rock abutment 中文意思是什麼

rock abutment 解釋
石橋臺
  • rock : n 1 巖,巖石,磐石,巖壁;卵石;〈常 pl 〉〈美口〉石子兒;暗礁,巖礁。2 〈the R 〉直布羅陀 (Gibr...
  • abutment : n. 1. 鄰接,接界;接合(點)。2. 【建築】橋臺,橋座,支柱。
  1. When the rock mass of dam abutment is enclosed by faults, joint fissures and bedding planes, it is necessary to carry out holistic anti - slide stability analysis in order to make the abutment withstand potential slide

    摘要當拱? ?肩巖體為斷層、節理裂隙、層面等結構面所圍成,有可能產生滑移時,就應進行整體抗滑穩定分析。
  2. ( 3 ) ensemble character of structural planes as follows : in left dam abutment, meta basalt schistosity is main, and the structure is clockwise. low dip angle jointing did n ' t develop in rock mass ; in right dam abutment, rupture and jointing structural plane is main, and the structure is reversed. the structure was of obvious macroscopical slaty character

    ( 3 )通過對上述結構面的分析,得出其總體特徵為:左壩肩以變玄武巖片理為主體,呈順向結構,巖體內緩傾角節理極不發育;右壩肩主要為斷裂及節理型結構面,呈反向結構,且具有明顯的宏觀板狀結構特徵,並發育有一定厚度的構造軟巖帶。
  3. Application of caving mining technology with bottom under condition of flat dipping mid - thick body and unstable rock caused the most of trench and bottom drift, located in abutment, to be destroyed and low recovery in south area, xishimen iron mine

    摘要在緩傾斜中厚礦體底板巖性不穩固的條件下,採用有底柱崩落法,由於電耙道大多處于空區邊部應力集中的部位,致使塹溝及底部結構巷道破壞嚴重而使回收率極低,採用無底柱崩落卸壓則可有效解決上述難題。
  4. ( 4 ) rock mass of dam abutment had very complicated distortion in right bank of xia luo - yu damsite

    ( 4 )下落魚壩址右岸壩肩巖體具有極為復雜的變形問題。
  5. Meanwhile, the ansys software of fem is applied for numerical analysis to rock mass deformation process on dam abutment

    同時,採用ansys有限元分析軟體對壩肩巖體變形過程進行了數值模擬分析。
  6. The engineering reaction analysis is divided stability analysis of high rock slope and deformation and skidresistance of rock mass on dam abutment

    工程效應分析分成高邊坡穩定性分析和壩肩變形及抗滑穩定性分析。
  7. Therefore, the deformation mode of compound deformation rock mass on right dam abutment first is analysed before the engineering reaction is studied

    因此,在進行工程效應研究之前,首先進行了右壩肩復雜變形巖體的變形模式研究。
  8. Hereby, at the beginning of geology research and theory analysis, the control effect of rock mass structure to rock mass shape distortion and failure of dam abutment has been threw light on

    據此,從地質研究和理論分析著手,闡明了巖體結構對壩肩巖體變形破壞的控制效應。
  9. In combination with the construction practice of abutment no. 2 great bridge and no. 1 medium - scaled bridge, the paper introduces the construction technology of rock - socketed piles in highway engineering

    摘要通過邊墩2號大橋和羊山1號中橋的施工實踐,介紹嵌巖樁在公路工程中的施工工藝。
  10. The research progressing as follows : ( l ) basic developmental character and engineering control effect of continuous macrostructure plane ( i and ii level ) of dam abutment has been systemically studied. and this kind of structural plane took important effect to appraise rock mass distortion and failure and stability

    論文研究進展主要有以下幾方面: ( 1 )系統研究了壩肩宏觀貫通性結構面(分類中的及級)發育的基本特徵以及它們的工程式控制制效應,闡明了該類貫通性結構面對壩肩巖體變形破壞及巖體穩定性評價起主導作用。
  11. ( 2 ) statistical character and engineering control effect of short and intermittent structural plane ( iiia and iiib level ) of dam abutment has been systemically studied. and this kind of structural plane took important effect to appraise whether latent discrete boundary of massif could be formed and rock mass quality

    ( 2 )系統研究了壩肩短小、斷續性結構面(分類中的_ a類和_ b )的統計特徵及其工程式控制制效應,闡明了此類結構面對能否構成壩肩巖體塊體的潛在分離邊界以及對巖體質量的評價起著重要作用。
  12. In this paper, regarding the analysis of stability factors of majiatian tailings fill dam, namely regional geologic structure, rock - soil body of dam foundation, poor geology phenomenon, leach consolidation and chemical consolidation of tailings, seepage water of dam body and king - size flood water of majiatian tailings reservoir, a preliminary demonstration on probability of earthquake liquefaction and seepage failure of dam bodys tailings sand soil, of the dam body failure resulted from abutment landslide and of the flood water overflowing crest, as well as on the contribution of leach consolidation and chemical consolidation of tailings to the stability of dam body has been performed

    通過對馬家田尾礦庫區域地質構造、庫區不良地質觀察、尾礦淋濾固結和化學固結、壩體滲透水和庫區特大洪水等因素對馬家田尾礦堆積壩體穩定性影響的分析,初步論證了壩體尾礦砂土的地震液化、滲透破壞、壩肩滑坡使壩體失穩和洪水漫頂的可能性,以及尾礦淋濾固結和化學固結作用有助於壩體的穩定性。
  13. In this paper, regarding the analysis of stability factors of majiatian tailings fill dam, namely regional geologic structure, rock - soil body of dam foundation, poor geology phenomenon, leach consolidation and chemical consolidation of tailings, seepage water of dam body and king - size flood water of majiatian tailings reservoir, a preliminary demonstration on probability of earthquake liquefaction and seepage failure of dam body ' s tailings sand soil, of the dam body failure resulted from abutment landslide and of the flood water overflowing crest, as well as on the contribution of leach consolidation and chemical consolidation of tailings to the stability of dam body has been performed

    通過對馬家田尾礦庫區域地質構造、庫區不良地質觀察、尾礦淋濾固結和化學固結、壩體滲透水和庫區特大洪水等因素對馬家田尾礦堆積壩體穩定性影響的分析,初步論證了壩體尾礦砂土的地震液化、滲透破壞、壩肩滑坡使壩體失穩和洪水漫頂的可能性,以及尾礦淋濾固結和化學固結作用有助於壩體的穩定性。
  14. Arch dam, which is fastened to the base rock, is a high _ order, hyperstatic, spacial body case structure. it has not only arch function but also girder function, but its main loads are passed to each dam abutment by means of arch function

    拱壩是固結于基巖的高次超靜定空間殼體結構,既有拱作用又有梁作用,其主要荷載是通過拱的作用傳到兩岸壩肩。
  15. Although joint spacing is an important index in rock mass structure classification, it ca n ' t be obtained in some regions such as riverbed, so the practicability of using those indexes which characterizing the integrity degree of rock mass to class the rock mass structure is studied, and good coincidence is shown in rock mass structure classification by joint spacing, integrity coefficient and number of joints in dam abutment

    本文研究了用表徵巖體完整程度的指標?完整性系數、 rqd及5m洞段節理條數j _ d (與體積節理數類似)劃分巖體結構類型的可行性。對兩岸壩肩部位,節理間距、完整性系數、 5m洞段節理條數這三項指標劃分的巖體結構類型基本一致;河床壩基部位主要用rqd指標來判斷巖體結構類型。
  16. ( 5 ) rock mass stability analysis on dam abutment of xia luo - yu damsite as follows : in left dam abutment, sideslip control structure has been relatively integrate, and low dip angle jointing did n ' t develop, so integrate sliding deformation control structure could n ' t been formed in three - dimensional space and rock mass stability could n ' t been influenced badly ; in right dam abutment, indicate rock mass distortion was caused by the rock mass mechanics condition, such as specific rock mass structure, compression stress concentrate with high strength and especial landform and so on

    ( 5 )對下落魚壩址壩肩巖體穩定問題的分析得出:左壩肩巖體雖然具有相對較完整的側滑控制結構,但由於緩傾角節理不發育,故在三維空間上不能形成完整的滑移變形控制結構,亦不會對壩肩巖體穩定性產生嚴重影響:右壩肩巖體復雜變形,是在特定的巖體結構、高強度的壓應力集中及特殊的地形等不可或缺的巖體力學條件下產生的。
  17. On the basis of a large number of field geology investigation, the theory on engineering stratification was applied to analyze and study systemically rock mass structural surface of dam abutment, and further throw light on overall character of rock mass structure. by setting up definite structural level model and statistical model, and analyzing further numerical simulation of finite element, the action of rock mass stress and shape distortion has been recognized and apprehended in depth

    本論文以現場地質調查為基礎,應用系統工程層次性理論,對壩肩巖體結構面進行了系統的分析研究,闡明了壩肩巖體結構的總體特徵,建立了壩肩巖體結構的確定性層次模型和統計模型,通過進一步的有限元數值模擬分析,深化對巖體應力形變作用的認識與理解。
  18. Surrounding rock abutment pressure distribution and thickness effect of dynamic catastrophic in fully mechanized sublevel mining stope

    綜放采場圍巖支承壓力分佈及動力災害的層厚效應
  19. It can be shown from the computation results that storage of the reservoir makes the seepage field change, and makes the effective vertical stress in rock foundation near the dam and the tensile stress in the abutment rock mass increase

    計算結果可知,建壩蓄水使壩區滲流場的補給關系發生變化,且使大壩附近的壩基巖體豎向有效應力增大,也使壩肩巖體的拉應力增大。
  20. Based on study above, the deformation and failure character of rock mass of dam abutment has been analyzed by 2d finite element method. and the distinct recognition on stability of rock mass has been got

    在以上研究的基礎上,應用二維有限元分析技術,分析了壩肩巖體的變形破壞特徵,從而對巖體穩定性狀況得出更為明晰的認識。
分享友人