險因素從工程項目風險的來源、工程項目風險的直接行為主體、工程項目風險對目標的影響、按管理的過程和要素、風險發生的原因、工程項目風險發生的形態、工程項目風險性質的不同角度對工程項目風險進行分析。
  7. Project risk management in institution of higher learning

    高等學校工程項目風險管理
  8. It is clearly a much lower - risk project than the grenade launcher and is already close to maturity ; plans to carry out large - scale troop trials have been drawn up

    事實表明與榴彈發射器相比它是一個低風險的項目並已接近成熟;進行大規模部隊試用的計劃已經制定。
  9. Disscusion on the planning and control of project risk management

    工程項目風險管理規劃與控制探討
  10. The two - stage modeling method takes into account the characteristics of software project risk management and software metrics data, integrates qualitative knowledge and quantitative data. to study the software project iterative process risk ’ s bayesian network model, the definition of cyclic bayesian network is presented, probability convergence property of directed cycle in cyclic bayesian network is proved and probability inference method is put forward

    論文在軟體項目迭代過程風險的貝葉斯網路模型研究中,定義了有環貝葉斯網路,證明了有環貝葉斯網路中有向環的概率收斂性質,給出了有環貝葉斯網路的概率推理方法。
  11. Finally, this paper puts its emphasis on the application of monte - carlo simulation technique in engineering project risk analysis. as a kind of risk analysis technique this method is proved to possess special superiority and extensive applicability through we simulate the cost per square meter of construction part of some engineering

    最後重點論述了蒙特卡羅模擬技術在工程項目風險分析中的應用,並且通過對一個工程的土建工程費用單方直接費進行蒙特卡羅模擬,進一步論證了該方法作為一種風險分析技術具有獨特的優越性和廣泛的適用性。
  12. The basic principle of earned value is introduced in this paper and the contents of project risk management are also included. based on analyzing of merits and shortcomings about earned value and risk management, it is likely to integrate them. the paper has a hot talk about the method of calculating the earned value indexes when the schedule of activity is fixed

    接著,著重討論了項目活動持續時間均服從pert三點估計時項目在各觀察點的掙值績效指標值的計算方法,給出了某一項目在該種情況下各觀察點的最可能的掙值績效指標值的模擬結果,並在分析了這些掙值績效指標值的曲線特徵的基礎上,探討了掙值管理中的風險控制問題。
  13. Qi, anbang and sun xianwei, “ project risk and uncertain cost integrated management method ”, the proceedings of international conference of paqs, tokeyo, japen, dec. 2003

    戚安邦, 「多要素項目集成管理方法研究」 《南開管理評論》 , 2002年第6期。
  14. The aeronautic weapon project is a kind of special project. it has characteristics of hi - technology, high investment, high risk, and long cycle etc. generally total lifecycle of aeronautic weapon embraces project demonstration, project design, project development, design conformation and production conformation stage, there are a large number of risks during each stage, the quality of aeronautic weapon project risk management directly influences the result of the aeronautic weapon project. how to identify every risk and analyze the influence of risk factors in different stage directly affects the result of risk management

    航空武器裝備項目是一種特殊項目,它具有高科技、高投入、高風險、長周期等特徵,一般地,航空武器裝備全壽命周期包括項目論證、方案設計、工程研製、設計定型和生產定型階段,在每個階段里都存在著大量的風險,對航空武器裝備項目風險管理的好壞直接影響著航空武器裝備項目的成敗,而如何準確識別各階段面臨的風險以及分析不同階段各風險因素的影響程度直接影響著風險管理的效果。
  15. Economic evaluation and risk analyzing have critic impact on the success of real estate project development. of course, there are some real estate agents who have applied economic evaluation but lack the knowledge of project risk in housing development. this has led to a large number of idle houses and idle - lying funds and finally, real estate investment ca n ' t bring expected profits

    房地產業又是一種投資大、風險高、回報顯著的行業,經濟評價及風險分析對房地產項目的開發成功與否至關重要,但是,也存在著不少房地產開發商對房地產開發項目的經濟評價方法的應用,對房地產開發的項目風險還缺乏認識,結果造成大量房屋閑置和資金積壓,使房地產開發項目沒有達到所期望的效益。
  16. Firstly the author makes an inquiry into cost and profit, founding a cost forecasting model based on activity. in chapter five, it is studied the constructive price based on enterprise performance, forming the fuzzy synthetic evaluation method firstly which combine enterprise performance and the constructive price. chapter six is on project risk, which building a model on risk evaluation to constructive price

    首先探討的是成本和利潤值的合理確定,提出了基於活動的成本預測模型;其次研究的是基於企業績效的工程造價分析,首次將企業績效水平與工程價格聯系起來,提出了影響工程價格的績效因素評價方法;最後探討了項目風險影響因素,提出了工程造價風險評判的理論模型。
  17. The system theory is adopted to research risk management methods of a large type scientific research project, pointing out that risk management of a large type scientific research project is a sort of synthetical management theory, and method of risk identification, risk estimate and risk response of the project

    指出重大科研項目風險管理是一種綜合性的管理活動,並得出重大科研項目的風險識別、風險分析與風險處理的方法。
  18. In order to know and control the risk resource, risk character and disciplinarian of a large type scientific research project, the risk in the project can be identified accordingly and necessary measures are adopted to avoid or reduce the losses of the project

    摘要為了分析重大科研項目風險的來源、性質和發生規律,及時識別出重大科研項目中存在的風險並採取措施予以解決,通過採用系統論的方法,對重大科研項目各階段的風險管理方法進行研究。
  19. The risk and risk control of the trust invest fund is a systematic project, which includes several aspects as follow

    但是,由於信託投資基金與金融活動密切相關,所以也極易感染金融投資風險。
  20. Because of the stage characteristic of project risk, this paper appraises the project alone. this helps to seize the project risk and provide reliable basis for decision of venture capital

    考慮到風險投資項目的風險階段性特點,本文把風險投資項目從風險企業中分離出來單獨進行評價,有利於正確把握項目風險,為風險投資決策提供可靠依據。
分享友人